Unknown. Final rule
8,001 words·~36 min read·
/register/2011/06/30/2011-16143·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
--- schema: federal-register doc_type: fedreg source_file: FR-2011-06-30.xml --- 76 126 Thursday, June 30, 2011 Contents Agency Health Agency for Healthcare Research and Quality NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38397-38399 2011-16213 Agricultural Research Agricultural Research Service NOTICES Appointment of Committee Members to the Advisory Committee on Biotechnology and 21st Century Agriculture, 38348 2011-16431 Agriculture Agriculture Department See Agricultural Research Service See Animal and Plant Health Inspection Service See Forest Service See Rural Housing Service Animal Animal and Plant Health Inspection Service PROPOSED RULES Implementation of Revised Lacey Act Provisions, 38330-38332 2011-16406 NOTICES Pest Risk Analysis for the Importation of Dragon Fruit from Thailand into the Continental U.S.;
Availability, 38349 2011-16405 Antitrust Division Antitrust Division NOTICES Proposed Final Judgment and Competitive Impact Statement: United States v. Georges Foods, LLC, et al., 38419-38427 2011-16354 Architectural Architectural and Transportation Barriers Compliance Board NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38355-38356 2011-16510 Bureau of Ocean Energy Management, Regulation and Enforcement RULES Oil and Gas and Sulphur Operations in the Outer Continental Shelf;
Civil Penalties, 38294-38296 2011-16288 NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Geological and Geophysical Explorations of the OCS, 38412-38414 2011-16438 Pollution Prevention and Control, 38410-38412 2011-16442 Centers Disease Centers for Disease Control and Prevention NOTICES Assessing the Current Research, Policy, and Practice Environment in Public Health Genomics, 38399-38400 2011-16422 Centers Medicare Centers for Medicare & Medicaid Services PROPOSED RULES Medicare Programs:
Clinical Laboratory Fee Schedule; Signature on Requisition, 38342-38347 2011-16366 Children Children and Families Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Evaluation of Tribal Health Profession Opportunity Grants, 38400-38401 2011-16212 Coast Guard Coast Guard RULES Safety Zones: Annual Fireworks Events in Captain of Port Detroit Zone, 38304-38305 2011-16408 Cape Charles Fireworks, Cape Charles Harbor, Cape Charles, VA, 38302-38304 2011-16353 Marine Events, Captain of Port, Sault Sainte Marie, 38297-38300 2011-16339 San Francisco Chronicle Fireworks Display, San Francisco, CA, 38305 2011-16115 Shore Thing and Independence Day Fireworks, Chesapeake Bay, Norfolk, VA, 38300-38302 2011-16357 Commerce Commerce Department See Foreign-Trade Zones Board See International Trade Administration See National Oceanic and Atmospheric Administration Commodity Futures Commodity Futures Trading Commission PROPOSED RULES Reducing Regulatory Burden;
Retrospective Review under E.O. 13563, 38328-38330 2011-16430 Consumer Product Consumer Product Safety Commission NOTICES Meetings; Sunshine Act, 38371 2011-16588 Copyright Office Copyright Office, Library of Congress RULES Fees for Special Handling of Registration Claims, 38306 2011-16432 Corporation Corporation for National and Community Service NOTICES Meetings; Sunshine Act, 38371 2011-16658 Defense Department Defense Department NOTICES Arms Sales Notifications, 38371-38374 2011-16446 Education Education Department NOTICES Applications for New Awards:
Literacy Information and Communication System Regional Professional Development Centers, 38374-38380 2011-16480 Energy Department Energy Department See Energy Efficiency and Renewable Energy Office See Federal Energy Regulatory Commission RULES Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment, 38287-38293 2011-16143 Energy Efficiency Energy Efficiency and Renewable Energy Office NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 38380-38381 2011-16583 Environmental Protection Environmental Protection Agency PROPOSED RULES Approval and Promulgation of Air Quality Implementation Plans; District of Columbia, Maryland, and Virginia; 2002 Base Year Emission Inventory, Reasonable Further Progress Plan, etc., 38334-38340 2011-16376 Revisions to California State Implementation Plan: San Joaquin Valley Unified Air Pollution Control District, 38340-38341 2011-16500 NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals: Water Quality Standards, 38384-38387 2011-16508 Draft Toxicological Review of Acrylonitrile, 38387-38388 2011-16487 Settlements: Caraleigh Phosphate and Fertilizer Works Superfund Site, Raleigh, NC, 38389 2011-16490 Executive Office of the President See Science and Technology Policy Office Farm Credit System Insurance Farm Credit System Insurance Corporation NOTICES Policy Statements: Adjustments to the Insurance Premiums and the Secure Base Amount and Allocated Insurance Reserves Accounts, 38389-38395 2011-16371 Federal Aviation Federal Aviation Administration PROPOSED RULES Airworthiness Directives:
Boeing Co. Model MD-11 and MD-11F Airplanes, 38332-38334 2011-16479 Federal Communications Federal Communications Commission RULES Digital Television Signals Pursuant to the Satellite Home Viewer Extension and Reauthorization Act, 38306-38307 2011-16440 NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38395 2011-16441 Federal Energy Federal Energy Regulatory Commission NOTICES Environmental Assessments; Availability, etc.: Public Utility District No. 2 of Grant County, WA, 38381 2011-16472 Filings:
Public Service Company of Colorado, 38382 2011-16469 Texas Eastern Transmission, LP, 38381-38382 2011-16470 License Applicatons: William Arkoosh, 38382 2011-16476 Meetings: Electric Quarterly Reports Users Group, 38383 2011-16471 Stuyvesant Falls Hydroelectric Project, Albany Engineering Corp., Stuyvesant, NY, 38383 2011-16473 Preliminary Permit Applications: Ballville Hydroelectric Group, LLC, 38383-38384 2011-16474 Records Governing Off-the-Record Communications, 38384 2011-16468 Federal Railroad Federal Railroad Administration NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 38452-38453 2011-16475 Petitions for Waivers of Compliance, 38453-38457 2011-16407 2011-16409 2011-16410 2011-16411 2011-16412 2011-16413 2011-16414 Federal Reserve Federal Reserve System NOTICES Formations of, Acquisitions by, and Mergers of Bank Holding Companies, 38395-38396 2011-16516 Fiscal Fiscal Service NOTICES Surety Companies Acceptable on Federal Bonds; Redomestications and Changes in Business Addresses: National Farmers Union Property and Casualty Co., 38459 2011-16205 Surety Companies Acceptable on Federal Bonds;
Terminations: American Reliable Insurance Co., 38459 2011-16203 Fish Fish and Wildlife Service PROPOSED RULES Endangered and Threatened Wildlife and Plants: 12-Month Finding on a Petition to List a Distinct Population Segment of the Fisher in Its Northern Rocky Mountain Range with Critical Habitat, 38504-38532 2011-16349 NOTICES Environmental Assessments; Availability, etc.: James Campbell National Wildlife Refuge, Honolulu County, HI, 38414-38415 2011-16466 Foreign Assets Foreign Assets Control Office RULES Specially Designated Nationals and Blocked Persons;
