BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2305-036] Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* New Major License. b. *Project No.:* 2305-036. c. *Date Filed:* September 30, 2011. d. *Applicant:* Sabine River Authority of Texas and Sabine River Authority, State of Louisiana (Sabine River Authorities). e. *Name of Project:* Toledo Bend Hydroelectric Project. f. *Location:* On the Sabine River, affecting lands and waters in Panola, Shelby, Sabine, and Newton Counties, Texas, and De Soto, Sabine, and Vernon Parishes, Louisiana.
The project occupies about 3,600 acres of United States lands under the jurisdiction of the Forest Service. g. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791(a)-825(r). h. *Applicant Contact:* Mr. Melvin T. Swoboda, Licensing Manager, Toledo Bend Project Joint Operation, P.O. Box 579, Orange, Texas 77631-0579, 409-746-2192; *mswoboda@sratx.org* . Mr. Jerry L. Clark, General Manager, Sabine River Authority of Texas, P.O. Box 579, Orange, Texas 77631-0579. 409-746-2192; *jclark@sratx.org* Mr.
James Pratt, Executive Director, Sabine River Authority, State of Louisiana, 15091 Texas Highway, Many, Louisiana 71449-5718, 318-256-4112; *jimpratt@dotd.louisiana.gov* . Mr. Charles R. Sensiba, Van Ness Feldman, P.C., 1050 Thomas Jefferson Street, NW., Washington, DC 20007, 202-298-1800. i. *FERC Contact:* Alan Mitchnick at
(202)502-6074 or e-mail at *alan.mitchnick@ferc.gov.* j. This application is not ready for environmental analysis at this time. k. *The Project Description:* The existing Toledo Bend Project (figure 2) consists of:
(1)A rolled, earth-fill embankment, approximately 11,250 feet long (including saddle dikes) with a top width of 25 feet and maximum height of approximately 112 feet;
(2)an approximately 185,000-surface acre, 85-mile-long reservoir, with an active storage capacity of 4,477,000 acre-feet at full pool (172 feet) and 1,200 miles of shoreline;
(3)a 838-foot-long spillway located along the north dam abutment in Louisiana, comprised of a concrete, gravity-type, gated weir with a concrete chute and stilling basin and a discharge channel on the left abutment with eleven 40-foot by 28-foot tainter gates;
(4)a 80-foot-wide, 55-foot-high powerhouse located in the right abutment, containing two vertical Kaplan turbines with an authorized installed capacity of 81 megawatts (MW); and
(5)a 220-foot-long, concrete tailrace segment leading into a 2-mile-long, excavated channel that eventually merges with the Sabine River;
(6)a 138-kilovolt, primary transmission line leading from the powerhouse to the project switchyard, located immediately adjacent to the tailrace; and
(7)a station transformer, located to the immediate south of and adjacent to the powerhouse. The Sabine River Authorities propose to construct a 1.3-MW minimum flow turbine-generator at the project spillway. l. *Locations of the Application:* A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at 1-866-208-3676, or for TTY,
(202)502-8659. A copy is also available for inspection and reproduction at the address in item
(h)above. m. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. *Procedural Schedule:* The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis 11/29/2011 Filing of recommendations, preliminary terms and conditions, and fishway prescriptions 1/28/2012 Commission issues Draft EIS 7/26/2012 Comments on Draft EIS due 9/24/2012 Modified Terms and Conditions due 11/23/2012 Commission Issues Final EIS 2/21/2013 o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: October 7, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011-26600 Filed 10-13-11; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.