Rules and Regulations. Notice of temporary deviation from regulations
/register/2012/03/27/2012-7128·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-7128 · Docket No. USCG-2012-0079 · 33 CFR 117
Summary
The Commander, Fifth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the US 70 Alfred Cunningham Bridge across the Trent River, mile 0.0, at New Bern, NC. The deviation is necessary to accommodate cyclists in the “Cyclist Goin Coastal” charity event. This deviation allows the bridge to remain in the closed position for one-half hour to ensure safe passage for the cyclists.
Dates
This deviation is effective from 8 a.m. through 8:30 a.m. on May 5, 2012.
Supplementary Information
The NC Coastal Land Trust “Cyclist Goin Coastal” Ride Committee on behalf of the North Carolina Department of Transportation has requested a temporary deviation from the current operating regulation of the US 70 Alfred Cunningham Bascule Bridge across the Trent River, mile 0.0, at New Bern, NC. The route of the cycle ride crosses the bridge and the requested deviation is to accommodate a safe and efficient passage across the bridge for the cyclists. To facilitate this event, the draw of the bridge will be maintained in the closed-to-navigation position for one-half hour; from 8 a.m. until 8:30 a.m. on Saturday, May 5, 2012. The vertical clearance for this bridge in the closed position is 14 feet at Mean High Water and unlimited in the open position. The operating regulations are set forth in 33 CFR 117.843(a) which states that during this time period the bridge shall open on signal. Vessels that can pass through the bridge in the closed position may do so at any time. The Coast Guard will inform the waterway users of the closure through our Local Notice to Mariners and other appropriate local media to minimize any impact caused by the temporary deviation. The bridge will be able to open for emergencies. Most vessel traffic utilizing this bridge consists of recreational boaters. This closure is for a small duration of time, therefore, only a small number of boaters may be affected by the temporary closure. There are no alternate routes to the Neuse River from the Trent River. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 29, 2012. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2012-7128 Filed 3-26-12; 8:45 am]
Connectionstraces to 2
- 33 CFR 117