Blocked Vessels; Persons Determined to be Government of Iran: Alphabetical Listings, 38534-38546 2011-16463 NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Rough Diamonds Reporting Requirements, 38459-38460 2011-16589 Foreign Trade Foreign-Trade Zones Board NOTICES Applications for Reorganizations under Alternative Site Framework: Foreign-Trade Zone 124, Gramercy, LA, 38356-38357 2011-16486 Reorganizations Under Alternative Site Framework:
Foreign-Trade Zone 102, St. Louis, MO, 38357 2011-16484 Forest Forest Service NOTICES Environmental Impact Statements; Availability, etc.: Northeast Washington Zone Forest Plan Revision; Colville and Okanogan-Wenatchee National Forests, WA, 38349-38352 2011-15557 General Services General Services Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: General Services Administration Acquisition Regulation; Zero Burden Information Collection Reports, 38396 2011-16347 Health and Human Health and Human Services Department See Agency for Healthcare Research and Quality See Centers for Disease Control and Prevention See Centers for Medicare & Medicaid Services See Children and Families Administration See Health Resources and Services Administration See National Institutes of Health NOTICES Proposed Data Collection Standards:
Race, Ethnicity, Primary Language, Sex, and Disability Status Required by the Affordable Care Act, 38396-38397 2011-16435 Health Resources Health Resources and Services Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38401 2011-16478 Homeland Homeland Security Department See Coast Guard Housing Housing and Urban Development Department RULES SAFE Mortgage Licensing Act; Minimum Licensing Standards and Oversight Responsibilities, 38464-38501 2011-15672 NOTICES Credit Watch Termination Initiative:
Termination of Direct Endorsement Approval, 38407-38408 2011-16489 Termination of Origination Approval Agreements, 38406-38407 2011-16518 Funding Availabilities: Fiscal Year 2011 HOPE VI Main Street Grants, 38408-38409 2011-16492 Meetings: Manufactured Housing Consensus Committee; Conference Call, 38409 2011-16495 Interior Interior Department See Bureau of Ocean Energy Management, Regulation and Enforcement See Fish and Wildlife Service See Land Management Bureau NOTICES Meetings:
Advisory Committee on Water Information, 38409-38410 2011-16415 International Trade Adm International Trade Administration NOTICES Antidumping Duty Reviews: Diamond Sawblades and Parts Thereof from the People's Republic of China, 38357-38359 2011-16498 Quarterly Update of Annual Listing of Foreign Government Subsidies on Articles of Cheese Subject to an In-Quota Rate of Duty, 38359-38360 2011-16497 Rescission of Antidumping Duty Administrative Review: Certain Frozen Warmwater Shrimp from Brazil, 38360 2011-16491 International Trade Com International Trade Commission NOTICES Commission Determinations:
Certain Multimedia Display and Navigation Devices and Systems, Components Thereof, and Products Containing Same, 38417 2011-16317 Investigations: Certain Protective Cases and Components Thereof, 38417-38419 2011-16361 Justice Department Justice Department See Antitrust Division Labor Department Labor Department See Occupational Safety and Health Administration Land Land Management Bureau NOTICES Filing of Plats, 38415-38416 2011-16483 Filing of Plats of Survey: Montana, 38416 2011-16424 Segregation of Public Lands:
Arizona, California, Colorado, Nevada, New Mexico, and Utah, 38416-38417 2011-16429 Library Library of Congress See Copyright Office, Library of Congress NASA National Aeronautics and Space Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38429 2011-16416 National Highway National Highway Traffic Safety Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38457-38458 2011-16374 National Institute National Institutes of Health NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals: Formative Research Methodology Studies for National Children's Study, 38401-38403 2011-16528 Meetings: Center for Scientific Review, 38404-38405 2011-16464 2011-16532 2011-16534 National Center for Complementary and Alternative Medicine, 38404 2011-16477 National Institute of Allergy and Infectious Diseases, 38405-38406 2011-16465 National Institute of Mental Health, 38403-38404 2011-16457 2011-16460 National Institute of Neurological Disorders and Stroke, 38406 2011-16461 National Oceanic National Oceanic and Atmospheric Administration RULES Fisheries of Northeastern United States:
Recreational Management Measures for Summer Flounder, Scup, and Black Sea Bass Fisheries, 38307-38313 2011-16517 Magnuson-Stevens Act Provisions; Biennial Specifications and Management Measures; Inseason Adjustments: Fisheries off West Coast States; Pacific Coast Groundfish Fishery, 38313-38325 2011-16512 NOTICES Meetings: Monitoring Changes in Extreme Storm Statistics; State of Knowledge, 38360-38361 2011-16428 Permits: Marine Mammals; File No. 15488, 38361 2011-16519 Takes of Marine Mammals Incidental to Specified Activities:
Test Pile Program, 38361-38370 2011-16515 Western Pacific Fisheries: Approval of Marine Conservation Plan for Pacific Insular Areas; Western Pacific Sustainable Fisheries Fund, 38370-38371 2011-16454 National Science National Science Foundation NOTICES Environmental Impact Statements; Availability, etc.: Marine Seismic Research Funded by National Science Foundation or Conducted by U.S. Geological Survey, 38429-38430 2011-16337 Occupational Safety Health Adm Occupational Safety and Health Administration NOTICES Meetings:
Maritime Advisory Committee for Occupational Safety and Health, 38428-38429 2011-16425 Personnel Personnel Management Office PROPOSED RULES Qualification Requirements (General), 38326-38328 2011-16272 Public Debt Public Debt Bureau See Fiscal Service Rural Housing Service Rural Housing Service NOTICES Funding Availability: Rural Development Voucher Program, 38352-38355 2011-16458 Science Technology Science and Technology Policy Office NOTICES National Science and Technology Council Subcommittee on Forensic Science, 38430 2011-16404 Securities Securities and Exchange Commission RULES Risk Management Controls for Brokers or Dealers with Market Access, 38293-38294 2011-16467 NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 38430-38431 2011-16426 2011-16427 Applications for Deregistration under the Investment Company Act, 38431-38432 2011-16419 Applications: TIAA-CREF Funds, et al., 38432-38434 2011-16403 Self-Regulatory Organizations; Proposed Rule Changes: International Securities Exchange, LLC, 38434-38436 2011-16397 NASDAQ OMX PHLX LLC, 38444-38446 2011-16418 2011-16433 NYSE Amex LLC, 38436-38443, 38446-38447 2011-16417 2011-16448 Suspensions of Trading Orders:
International Poultry Co., Inc; International Thoroughbred Breeders, Inc.; Internet Marketing, Inc., et al., 38448 2011-16567 Sentencing Commission, United States See United States Sentencing Commission Social Social Security Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38448-38450 2011-16420 2011-16421 State Department State Department NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38450-38452 2011-16455 Culturally Significant Object Imported for Exhibition Determinations:
