BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2266-102] Nevada Irrigation District; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* New Major License. b. *Project No.:* 2266-102. c. *Date Filed:* April 15, 2011. d. *Applicant:* Nevada Irrigation District. e. *Name of Project:* Yuba-Bear Project. f. *Location:* The Yuba-Bear Project is located on the west slope of the Sierra Nevada on the Middle Yuba River, Canyon Creek, Fall Creek, Rucker Creek, and Bear River, in Nevada, Placer and Sierra Counties, California.
A large portion of the project is located on the Tahoe National Forest. Some of the project is located on federally-owned land managed by the Bureau of Land Management as part of the Sierra Resource Management Area. g. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791(a)-825(r). h. *Applicant Contact:* Ron Nelson, General Manager, Nevada Irrigation District, 1036 West Main Street, Grass Valley, CA 95945,
(530)271-6824 or e-mail *nelson@nid.dst.ca.us* . i. *FERC Contact:* Alan Mitchnick,
(202)502-6074 or *alan.mitchnick@ferc.gov* . j. This application is not ready for environmental analysis at this time. k. *Project Description:* The project consists of four developments—Bowman, Dutch Flat, Chicago Park, and Rollins—which, in total, include: 13 main dams with a combined gross storage capacity of 207,865 acre-feet of water; four water conduits; five diversion dams; four powerhouses with a combined installed capacity of 79.32 megawatts; one 9.0-mile-long, 60-kilovolt transmission line; and appurtenant facilities and structures, including recreation facilities. l. *Locations of the Application:* A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at 1-866-208-3676, or for TTY,
(202)502-8659. A copy is also available for inspection and reproduction at the address in item
(h)above. m. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. *Procedural Schedule:* The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis June 2011. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions August 2011. Commission issues Draft EIS February 2012. Comments on Draft EIS March 2012. Modified Terms and Conditions May 2012. Commission Issues Final EIS September 2012. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: April 26, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011-10536 Filed 4-29-11; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.