Rules and Regulations. Notice of temporary deviation from regulations
/register/2011/01/27/2011-1818·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2011-1818 · Docket No. USCG-2010-1132 · 33 CFR 117
Summary
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Upper Hack Bridge across the Hackensack River, mile 6.9, at Secaucus, New Jersey. The deviation is necessary for electrical rehabilitation. This deviation allows the bridge to remain in the closed position.
Dates
This deviation is effective from 4 a.m. on January 27, 2011 through 10 p.m. on January 28, 2011.
Supplementary Information
The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a vertical clearance in the closed position of 8 feet at mean high water and 13 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.723(d). The waterway has seasonal recreational vessels, and commercial vessels of various sizes. The owner of the bridge, New Jersey Transit, requested a temporary deviation to facilitate necessary electrical system upgrades at the bridge. Under this temporary deviation the Upper Hack Bridge, mile 6.9, across the Hackensack River may remain in the closed position from 4 a.m. on January 27, 2011 through 10 p.m. on January 28, 2011. Vessels that can pass under the bridge without a bridge opening may do so at all times. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: January 11, 2011. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2011-1818 Filed 1-26-11; 8:45 am]
Connectionstraces to 2
- 33 CFR 117