King Amenemhet II, 38452 2011-16453 Transportation Department Transportation Department See Federal Aviation Administration See Federal Railroad Administration See National Highway Traffic Safety Administration Treasury Treasury Department See Fiscal Service See Foreign Assets Control Office NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 38458 2011-16382 U.S. Sentencing United States Sentencing Commission NOTICES Sentencing Guidelines for United States Courts, 38460 2011-16494 Veteran Affairs Veterans Affairs Department NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals: Authorization and Certification of Entrance or Reentrance into Rehabilitation and Certification of Status, 38460-38461 2011-16506 Separate Parts In This Issue Part II Housing and Urban Development Department, 38464-38501 2011-15672 Part III Interior Department, Fish and Wildlife Service, 38504-38532 2011-16349 Part IV Treasury Department, Foreign Assets Control Office, 38534-38546 2011-16463 Reader Aids Consult the Reader Aids section at the end of this page for phone numbers, online resources, finding aids, reminders, and notice of recently enacted public laws.
To subscribe to the Federal Register Table of Contents LISTSERV electronic mailing list, go to http://listserv.access.gpo.gov and select Online mailing list archives, FEDREGTOC-L, Join or leave the list (or change settings); then follow the instructions. 76 126 Thursday, June 30, 2011 Rules and Regulations DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY:
Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Final rule. SUMMARY: The U.S. Department of Energy (DOE or the “Department”) is adopting amendments to the compliance dates for manufacturers to submit certification reports for the certification provisions for commercial refrigeration equipment; commercial heating, ventilating, air-conditioning
(HVAC)equipment; commercial water heating
(WH)equipment; and automatic commercial ice makers, which are covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the “Act”). Manufacturers of these products will be required to submit certification reports no later than December 31, 2012. DATES: This rule is effective July 5, 2011. ADDRESSES: This rulemaking can be identified by docket number EERE-2010-BT-CE-0014 and/or RIN number 1904-AC23. *Docket:* The docket is available for review at *http://www.regulations.gov,* including **Federal Register** notices, public meetings attendee lists, transcripts, comments, and other supporting documents/materials. All documents in the docket are listed in the *http://www.regulations.gov* index. However, not all documents listed in the index may be publicly available, such as information that is exempt from public disclosure. For further information on how to review public comments or view hard copies of the docket in the Resource Room, contact Ms. Brenda Edwards at
(202)586-2945 or e-mail: *Brenda.Edwards@ee.doe.gov.* FOR FURTHER INFORMATION CONTACT: Ms. Ashley Armstrong, U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Building Technologies Program, EE-2J, 1000 Independence Avenue, SW., Washington, DC 20585-0121. E-mail: *Ashley.Armstrong@ee.doe.gov;* and Ms. Celia Sher, U.S. Department of Energy, Office of the General Counsel, Forrestal Building, GC-71, 1000 Independence Avenue, SW., Washington, DC 20585. Telephone:
(202)287-6122. E-mail: *Celia.Sher@hq.doe.gov.* SUPPLEMENTARY INFORMATION: I. Introduction A. Authority Title III of the Energy Policy and Conservation Act of 1975, as amended (“EPCA” or “the Act”) sets forth a variety of provisions designed to improve energy efficiency. Part A of Title III (42 U.S.C. 6291-6309) provides for the Energy Conservation Program for Consumer Products Other Than Automobiles. The National Energy Conservation Policy Act (NECPA), Public Law 95-619, amended EPCA to add Part A-1 of Title III, which established an energy conservation program for certain industrial equipment. (42 U.S.C. 6311-6317) 1 1 For editorial reasons, Parts B (consumer products) and C (commercial equipment) of Title III of EPCA were re-designated as parts A and A-1, respectively, in the United States Code. Sections 6299-6305, and 6316 of EPCA authorize DOE to enforce compliance with the energy and water conservation standards (all non-product specific references herein referring to energy use and consumption include water use and consumption; all references to energy efficiency include water efficiency) established for certain consumer products and commercial equipment. (42 U.S.C. 6299-6305 (consumer products), 6316 (commercial equipment)) DOE has promulgated enforcement regulations that include specific certification and compliance requirements. * See* 10 CFR part 429; 10 CFR part 431, subparts B, U, and V. B. Background On March 7, 2011, DOE published a final rule in the **Federal Register** that, among other things, modified the requirements regarding manufacturer submission of compliance statements and certification reports to DOE (March 2011 final rule). 76 FR 12421. This rule was largely procedural in nature; it did not amend pre-existing sampling provisions, test procedures, or conservation standard levels for any covered products or equipment. It did, however, impose new or revised reporting requirements for some types of covered products and equipment, including a requirement that manufacturers submit annual reports to the Department certifying compliance of their basic models with applicable standards. Finally, the Department emphasized that manufacturers could use their discretion in grouping individual models as a “basic model” such that the certified rating for the basic model matched the represented rating for all included models. *See* 76 FR 12428-12429 for more information. This reflected a basic requirement of the Department's longstanding self-certification compliance regime—that efficiency certifications and representations must be supported by either testing or an approved alternative method of estimating efficiency. Since the publication of the March 2011 final rule, certain manufacturers of particular types of commercial and industrial equipment have stated that they would be unable to meet the July 5th deadline for complying with the certification requirements. In particular, manufacturers of commercial refrigeration equipment; commercial HVAC equipment; commercial WH equipment; walk-in coolers; walk-in freezers; and automatic commercial ice makers (as defined in 10 CFR part 431) contend that certifying supported basic model ratings under the revised provisions would require a cost-prohibitive amount of additional testing and take far longer than the time allowed. Some commercial manufacturers also expressed concern over DOE's regulations for alternative efficiency determination methods (AEDMs), which are intended to reduce testing burdens by allowing manufacturers to use computer simulations, mathematical models, and other alternative methods to determine the amount of energy used or efficiency by a particular basic model. These manufacturers suggested that the AEDM provisions are too restrictive, overly burdensome, and unavailable for some products that would benefit from them and, as a result, do not permit the viable alternative to testing intended by the Department. The Department responded in part to these concerns by taking two immediate steps. On April 8, 2011, DOE issued a request for information
