Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2011-10-06 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

505 words·~2 min read·/register/2011/10/06/2011-25836

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14236-000] NortHydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 29, 2011, NortHydro, LLC (NortHydro or applicant) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), to study the feasibility of developing the proposed 16.4 Wasteway Hydroelectric project (project) near Richland in Franklin County, Washington.
The wasteway was constructed by the U.S Bureau of Reclamation as part of the Columbia Basin Project, and is situated within and operated by the South Columbia Basin Irrigation District. The wasteway functions as a diversion of surplus water from the irrigation system. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The project would collect all excess flows below the wasteway outlet structure. The following new facilities are proposed:
(1)A diversion structure that would collect water from the wasteway;
(2)three 63-inch diameter, 4,900 foot-long underground penstocks connecting the diversion structure with a powerhouse;
(3)three turbine/generator units with a combined capacity of 1,750 kilowatts;
(4)a 7.5-mile-long, 115-kilovolt transmission line connecting to the existing Ringold substation; and
(5)appurtenant facilities. The estimated annual generation of the project would be 10.0 gigawatt-hours. *Applicant Contact:* Mr. Darius Ruen, P.E., NortHydro, LLC, 3201 Huetter Road, Suite 102, Coeur d'Alene, Idaho 83814; phone
(208)292-0820. *FERC Contact:* Patrick Murphy; phone
(202)502-8755. *Deadline for Filing Comments, Motions to Intervene, Competing Applications (Without Notices of Intent), or Notices of Intent to File Competing Applications:* 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site *http://www.ferc.gov/docs-filing/efiling.asp.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll free at 1-866-208-3676, or for TTY,
(202)502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-14236-000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: September 29, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011-25836 Filed 10-5-11; 8:45 am]
Connectionstraces to 2
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.