Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2012-01-17 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

442 words·~2 min read·/register/2012/01/17/2012-688·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14311-000] Modern Hydro; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 1, 2011, Modern Hydro filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), to study the feasibility of the proposed Delhi Milldam Water Power Project No. 14311 to be located at the existing Delhi Dam, on the south fork of the Maquoketa River, near the township of Delhi, in Delaware County, Iowa.
The Delhi Dam is owned by the Lake Delhi Recreation Association Board. There are no federal lands associated with the project. The proposed project would consist of:
(1)The existing Delhi Dam and reservoir;
(2)an existing 61-foot-wide concrete powerhouse;
(3)an existing 86-foot-long concrete-gated ogee spillway with three 25-foot-wide vertical sluice gates;
(4)two refurbished 2,400-volt Westinghouse generator units powered by two refurbished S. Morgan Smith turbines with a combined generating capacity of 1,500 kilowatts;
(5)an existing substation connected to an existing 12.5-kilovolt distribution line; and
(6)appurtenant facilities. The project would have an estimated annual generation of 2,960,000 kilowatt-hours. *Applicant Contact:* Mr. Dwight Shanak, N3311 Sunrise Lane, Waupaca, WI 54981,
(715)258-5720. *FERC Contact:* Tyrone A. Williams,
(202)502-6331. Deadline for filing comments, motions to intervene, and competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site *http://www.ferc.gov/docs-filing/efiling.asp* . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp* . You must include your name and contact information at the end of your comments. For assistance, please contact *FERC Online Support at FERCOnlineSupport@ferc.gov* or toll free at 1-(866) 208-3676, or for TTY,
(202)502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp* . Enter the docket number (P-14311-000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-688 Filed 1-13-12; 8:45 am]
Connectionstraces to 2
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.