(RFI)(available at *http://www.eere.energy.gov/buildings/appliance_standards/pdfs/arm_aedms_rfi.pdf* ) seeking comment on, among other things, the use of such alternative methods for determining the efficiency of commercial and industrial equipment. 76 FR 21673 (April 18, 2011). As the RFI explained, the Department intends to use this information to propose revisions and expansions, as necessary, to the existing AEDM provisions in a future rulemaking. The Department expects that addressing manufacturers' concerns with the AEDM provisions may alleviate some of industry's estimated burden of complying with DOE's existing testing regulations and allow the development of the data necessary to file the certifications and compliance reports as required by the March 2011 final rule. Given the testing burdens reported by certain commercial manufacturers and the Department's recent RFI on alternative ways to estimate efficiency in lieu of testing, on April 19, 2011, DOE published in the **Federal Register** , a notice of proposed rulemaking regarding the compliance date for certification of certain commercial and industrial equipment (April 2011 NOPR). 76 FR 21813. In the April 2011 NOPR, DOE proposed an 18-month extension to the compliance date for the certification provisions for commercial refrigeration equipment; commercial HVAC equipment; commercial WH equipment; walk-in coolers; walk-in freezers; and automatic commercial ice makers. In the April 2011 NOPR, the Department sought comment on whether a limited reporting requirement should be required of manufacturers of these types of commercial equipment during an interim 18-month period. Additionally, the Department noted it was considering extending the compliance date for the certification provisions for other commercial equipment based on comments from interested parties. *Id.* II. Discussion of Comments The Department received comments on the April 2011 NOPR from a number of interested commenters, including various manufacturers, trade associations, and advocacy groups. The comments and DOE's responses to them are generally discussed below. A. Extension of Certification Deadline for Commercial Refrigeration Equipment; HVAC Equipment; Commercial WH Equipment; and Automatic Commercial Ice Makers As stated above, DOE proposed a tentative 18-month extension to the compliance date for filing complete certification reports for manufacturers of commercial refrigeration equipment; commercial HVAC equipment; commercial WH equipment; walk-in coolers; walk-in freezers; and automatic commercial ice makers in the April 2011 NOPR. 76 FR 21815. Most commenters were in support of such an extension, including the Air-Conditioning, Heating, and Refrigeration Institute (AHRI), Traulsen, International Cold Storage (ICS), Crown Tonka, ThermalRite (ICS, Crown Tonka and ThermalRite hereafter referred to as “Joint Manufacturers”), Carrier Corporation (Carrier), National Automatic Merchandising Association (NAMA), AAON, Inc. (AAON), Lennox International Inc. (Lennox), Heatcraft Refrigeration Products LLC (Heatcraft), Hill Phoenix Walk-Ins (Hill Phoenix), Royal Vendors, Inc., Appliance Standards Awareness Project (ASAP), American Council for an Energy-Efficient Economy (ACEE), and the Natural Resources Defense Council
(NRDC)(ASAP, ACEEE, and NRDC hereafter referred to as “Joint Advocacy Comments”). (AHRI, No. 113.1 at p. 1; Traulsen, No. 111.1 at p. 1; Joint Manufacturers, No. 115.1 at p. 1; Carrier, No. 114.1 at p. 1; NAMA, No. 116.1 at p. 2; AAON, No. 118.1 at p. 1; Lennox, No. 119.1 at p. 1; Heatcraft, No. 124.1 at p. 1; Hill Phoenix, No. 121.1 at p. 1; Royal Vendors, Inc., No. 123.1 at p. 1; Joint Advocacy Comments, No. 125.1 at p. 1) For example, Traulsen commented that the proposed extension should provide a significant time frame required to review and adjust the open issues such as sample size, tolerances, and base models. (Traulsen, No. 111.1 at p. 1) Carrier additionally commented that the proposed 18-month extension is warranted to revise the AEDM procedures to reduce the envisioned testing burden. (Carrier, No. 114.1 at p. 2) Carrier further requested that DOE amend the confidence level to be used for calculating energy efficiency levels for commercial HVAC equipment, noting an inconsistency in the confidence levels used for commercial HVAC equipment and residential central air conditioners and heat pumps in the March 2011 final rule. (Carrier, No. 114.1 at p. 2) The Joint Advocacy Comments noted their support of DOE's proposal to extend the certification deadline, and also suggested DOE consider whether a blanket 18-month extension is needed for all products and requirements. (Joint Advocacy Comments, No. 125.1 at p. 1) Some of the commenters were in favor of increasing the proposed compliance timeline. In particular, the Joint Manufacturers recommended that the extension be increased to 24 months for walk-in coolers and walk-in freezers, given the inherent cost burden and logistical challenges of the physical testing that must be absorbed by smaller manufacturers. (Joint Manufacturers, No. 115.1 at p. 1) AHRI suggested a further extension of time may be necessary depending on the extent to which DOE modifies its AEDM/Alternate Rating Method
(ARM)provisions and validation requirements. (AHRI, No. 113.1 at p. 2) Along these lines, Zero Zone, Inc. (Zero Zone) commented that, with the current definition of the basic model in the March 2011 final rule and the exclusion of AEDM methods, 18 months is not enough time to comply with the regulations. (Zero Zone, No. 127.1 at p. 1) Moreover, Zero Zone asserted that the compliance regulations in the March 2011 final rule are new for the commercial refrigeration industry and burdensome. *Id.* AAON reported that the AEDM validation test tolerance stated in the March 2011 final rule is less than the current level of repeatability achievable in independent test laboratories making this validation impossible to achieve. Until these issues can be resolved and made clear, AAON stated it could not comment on the time required to comply with new testing burdens or AEDM requirement. (AAON, No. 118.1 at p. 1) While many commenters supported the certification extension for certain commercial equipment, Earth Justice was the sole commenter arguing against the proposed 18-month extension, noting that any delay would undermine the energy savings achieved by the standards-setting process. (Earth Justice, No. 120.1 at p. 1) Instead, Earth Justice suggested DOE consider an alternative approach that would maintain some certification requirements for these products but make those requirements less onerous for the first 18 months that the rule is effective. *Id.