Rules and Regulations. Notice of temporary deviation from regulations
/register/2012/01/05/2011-33824·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2011-33824 · Docket No. USCG-2011-1139 · 33 CFR 117
Summary
The Commander Fifth Coast Guard District has issued a temporary deviation from the regulations governing the operation of the Corson Inlet Bridge (County Route 619), across Corson Inlet, mile 0.9 in Strathmere, NJ. The deviation is necessary to facilitate the replacement of the steel railing. This deviation restricts operation of the draw span; no openings will be allowed during the course of the project, while the railings on the moveable span portion of the bridge are replaced.
Dates
This deviation is effective from 5 a.m. on January 15, 2012 until 5 p.m. on February 15, 2012.
Supplementary Information
The Cape May County Bridge Commission, who owns and operates this bascule drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.714 to facilitate the replacement of the bridge railings. Under the regular operating schedule, the bridge operates as follows: The draw shall open on signal; however, from October 1 through May 15 from 10 p.m. to 6 a.m. and from 6 a.m. to 10 p.m. on December 25 the draw need open only if at least two hours notice is provided. The Corson Inlet Bridge (CR-619) at mile 0.9, across Corson Inlet in Strathmere, NJ has a vertical clearance in the closed position to vessels of 15 feet above mean high water (MHW). Under this temporary deviation, the Corson Inlet Bridge will be closed to vessels requiring an opening, from 5 a.m. on January 15, 2012 to 5 p.m. on February 15, 2012. The drawbridge will not be able to open in the event of an emergency. Vessels that can pass under the bridge without a bridge opening may do so at all times. Vessels have an alternate ocean route to the south through Townsends Inlet. Though the span will be closed for the project, the 15 feet of vertical navigation clearance will remain available throughout the project. Furthermore, the 50 feet of horizontal clearance will be reduced to 25 feet temporarily only if/when barges are used beneath the span to facilitate this project. Historically, there were no vessel openings provided for the months of January through February in 2011. The Coast Guard has coordinated the restrictions with the Cape May County Bridge Commission/contractor and will inform the other users of the waterways through our Local and Broadcast Notices to Mariners of the closure periods for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 22, 2011. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2011-33824 Filed 1-4-12; 8:45 am]