Code · REGISTER · 2011-03-17 · Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT · Proposed Rules

Proposed Rules. Notice of proposed rulemaking; extension of comment period

947 words·~4 min read·/register/2011/03/17/2011-6175·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT
Action: Notice of proposed rulemaking; extension of comment period
Citation: FR Doc. 2011-6175 · RIN 2137-AE53 · Docket Number PHMSA-2009-0303 (HM-213D) · 49 CFR 173

Summary

PHMSA is notifying the public of our intent to extend the comment period by 30 days for a notice of proposed rulemaking published on January 27, 2011.

Dates

The comment period for the NPRM closing on March 28, 2011, is extended until April 27, 2011.

Supplementary Information

I. Background On January 27, 2011, PHMSA published a notice of proposed rulemaking (NPRM) (HM-213D; 76 FR 4847) seeking public comment on a proposal to prohibit the transportation of flammable liquids in exposed external product piping (wetlines) on a cargo tank motor vehicle (CTMV) unless the CTMV is equipped with bottom damage protection that conforms to the requirements of § 178.337-10 or § 178.345-8(b)(1), as appropriate. We also invited comment on a number of provisions associated with this proposed prohibition such as the residue performance standard relating to applicability of the proposed prohibition as well as conditional exceptions and the proposed transition period and compliance dates. See the January 27, 2011 NPRM for background and a complete discussion of the proposals. II. Comment Period Extension We received comments from the American Trucking Associations, Inc. (ATA), the Commercial Vehicle Safety Alliance, the National Tank Truck Carriers, Inc., and the Tank Truck Manufacturers Association requesting an extension of the comment period. These member organizations represent carriers, manufacturers, and officials affected by the NPRM. They state their primary basis for extension is to allow for thorough review and analysis of the HM-213D docket materials. For example, the ATA notes in their comment that the regulatory evaluation for this NPRM contains numerous new assumptions and revised economic analyses that warrant extensive evaluation by industry experts and outside consultants. They indicate that the evaluation will require a review of (1) The wetlines incidents cited by PHMSA; (2) the use and retrofit requirements associated with a manual purging system; and (3) the feasibility of alternatives available to comply with the proposed prohibition. The associations also indicate the need for time to convene with members at meetings scheduled to occur in April and May of 2011 to present findings and to obtain feedback. Additionally, the comment period for this NPRM overlaps with numerous other regulatory initiatives within DOT and other Federal agencies, such as the Environmental Protection Agency, the Occupational Safety and Health Administration, and the U.S. Customs and Border Protection that impact their members. Finally, they note that the trucking industry is dominated by small businesses that do not have the resources to understand and meaningfully participate in the rulemaking process of so many concurrent rulemaking actions. In light of the significance of this rulemaking to their members and for the reasons summarized above, the associations request that PHMSA grant an extension to the HM-213D NPRM comment period ranging from sixty days to six months. Although PHMSA continues to believe that the initial 60-day comment period provides enough time to review and respond to the rulemaking proposals and supporting material, PHMSA is consenting to the commenter requests to extend the comment period to ensure sufficient time for public review. However, we do not consider a lengthy extension (e.g., 120 days) to be warranted. Accordingly, in the interest of moving this rulemaking action forward in a timely manner, we believe, in addition to the time that remains in the current comment period, extending the comment period by 30 days would be sufficient to relieve the burdens of conducting an extensive evaluation, overlapping rulemaking actions, and needing time to meet with respective trucking industry members for feedback. Thus, the comment period for the HM-213D NPRM is extended from March 28, 2011 until April 27, 2011. Issued in Washington, DC, on March 11, 2011 under authority delegated in 49 CFR part 106. Magdy El-Sibaie, Associate Administrator for Hazardous Materials Safety. [FR Doc. 2011-6175 Filed 3-16-11; 8:45 am]

Connections2 off-index
2 references not yet in our index
  • 49 CFR 173
  • 49 CFR 106
Citation graph
cites case law
Proposed Rules
Notice of proposed rulemaking; extension of comment period
Cite49 CFR 173
Cite49 CFR 106
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.