BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14060-000] Owyhee Hydro, LLC; of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 18, 2011, Owyhee Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Owyhee Pumped Storage Project (project) to be located on Lake Owyhee, near Adrian, Malheur County, Oregon.
The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed project has three alternatives and would consist of the following: Owyhee Ridge Alternative A Utilizing the existing Lake Owyhee as the lower reservoir and constructing:
(1)A 50-foot-high, 9,900-foot-long earthen or rockfill upper reservoir embankment;
(2)a artificial, lined upper reservoir with a storage capacity of 8,235-acre-foot;
(3)a 600-foot-long, 15.5-foot diameter concrete-lined low-pressure tunnel;
(4)a 5,870-foot-long, 15.5-foot-diameter concrete-lined pressure shaft;
(5)a 1,815-foot-long, 18.6-foot-diameter concrete-lined tailrace;
(6)a 100-foot-long, 350-foot-wide, 120-foot-high underground powerhouse;
(7)a 4.85-mile-long, 230 or 345-kilovolt
(kV)transmission line interconnecting with either the existing Midpoint-Summer Lake line or the planned Boardman-Hemingway line; and
(8)appurtenant facilities. Owyhee Ridge Alternative B Utilizing the existing Lake Owyhee as the lower reservoir and constructing:
(1)A 50-foot-high, 9,900-foot-long earthen or rockfill upper reservoir embankment;
(2)a artificial, lined upper reservoir with a storage capacity of 8,235-acre-foot;
(3)a 1,190-foot-long, 15.5-foot-diameter concrete-lined low-pressure tunnel;
(4)an 8,100-foot-long, 15.5-foot-diameter concrete-lined pressure shaft;
(5)a 2,000-foot-long, 18.6-foot-diameter concrete-lined tailrace;
(6)a 100-foot-long, 350-foot-wide, 120-foot-high underground powerhouse;
(7)a 2.7-mile-long, 230 or 354-kV transmission line interconnecting with either the existing Midpoint-Summer Lake line or the planned Boardman-Hemingway line; and
(8)appurtenant facilities. Long Draw Alternative Utilizing the existing Lake Owyhee as the lower reservoir and constructing:
(1)A artificial, lined upper reservoir with a storage capacity of 8,235-acre-foot;
(2)a 210-foot-high, 2,165-foot-long zoned earth and rockfill dam with impervious core or concrete-face earth and rockfill dam;
(3)a 2,100-foot-long, 16.4-foot-diameter concrete-lined low-pressure tunnel;
(4)a 8,070-foot-long, 16.4-foot-diameter concrete-lined pressure tunnel;
(5)a 2,110-foot-long, 19.7-foot-diameter concrete-lined tailrace;
(6)an 80-foot-high, 280-foot-wide, 120-foot-high underground powerhouse;
(7)a 2.5-mile-long, 230-kV transmission line interconnecting with either the existing Midpoint-Summer Lake line or the planned Boardman-Hemingway line; and
(8)appurtenant facilities. All of the alternatives would include four reversible pump-turbines with a total installed capacity of 500 megawatts. The estimated annual generation of the project would be 1,533 gigawatt-hours. *Applicant Contact:* Mr. Matthew Shapiro, Owyhee Hydro, LLC, 1210 W. Franklin Street, Suite 2, Boise, Idaho 83702; phone:
(208)246-9925. *FERC Contact:* Kelly Wolcott; phone:
(202)502-6480. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site *http://www.ferc.gov/docs-filing/efiling.asp.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov.* or toll free at 1-866-208-3676, or for TTY,
(202)502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-14060-000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: April 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011-9072 Filed 4-13-11; 8:45 am]
Connectionstraces to 2
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.