Rules and Regulations. Notice of temporary deviation from regulations
/register/2010/10/18/2010-26098·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2010-26098 · Docket No. USCG-2010-0892 · 33 CFR 117
Summary
The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the I-110 (HWY 15) bridge across the Back Bay of Biloxi, mile 3.0, between Biloxi and D'Iberville, Harrison County, Mississippi. This deviation is necessary to allow timely bridge rehabilitation to extend the bridge life, optimize traffic and boat operations, and improve overall traffic, boat and pedestrian safety. This deviation allows the bridge to remain closed with limited exception.
Dates
This deviation is effective from 12:01 a.m. on January 4, 2011, through 11:59 p.m. on May 30, 2011.
Supplementary Information
The I-110 (HWY 15) bridge across the Back Bay of Biloxi, mile 3.0, between Biloxi and D'Iberville, Harrison County, Mississippi, has a vertical clearance of 60 feet above mean high water in the closed position. Presently, the draw opens on signal if at least six hours notice is given as required by 33 CFR 117.675(a). The Mississippi Department of Transportation requests a deviation to allow the bridge to remain closed to marine traffic except for Mondays and Thursdays at 6 a.m. but only with a 72 hour advanced request to open. The request should be made by telephone to 877-486-8044. This deviation will allow the rehabilitation of the bridge to be completed in a timely fashion. This rehab is necessary to extend the bridge life, optimize traffic and boat operations, and improve overall traffic, boat and pedestrian safety. Any vessel that does not require an opening of the drawspan may pass at any time. In accordance with 33 CFR 117.261(a), Public vessels of the United States and tugs with tow must be passed through the drawspan at any time. In accordance with 33 CFR 117.31(b)(2), the drawspan shall be opened for vessels in distress where a delay would endanger life or property. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. This deviation may be terminated/cancelled at anytime via Broadcast Notice to Mariners. Dated: October 5, 2010. David M. Frank, Bridge Administrator. [FR Doc. 2010-26098 Filed 10-15-10; 8:45 am]
Connectionstraces to 4
- 33 CFR 117