* The Department appreciates Earth Justice's concern but declines to adopt interim certification requirements in this final rule. Although today's rule delays the reporting requirements for some products distributed in commerce, such products must still meet all prescribed energy conservation standards under DOE's regulations. As DOE has previously made clear, the existing energy conservation standards, test procedures, and sampling provisions are not affected by this rule. While the Department believes the certification reporting requirements are a good monitoring tool, their impact on energy savings should not be wholly undermined by a delay because the energy conservation standards themselves will still be enforced. Based on the volume of questions DOE has received since the issuance of the March 2011 final rule, the Department believes that a phased-in certification requirement is likely to result in industry confusion that would more than offset any benefit. The Department believes that industry should focus its efforts on developing a basis for future regulatory compliance. In light of most of the comments above, DOE is extending the compliance date for the certification provisions for commercial refrigeration equipment; commercial warm air furnaces, commercial packaged boilers, and commercial air conditioners and heat pumps (collectively referred to as commercial HVAC equipment); commercial water heaters, commercial hot water supply boilers, and unfired hot water storage tanks (collectively referred to as commercial WH equipment); and automatic commercial ice makers to 18 months from the publication of this final rule. Thus, the certification compliance date for these products will now be December 31, 2012. DOE believes 18 months is a reasonable extension to provide manufacturers with the time necessary to develop the data and supporting documentation needed to populate the certification reports and certify compliance with DOE's regulations, including the existing testing and sampling procedures. Manufacturer responses, however, indicate that numerous manufacturers for certain types of commercial equipment have been making representations of efficiency and determining compliance with the applicable energy conservation standards without testing products in accordance with all of the provisions of the DOE test procedures, which include sampling plans and certification testing tolerances. As such, it is apparent from the comments and concerns expressed to the Department that a subset of manufacturers of commercial equipment now require additional time to comply with testing and sampling requirements. In addition, manufacturer comments have demonstrated to DOE that the existing AEDM provisions need to be carefully reviewed and modified, as necessary, in order to permit manufacturers to determine compliance without undue test burden. DOE is committed to reviewing the AEDM provisions quickly and to enable manufacturers to determine compliance through approved methodologies. To that end, any comments regarding the AEDM provisions, such as Carrier's request to amend the confidence levels for calculating energy efficiency, will be addressed in the current ARM/AEDM rulemaking. DOE emphasizes that the testing and sampling requirements for commercial refrigeration equipment; commercial HVAC equipment; commercial WH equipment; and automatic commercial ice makers were not adopted or revised in the March 2011 final rule and are unchanged by this extension. These regulations can be found on a per product basis in Subpart B to Part 429 (sampling plans for testing) and 431.64, 431.76, 431.86, 431.96, 431.106, and 431.134 (uniform test methods). Those provisions were previously finalized in various product-specific rulemakings after being subject to notice and comment. While AAON stated its support for the proposed 18-month extension, it requested clarification from DOE on how the March 2011 final rule indicates that “manufacturers could use their discretion in grouping individual models as a certified basic model such that the certified rating for the basic model matched the represented rating for all included models” as stated in the April 2011 NOPR. (AAON, No. 118.1 at p. 1) DOE provided clarification of its basic model definition in the March 2011 final rule. See 76 FR 12428-12429 for more information. B. Extension of Certification Deadline for Walk-In Coolers and Freezers In the April 2011 NOPR, DOE initially proposed an 18-month extension for manufacturers of walk-in coolers and freezers to certify compliance. As noted above, AHRI, ICS, Crown Tonka, the Joint Manufacturers, and Hill Phoenix all supported the certification extension for these products. Additionally, the Joint Manufacturers commented in support of an interim reporting requirement, suggesting mandatory registration with the Department's CCMS system for all walk-in coolers and walk-in freezers (WICFs) manufacturers based on published ratings and operating characteristics of components and materials used in construction of these products. (Joint Manufacturers, No. 115.1 at p. 1) The Joint Manufacturers clarified that this mandatory filing should be delayed until January 1, 2012, to allow all parties time to become acclimated to the system and to prevent an influx of errors and subsequent delays in completion of the filing. *Id.* Although the Department tentatively proposed an extension to the certification compliance date for WICFs in the April 2011 NOPR, upon further consideration, DOE has determined that an 18-month extension for these products is not warranted. The current Federal energy conservation standards for walk-in coolers and freezers are design requirements prescribed under section 312(b) of the Energy Independence and Security Act of 2007 (EISA 2007), subsequently codified in 10 CFR 431.306. Manufacturers of WICFs are not currently required to comply with a performance-based standard, which could require extensive testing to determine the efficiency of each WICF and/or WICF component. Instead, EISA 2007 prescribed a number of design requirements, only one of which requires the use of a testing procedure. Because determining compliance with the design standard does not require extensive, time-consuming testing, DOE believes an 18-month delay to certify compliance with the EISA 2007 design standards is unwarranted. WICFs that did not meet the EISA 2007 design requirements could not be distributed in commerce in the United States since January 1, 2009. As DOE clarified in the March 2011 final rule, EISA 2007 provided the framework for a component-based approach since each design standard is based on the performance of a given component of the WICF. Accordingly, DOE believes manufacturers of WICF components should be able to attest and demonstrate their products meet the design requirements without any additional time. Based on manufacturers' request for additional time, however, DOE will delay the certification compliance date to October 1, 2011, in order to provide manufacturers with sufficient time and notice to certify compliance to the Department. The new certification deadline is after the annual submission deadline for WICFs eliminating the need for manufacturers to submit two complete certification reports this year and provides for a little extra time for component manufacturers to certify compliance to the design standards. C. Extension of Certification Deadline for Other Types of Commercial or Industrial Equipment> Several commenters requested that the Department extend the compliance date for filing certification reports to other types of commercial or industrial equipment, such as beverage vending machines, distribution transformers and metal halide lamp ballasts and fixtures. A discussion of the comments and DOE response is presented below by product. For instance, Royal Vendors, Inc., NAMA and Automated Merchandising Systems Inc.
