Rules and Regulations. Notice of temporary deviation from regulations
/register/2011/03/04/2011-4853·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2011-4853 · Docket No. USCG-2011-0081 · 33 CFR 117
Summary
The Commander, Eleventh Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the Annual Cesar Chavez March. This deviation allows the bridge to remain in the closed-to-navigation position during the event.
Dates
This deviation is effective from 10 a.m. to 11:30 a.m. on March 26, 2011.
Supplementary Information
The California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. The draw opens on signal from May 1 through October 31 from 6 a.m. to 10 p.m. and from November 1 through April 30 from 9 a.m. to 5 p.m. At all other times the draw shall open on signal if at least four hours notice is given, as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position from 10 a.m. to 11:30 a.m. on March 26, 2011 to allow the community to participate in the Annual Cesar Chavez March. This temporary deviation has been coordinated with waterway users. There are no scheduled river boat cruises or anticipated levee maintenance during this deviation period. No objections to the proposed temporary deviation were raised. Vessels that can transit the bridge, while in the closed-to-navigation position, may continue to do so at any time. In the event of an emergency the drawspan can be opened with 15 minutes advance notice. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 17, 2011. D.H. Sulouff, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2011-4853 Filed 3-3-11; 8:45 am]
Connectionstraces to 2
- 33 CFR 117