Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2012-04-18 · Office of Electricity Delivery and Energy Reliability, DOE · Proposed Rules

Proposed Rules. Notice of application

712 words·~3 min read·/register/2012/04/18/2012-9319·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Office of Electricity Delivery and Energy Reliability, DOE
Action: Notice of application
Citation: FR Doc. 2012-9319 · OE Docket No. EA-326-A

Summary

Citigroup Energy Canada ULC (CECU) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA).

Dates

Comments, protests, or motions to intervene must be submitted on or before May 18, 2012.

Supplementary Information

Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)). On May 17, 2007, the Department of Energy (DOE) issued Order No. EA-326 authorizing CECU to transmit electric energy from the United States to Canada as a power marketer for a five-year term. The current export authority in Order No. EA-326 will expire on May 17, 2012. On April 3, 2012, CECU filed an application with DOE for renewal of that authority for an additional ten-year term. In its application, CECU states that it “does not currently own or control electric generation or transmission facilities in any wholesale market in interstate commerce or have a power supply system of its own on which its exports of electricity could have a reliability, fuel use, or system stability impact.” CECU states that the electric power proposed to be exported to Canada will be purchased from electric utilities and federal power marketing agencies pursuant to voluntary agreements and will be surplus to the system needs of the entities selling the power to CECU. The application also indicates that CECU is a power marketer authorized by the Federal Energy Regulatory Commission (FERC) to sell energy, capacity, and specified ancillary services at market-based rates. The existing international transmission facilities to be utilized by CECU have previously been authorized by Presidential permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties. Procedural Matters: Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the FERC Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above. Comments on the CECU application to export electric energy to Canada should be clearly marked with OE Docket No. 326-A. An additional copy is to be filed directly with Victoria Sharp, Citigroup Energy Inc., 2800 Post Oak Boulevard, Suite 500, Houston, TX 77056 and with Vincenzo Franco, Esq., Van Ness Feldman, P.C., 1050 Thomas Jefferson St. NW., Seventh Floor, Washington, DC 20007. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE's National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at or by emailing Angela Troy at . Issued in Washington, DC, on April 12, 2012. Brian Mills, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2012-9319 Filed 4-17-12; 8:45 am]

Connectionstraces to 4
1 reference not yet in our index
  • 10 CFR 1021
Citation graph
cites case law
Proposed Rules
Notice of application
Cite10 CFR 1021
Cites 5Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.