(AMS)all asserted that DOE should provide an 18-month extension for beverage vending machines for compliance with the certification provisions. Specifically, NAMA noted that manufacturers of beverage vending machines will be impacted by increased costs relating to compliance and testing; and operators will be impacted by increased prices for beverage vending machines, due to passed-along costs from manufacturers. (NAMA, No. 116.1 at p. 1) NAMA further stated that if the “July 5, 2011 compliance date is allowed to stand, operators could also be impacted by a reduced number of compliant and certified vending machine models available for sale if manufacturers cannot bring their designs into compliance and obtain certification in this very short time.” *Id.* Additionally, Royal Vendors, Inc. reported that, because it offers such a proliferation of product models, the quantity of testing required to verify compliance to the DOE 2012 requirement is quite extensive and costly to achieve in the timeline required. (Royal Vendors, Inc., No. 123.1 at p. 1) AMS similarly commented that the lead times for testing and the costs involved necessitate additional time to obtain the necessary certifications. (AMS, No. 128.1 at pp. 1-2) The Department is clarifying that covered bottled or canned beverage vending machines are not required to be certified until the compliance date for the applicable energy conservation standards, which is August 31, 2012. 10 CFR 431.296. Irrespective of certification provisions, all manufacturers must bring their designs into compliance by that compliance date to continue distributing them in commerce. While many of the commenters suggested that the certification burden is large due to the compliance and testing costs, DOE considered these costs in the test procedure and energy conservation standards rulemakings for this product. See 71 FR 71340 (December 8, 2006) and 74 FR 74 44914 (August 31, 2009), respectively. Manufacturers of bottled and canned beverage vending machines should have the required information readily available by August 31, 2012. Additionally, DOE notes that it uses a self-certification process, where a manufacturer is attesting to the compliance of its products upon submission of the templates in CCMS; manufacturers are not required to obtain a third-party testing facility's certification. With regard to distribution transformers, the National Electrical Manufacturers Association
(NEMA)Transformers Products Section requested that DOE delay the compliance date for certification until 120 days from May 13, 2011, the day the Compliance Certification Management System
(CCMS)templates for distribution transformers were published. (NEMA, No. 117.1 at p. 2) NEMA commented that such a 120 day delay is justified, reasonable and absolutely necessary, as any reporting represents a significant effort, both in time and labor; initial reporting even more so. *Id.* at pp 1-2. Similarly, NEMA requested DOE delay the enforcement of compliance reporting for metal halide lamp ballasts and fixtures until a date no earlier than September 1, 2012, because of the breadth of basic models covered and ballast testing requirements. (NEMA, No. 122.1 at pp. 1-2) NEMA noted this date coincides with the annual reporting date, minimizing the burden of multiple reports within the same year. *Id.* at p. 2. DOE acknowledges that both distribution transformers and metal halide lamp ballasts and fixtures are unique markets. DOE understands, as noted by NEMA, that the distribution transformer market contains a great deal of customization, where many models are built-to-order. This can result in a large number of models requiring certification to DOE before distribution in commerce. DOE also understands it is common in the distribution transformer market to maintain many legacy models that were custom built for a given client instead of discontinuing them. DOE believes that manufacturers of distribution transformers will need sufficient time to review their records for legacy models to make sure that all models currently distributed in commerce are properly certified with the Department. As such, a large number of basic models may need to be certified in the initial certification report. Metal halide lamp ballasts and fixtures are also a unique market since the manufacturer of the metal halide lamp fixture is responsible for compliance and certification to the Department, but the standards are based on the ballast (i.e., one component of the fixture). While the testing procedures and standards for these products are already effective and any representations of the efficiency must be made using the existing test procedure, DOE believes manufacturers of metal halide fixtures may require additional time to submit the certification reports. Many of these manufacturers will need to gather data on the ballasts from their component suppliers before the certification reports can be completed. Rather than adopting a compliance date mid-month, DOE is delaying the compliance date for certification of distribution transformers and metal halide lamp ballasts and fixtures until October 1, 2011. This date provides slightly more time to allow for sufficient notice, data gathering, and certifying compliance, and addresses the concerns voiced by the manufacturers that they would be required to submit an annual certification report just a few months after the initial certification was due.> D. Reporting Requirement During Interim Period In the April 2011 NOPR, the Department sought comment on whether a limited reporting requirement should be established for manufacturers receiving a compliance date extension for the certification reporting provisions. In response, numerous commenters stated their opposition to any such type of interim reporting requirement. AHRI asserted that DOE should not require registration with CCMS and the reporting of efficiency ratings before reasonable testing requirements and AEDM/ARM authorization and validation requirements have been clearly established, and manufacturers have been provided adequate time for compliance. (AHRI, No. 113.1 at p. 2) Hill Phoenix, NAMA, Lennox and Heatcraft were also opposed to reporting in the interim period. (Hill Phoenix, No. 121.1 at p. 1; NAMA, No. 116.1 at p. 3; Lennox, No. 119.1 at p. 2; Heatcraft, No. 124.1 at p. 2) AHRI further stated that manufacturers should not have to worry about being prosecuted for inaccurate ratings or reporting errors while DOE has yet to determine what product rating methods and procedures will be deemed acceptable. (AHRI, No. 113.1 at p. 2) Lennox and Heatcraft noted that the new certification requirements already impose an additional significant reporting burden on manufacturers, and DOE should not impose still another reporting obligation on an interim basis. (Lennox, No. 119.1 at p. 2; Heatcraft, No. 124.1 at p. 2) Instead, manufacturers should be able to simply maintain in their files, accessible on request by DOE, records demonstrating that covered equipment is in compliance with applicable conservation standards. *Id.