Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2011-11-17 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

482 words·~2 min read·/register/2011/11/17/2011-29652·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2011-29652 · Docket No. USCG-2011-1042 · 33 CFR 117

Summary

The Commander, Eleventh Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Third Street Drawbridge across China Basin, mile 0.0, at San Francisco, CA. The deviation is necessary to allow the City of San Francisco to inspect the bridge structure as required by the U.S. Department of Transportation. This deviation allows the bridge to be secured in the closed-to-navigation position during the deviation period.

Dates

This deviation is effective from 10 a.m. to 2 p.m. on November 16, 2011.

Supplementary Information

The City of San Francisco requested a temporary change to the operation of the Third Street Drawbridge, mile 0.0, over China Basin, at San Francisco, CA. The drawbridge navigation span provides a vertical clearance of 3 feet above Mean High Water in the closed-to-navigation position. As required by 33 CFR 117.149, the draw shall open on signal if at least one hour notice is given to the San Francisco Department of Public Works. Navigation on the waterway is commercial and recreational. The Third Street Drawbridge will be secured in the closed-to-navigation position from 10 a.m. to 2 p.m. on November 16, 2011, to allow the City of San Francisco to inspect the bridge structure as required by the U.S. Department of Transportation. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were received. Vessels that can transit the bridge, while in the closed-to-navigation position, may continue to do so at any time. In the event of an emergency, the drawbridge can open upon one hour notice. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: November 3, 2011. D.H. Sulouff, Bridge Section Chief, Eleventh Coast Guard District. [FR Doc. 2011-29652 Filed 11-16-11; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.