Rules and Regulations. Notice of temporary deviation from regulations
/register/2011/11/17/2011-29652·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2011-29652 · Docket No. USCG-2011-1042 · 33 CFR 117
Summary
The Commander, Eleventh Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Third Street Drawbridge across China Basin, mile 0.0, at San Francisco, CA. The deviation is necessary to allow the City of San Francisco to inspect the bridge structure as required by the U.S. Department of Transportation. This deviation allows the bridge to be secured in the closed-to-navigation position during the deviation period.
Dates
This deviation is effective from 10 a.m. to 2 p.m. on November 16, 2011.
Supplementary Information
The City of San Francisco requested a temporary change to the operation of the Third Street Drawbridge, mile 0.0, over China Basin, at San Francisco, CA. The drawbridge navigation span provides a vertical clearance of 3 feet above Mean High Water in the closed-to-navigation position. As required by 33 CFR 117.149, the draw shall open on signal if at least one hour notice is given to the San Francisco Department of Public Works. Navigation on the waterway is commercial and recreational. The Third Street Drawbridge will be secured in the closed-to-navigation position from 10 a.m. to 2 p.m. on November 16, 2011, to allow the City of San Francisco to inspect the bridge structure as required by the U.S. Department of Transportation. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were received. Vessels that can transit the bridge, while in the closed-to-navigation position, may continue to do so at any time. In the event of an emergency, the drawbridge can open upon one hour notice. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: November 3, 2011. D.H. Sulouff, Bridge Section Chief, Eleventh Coast Guard District. [FR Doc. 2011-29652 Filed 11-16-11; 8:45 am]
Connectionstraces to 2
- 33 CFR 117