Rules and Regulations. Notice of Enforcement of Regulation
/register/2011/01/18/2011-851·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of Enforcement of Regulation
Citation: FR Doc. 2011-851 · Docket No. USCG-2010-1138 · 33 CFR 165
Summary
The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Chicago Sanitary and Ship Canal from Mile Marker 296.1 to Mile Marker 296.7 daily from 7 a.m. through 11 a.m. and from 1 p.m. to 5 p.m. on January 18-22, 2011; January 24-26, 2011; January 31, 2011; February 1-5, 2011; February 7-12, 2011; and on February 14-19, 2011. This enforcement action will also occur from 7 a.m. on January 27, 2011 through 7 a.m. on January 29, 2011. This action is necessary to protect the waterways, waterway users, and vessels from hazards associated with the U.S. Army Corps of Engineers' operational and safety testing of the dispersal barrier IIB, which helps control the spread of aquatic nuisance species that have the potential of devastating the waters of the Great Lakes. During the enforcement period, entry into, transiting, mooring, laying-up or anchoring within the enforced area of this safety zone by any person or vessel is prohibited unless authorized by the Captain of the Port, Sector Lake Michigan, or his or her designated representative.
Dates
The regulations in 33 CFR 165.T09.0166 will be enforced from 7 a.m. on January 18, 2011 through 5 p.m. on February 19, 2011.
Supplementary Information
The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel, Chicago, IL, listed in 33 CFR § 165.T09-0166, on all waters of the Chicago Sanitary and Ship Canal from Mile Marker 296.1 to Mile Marker 296.7 daily from 7 a.m. to 11 a.m. and from 1 p.m. to 5 p.m. on January 18-22, 2011; January 24-26, 2011; January 31, 2011; February 1-5, 2011; February 7-12, 2011; and on February 14-19, 2011. This enforcement action will also occur from 7 a.m. on January 27, 2011 until 7 a.m. on January 29, 2011. This enforcement action is necessary because the Captain of the Port, Sector Lake Michigan has determined that the U.S. Army Corps of Engineers' dispersal barrier IIB operational testing poses risks to life and property. The combination of vessel traffic and electric current in the water makes the controlling of vessels through the impacted portion of the Chicago Sanitary and Ship Canal necessary to prevent injury and property loss. In accordance with the general regulations in § 165.23 of this part, entry into, transiting, mooring, laying up or anchoring within the enforced area of this safety zone by any person or vessel is prohibited unless authorized by the Captain of the Port, Sector Lake Michigan, or his or her designated representative. This notice is issued under authority of 33 CFR 165.T09-0166 and 5 U.S.C. 552(a). In addition to this notice in the Federal Register , the Captain of the Port, Sector Lake Michigan, will also provide notice through other means, which may include, but are not limited to, Broadcast Notice to Mariners, Local Notice to Mariners, local news media, distribution in leaflet form, and on-scene oral notice. Additionally, the Captain of the Port, Sector Lake Michigan, may notify representatives from the maritime industry through telephonic and e-mail notifications. Dated: December 29, 2010. S.R. Schenk, Commander, U.S. Coast Guard, Captain of the Port, Sector Lake Michigan, Acting. [FR Doc. 2011-851 Filed 1-14-11; 8:45 am]
Connectionstraces to 1
- 33 CFR 165