Code · REGISTER · 2011-11-29 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

519 words·~2 min read·/register/2011/11/29/2011-30720·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2011-30720 · Docket No. USCG-2011-1034 · 33 CFR 117

Summary

The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the General Edwards Bridge at mile 1.7, across the Saugus River between Lynn and Revere, Massachusetts. The deviation is necessary to facilitate scheduled bridge rehabilitation. This deviation allows the bridge to open upon a 48 hour advance notice during the rehabilitation period.

Dates

This deviation is effective from November 21, 2011 through April 24, 2012.

Supplementary Information

The General Edwards Bridge, across the Saugus River at mile 1.7 between Lynn and Revere, Massachusetts, has a vertical clearance in the closed position of 27 feet at mean high water and 36 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.618(b). The waterway users are recreational vessels of various sizes. The bridge opened only 9 times between November and April since 2002 and there were no openings between November and April in 2010. During the winter months the bridge rarely opens since the recreational vessels that transit this waterway are normally in winter storage. The owner of the bridge, Massachusetts Department of Transportation, requested a temporary deviation from the regulations to help facilitate rehabilitation at the bridge. Under this temporary deviation the General Edwards Bridge shall operate as follows: From November 21, 2011 through April 24, 2012, the draw shall open after at least a 48 hour advance notice is given by calling the Massachusetts DOT Highway Operations Center at 1-(800) 227-0608. Vessels that can pass under the bridge in the closed position may do so at any time. The Coast Guard believes that this temporary deviation should meet the reasonable needs of navigation because the mariners that normally use this bridge are recreational vessels that do not operate during the winter months when this deviation will be in effect. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: November 16, 2011. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2011-30720 Filed 11-28-11; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.