Rules and Regulations. Notice of temporary deviation from regulations
/register/2010/12/15/2010-31407·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2010-31407 · Docket No. USCG-2010-1077 · 33 CFR 117
Summary
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Massachusetts Bay Commuter Railroad Bridge at mile 0.7 across the Annisquam River and Blynman Canal. The deviation is necessary to facilitate emergency structural repair. This deviation allows the bridge to remain in the closed position during the deviation period.
Dates
This deviation is effective for enforcement: With actual notice from December 1, 2010, through December 15, 2010 and with constructive notice from December 15, 2010 through April 17, 2011.
Supplementary Information
The Massachusetts Bay Commuter Railroad (MBCR) bridge, across the Annisquam River and Blynman Canal at mile 0.7, at Gloucester, MA, has a vertical clearance in the closed position of 16 feet at mean high water and 25 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.586. The owner of the bridge MBCR requested a temporary deviation from the regulations to facilitate emergency structural repairs at the bridge. Under this temporary deviation the MBCR Bridge may remain in the closed position from December 1, 2010 through April 17, 2011. The bridge can be opened for emergencies by calling Ms. Patricia Mallon, Assistant Chief of Engineering at 617-222-3617 or 617-590-9828. The bridge seldom receives requests to open December through April and there is an alternate route for vessel traffic since the waterway has outlets to open water at both ends. Vessels that can pass under the bridge in the closed position may do so at any time. The Gloucester Harbor Master and the local marinas were notified and no objections were received. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 1, 2010. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2010-31407 Filed 12-14-10; 8:45 am]
Connectionstraces to 2