* NAMA argued that adding limited reporting requirements will complicate testing, cost valuable staff time and could slow accurate conclusion of testing procedures. (NAMA, No. 116.1 at p. 3) In response to these commenters, DOE desires to clarify that all products distributed in commerce must comply with the applicable energy conservation standards. Today's rule delays the reporting requirements only; existing energy conservation standards, test procedures and sampling provisions are not affected by this rule. Therefore, during the interim period before compliance is required for compliance certification, manufacturers must maintain records to demonstrate that covered equipment meet the applicable conservation standards—even if the manufacturers' determination of compliance was not made in accordance with DOE testing and sampling requirements. E. Timing of Annual Filing Deadline The March 2011 final rule added an annual certification requirement for all covered products and covered equipment currently subject to standards. The annual reporting requirement covers:
(1)All discontinued basic models previously certified that have not previously been reported as discontinued (marked as discontinued);
(2)all previously certified basic models that are still in distribution in commerce that are unchanged (marked as carryover);
(3)all previously certified basic models that are still in distribution in commerce but for which the manufacturer needs to report new or changed information (marked as modified/revised) (e.g., new brand info, new or different model numbers, modified rating); and
(4)any new models a manufacturer anticipates offering for distribution in commerce (marked as new). Lennox and Heatcraft requested DOE clarify the timing of the annual filing deadline of certification-related information (pursuant to 10 CFR 429.12(d)) and the 18-month extension. (Lennox, No. 119.1 at p. 2; Heatcraft, No. 124.1 at p. 2) These commenters suggested that the first certification reports for covered equipment should not be due until the DOE-specified month following the expiry of the 18-month extension (and any requirement for submitting a certification report before distributing relevant covered equipment in commerce should also be deferred until that date). *Id.* Lennox and Heatcraft believe this approach would preserve DOE's rolling submittal approach for annual reports and also clarify that a manufacturer is not required to submit a certification report twice in the first year that these reports are due. *Id.* With regard to timing, Carrier urged DOE to establish, once the AEDM procedures are amended, a subsequent effective date to actually conduct any required tests under the amended procedures. (Carrier, No. 114.1 at p. 2) As discussed above, DOE is delaying the compliance date for the submittal of certification reports for certain commercial equipment. The annual certification requirement does not apply until the initial certification requirements are required. As an example, the earliest annual reporting deadline for commercial WH equipment will be May 1, 2013. F. Compliance and Enforcement DOE emphasizes that all covered equipment must meet the applicable energy conservation standard. Furthermore, all testing procedures and sampling provisions are unaffected by this final rule. DOE is adopting a delayed compliance date only for the reporting requirements in the March 2011 final rule and only for the equipment types discussed above. DOE has also received questions regarding the compliance date for covered products and covered equipment, where compliance with the standards are not yet required, like general service incandescent lamps (GSILs). Covered products and covered equipment are not required to be certified until the compliance date of an applicable standard, so equipment such as GSILs and beverage vending machines are not required to be certified until the compliance date of the applicable energy conservation standard. Further, DOE is adopting clarifying language in today's final rule, which makes it clear that certification is required by the compliance date of the initial set of applicable energy conservation standards. DOE encourages manufacturers to become familiar with the CCMS prior to the certification deadline. The CCMS requires users to apply to use the system by filling out a registration form, signing a compliance statement, and receiving a personal password. The CCMS has templates for all covered products and covered equipment available for manufacturers to use when submitting certification data to DOE. The Department encourages manufacturers, to the extent possible, to fill out these templates in advance of the compliance date in case questions arise. G. Technical Amendments DOE is modifying the regulatory text for cast-iron sectional boilers and hot water boilers (429.18), vented hearth heaters (429.22), general service incandescent lamps (429.27), and refrigerated bottled or canned beverage vending machines (429.52) to remove the reference to the conservation standards compliance date. Because DOE has added new regulatory text in section 429.12 explicitly stating for all product categories that certification is not required until compliance with a standard is required, the product-specific regulatory text is now redundant. DOE is also deleting the regulatory text in section 429.35 requiring reporting and record retention relating to production dates for compact fluorescent lamps. That requirement was inadvertently added in the March 2011 final rule. Because there is no sampling requirement related to dates for compact fluorescent lamps, there is no purpose to this information. III. Procedural Issues and Regulatory Review A. Review Under Executive Order 12866 Today's regulatory action is not a “significant regulatory action” under section 3(f) of Executive Order 12866. Accordingly, this action was not subject to review under the Executive Order by the Office of Information and Regulatory Affairs
