Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2010-12-27 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

551 words·~3 min read·/register/2010/12/27/2010-32380·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2010-32380 · Docket No. USCG-2010-1100 · 33 CFR 117

Summary

The Commander, Fifth Coast Guard District has issued a temporary deviation from the regulations governing the operation of the Sassafras River (Route 213) Bridge, mile 10.0, in Georgetown, MD. The deviation is necessary to facilitate mechanical repairs and gate replacement. This deviation allows the drawbridge to remain in the closed to navigation position.

Dates

This deviation is effective from 5 a.m. on January 10, 2011 until 5 p.m. on January 21, 2011.

Supplementary Information

The Maryland State Highway Administration owns and operates this bascule-type drawbridge and requested a temporary deviation from the current operating regulations set out in 33 CFR 117.570 to facilitate mechanical repairs and barrier gate replacement. The Sassafras River Bridge (Route 213), at mile 10.0, in Georgetown, MD has a vertical clearance in the closed position to vessels of four feet, above mean high water. Under normal operating conditions, the draw would open on signal from November 1 through March 31, except from midnight to 8 a.m. when the draw only need open when at least a six-hour advance notice is given. Under this temporary deviation, the Sassafras River (Route 213) Bridge will be maintained in the closed-to-navigation position beginning at 5 a.m. on January 10, 2011 until 5 p.m. on January 21, 2011. The drawbridge will not be able to open in the event of an emergency. Vessels that can pass under the bridge without a bridge opening may do so at all times. Based on historical bridge log data this may affect up to one vessel per day. Vessels with heights greater than 4 feet have no alternate routes. The project being conducted during the month of January should have the least impact on mariners due to the lack of waterway use. The Coast Guard has and will continue to inform the users of the waterway through our Local and Broadcast Notices to Mariners Closure periods for the bridge will be announced so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 15, 2010. Waverly W. Gregory, Jr., Chief, Bridge Administration Branch, Fifth Coast Guard District. [FR Doc. 2010-32380 Filed 12-23-10; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.