Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2011-10-31 · DEPARTMENT OF ENERGY · Rules and Regulations

Rules and Regulations. DEPARTMENT OF ENERGY

514 words·~2 min read·/register/2011/10/31/2011-28086·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14256-000] Windsor Machinery Co., Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 15, 2011, Windsor Machinery Co., Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Braendly Hydroelectric Project to be located on Fishkill Creek in Dutchess County, New York.
The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed project would redevelop an abandoned project and consist of:
(1)An existing 130-foot-long, 18-foot-high cut stone with a concrete cap dam creating a reservoir with a surface area of approximately 3.04 acres and a total storage capacity of 15 acre-feet at a normal maximum operating elevation of 119.5 feet mean sea level (msl);
(2)a new 5-foot-diameter, 200-foot-long penstock replacing an existing penstock in its entirety;
(3)a new 35-foot-long by 35-foot-wide 3-storey high powerhouse at the site of an original powerhouse containing one turbine unit with a rated capacity of 225 kilowatts;
(4)an existing 10-foot-long by 5-foot-wide tailrace;
(5)a new 480-volt, 400-foot-long transmission line extending from the powerhouse to a nearby building; and
(6)appurtenant facilities. The project would have an annual generation of 1,600 megawatt-hours. *Applicant Contact:* Sarah L. Bower, Windsor Machinery Co., Inc., 16 Orbit Lane, Hopewell Junction, NY 12533; phone:
(845)897-4194. *FERC Contact:* Monir Chowdhury; phone:
(202)502-6736. *Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications:* 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site *http://www.ferc.gov/docs-filing/efiling.asp.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll free at 1-(866) 208-3676, or for TTY,
(202)502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-14256-000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011-28086 Filed 10-28-11; 8:45 am]
Connectionstraces to 2
Citation graph
cites case law
Rules and Regulations
DEPARTMENT OF ENERGY
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.