(OIRA)in the Office of Management and Budget (OMB). B. Administrative Procedure Act DOE has determined, pursuant to authority at 5 U.S.C. 553(b)(B), that there is good cause to waive the requirement to provide prior notice and an opportunity for comment concerning two technical amendments described in section G above as such procedures would be unnecessary. Both technical amendments merely conform the existing text to previously existing or newly added regulatory text without adding any new substantive requirements. These amendments are of a type in which the public would not be particularly interested or for which an opportunity for comment would serve any purpose. DOE has determined, pursuant to authority at 5 U.S.C. 553(d)(1), that this final rule is not subject to a 30-day effective date because this rule extending the compliance date for requirement relieves a restriction. C. Review Under the Regulatory Flexibility Act The Regulatory Flexibility Act (5 U.S.C. 601 *et seq.* ) requires preparation of an initial regulatory flexibility analysis
(IFRA)for any rule that by law must be proposed for public comment, unless the agency certifies that the rule, if promulgated, will not have a significant economic impact on a substantial number of small entities. As required by Executive Order 13272, “Proper Consideration of Small Entities in Agency Rulemaking,” 67 FR 53461 (August 16, 2002), DOE published procedures and policies on February 19, 2003, to ensure that the potential impacts of its rules on small entities are properly considered during the DOE rulemaking process. 68 FR 7990. DOE has made its procedures and policies available on the Office of the General Counsel's Web site: *http://www.gc.doe.gov.* DOE reviewed this rule under the provisions of the Regulatory Flexibility Act and the procedures and policies published on February 19, 2003. This rule merely extends the compliance date of a rulemaking already promulgated. To the extent such action has any economic impact it would be positive in that it would allow regulated parties additional time to come into compliance. DOE did undertake a full regulatory flexibility analysis of the original Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment rulemaking. That analysis considered the impacts of that rulemaking on small entities. As a result, DOE certifies that this rule will not have a significant economic impact on a substantial number of small entities. D. Review Under the National Environmental Policy Act DOE has determined that this rule falls into a class of actions that are categorically excluded from review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 *et seq.* ) and DOE's implementing regulations at 10 CFR part 1021. Specifically, this rule amends an existing rule without changing its environmental effect and, therefore, is covered by the Categorical Exclusion in 10 CFR part 1021, subpart D, paragraph A5. Accordingly, neither an environmental assessment nor an environmental impact statement is required. IV. Approval of the Office of the Secretary The Secretary of Energy has approved publication of today's final rule. List of Subjects in 10 CFR Part 429 Confidential business information, Energy conservation, Household appliances, Imports, Reporting and recordkeeping requirements. Issued in Washington, DC, on June 21, 2011. Kathleen Hogan, Deputy Assistant Secretary for Energy Efficiency, Office of Technology Development, Energy Efficiency and Renewable Energy. For the reasons set forth in the preamble, DOE amends part 429 of chapter II of Title 10 of the Code of Federal Regulations to read as follows: PART 429—CERTIFICATION, COMPLIANCE, AND ENFORCEMENT FOR CONSUMER PRODUCTS AND COMMERCIAL AND INDUSTRIAL EQUIPMENT 1. The authority citation for Part 429 continues to read as follows: Authority: 42 U.S.C. 6291-6317. 2. Revise § 429.12 by adding a new paragraph
(i)to read as follows: § 429.12 General requirements applicable to certification reports.
(i)*Compliance dates.* For any product subject to an applicable energy conservation standard for which the compliance date has not yet occurred, a certification report must be submitted not later than the compliance date for the applicable energy conservation standard. The following covered products are subject to delayed compliance dates for certification:
(1)Commercial refrigeration equipment, December 31, 2012;
(2)Commercial heating, ventilating, and air-conditioning equipment, December 31, 2012;
(3)Commercial water heating equipment, December 31, 2012;
(4)Walk-in coolers and freezers, October 1, 2011;
(5)Distribution transformers, October 1, 2011; and
(6)Metal halide lamp ballasts and fixtures, October 1, 2011. § 429.18 [Amended] 3. Amend § 429.18(b)(2)(ii) and (b)(3) by removing the words, “no later than September 1, 2012”. § 429.22 [Amended] 4. Amend § 429.22(b)(2) by removing the last sentence. § 429.27 [Amended] 5. Amend § 429.27(b)(2)(iii) by removing the phrase, “On or after the effective dates specified in § 430.32,”. § 429.35 [Amended] 6. Section 429.35 is amended: a. In paragraph (b)(1) by removing “bare of” and adding in its place “bare or”; b. In paragraph (b)(2) by removing the text, “production dates for the units tested,”; and c. By removing paragraph (c). 7. Revise § 429.42(b)(2)(iii) to read as follows: § 429.42 Commercial refrigerators, freezers, and refrigerator-freezers.
(b)* * *
(2)* * *
(iii)Remote condensing commercial refrigerators, freezers, and refrigerator-freezers, self-contained commercial refrigerators, freezers, and refrigerator-freezers without doors, commercial ice-cream freezers, and commercial refrigeration equipment with two or more compartments (i.e., hybrid refrigerators, hybrid freezers, hybrid refrigerator-freezers, and non-hybrid refrigerator-freezers): The maximum daily energy consumption in kilowatt hours per day (kWh/day), the total display area
(TDA)in feet squared (ft 2 ) or the chilled volume in cubic feet (ft 3 ) as necessary to demonstrate compliance with the standards set forth in § 431.66, the rating temperature in degrees Fahrenheit (°F), the operating temperature range in degrees Fahrenheit ( *e.g.,* ≥32 °F, <32 °F, and ≤−5 °F), the equipment family designation as described in § 431.66, and the condensing unit configuration. 8. Revise § 429.52(b)(2) to read as follows: § 429.52 Refrigerated bottled or canned beverage vending machines.
(b)* * *
(2)Pursuant to § 429.12(b)(13), a certification report shall include the following public product-specific information: The maximum average daily energy consumption in kilowatt hours per day (kWh/day), the refrigerated volume
(V)in cubic feet (ft 3 ) used to demonstrate compliance with standards set forth in § 431.296, the ambient temperature in degrees Fahrenheit (°F), and the ambient relative humidity in percent (%) during the test. [FR Doc. 2011-16143 Filed 6-29-11; 8:45 am]
Connectionstraces to 8
Traces to 8 documents
CFR
8 references not yet in our index
- 10 CFR 429
- 42 USC 6291-6309
- Pub. L. 95-619
- 42 USC 6311-6317
- 42 USC 6299-6305
- 10 CFR 431
- 10 CFR 1021
- 42 USC 6291-6317
Citation graph
cites case law
Unknown
Final rule
Cite10 CFR 429
Cite42 USC 6291-6309
Pub. L.Pub. L. 95-619
Cite42 USC 6311-6317
Cites 16 · showing 12Cited by 0 across 0 sources