Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2010-07-14 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

645 words·~3 min read·/register/2010/07/14/2010-17218·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice July 8, 2010. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b: Agency Holding Meeting: Federal Energy Regulatory Commission. Date and Time: July 15, 2010, 10 a.m. Place: Room 2C, 888 First Street, NE., Washington, DC 20426. Status: Open. Matters To Be Considered: Agenda*. Note: Items listed on the agenda may be deleted without further notice. Contact Person for More Information: Kimberly D. Bose, Secretary, Telephone
(202)502-8400. For a recorded message listing items struck from or added to the meeting, call
(202)502-8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at *http://www.ferc.gov* using the eLibrary link, or may be examined in the Commission's Public Reference Room. 961st—Meeting; Regular Meeting; July 15, 2010; 10 a.m. Item No. Docket No. Company Administrative A-1 AD02-1-000 Agency Administrative Matters. A-2 AD02-7-000 Customer Matters, Reliability, Security and Market Operations A-3 AD10-15-000 Smart Grid Update. Electric E-1 EL10-64-000 California Public Utilities Commission. EL10-66-000 Southern California Edison Company, Pacific Gas and Electric Company and San Diego Gas & Electric Company. E-2 ER10-1269-000 Southwest Power Pool, Inc. E-3 RD10-13-000 North American Electric Reliability Corporation. E-4 RM08-19-003 Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability; Margins, Total Transfer Capability, and Existing Transmission Commitments; Mandatory Reliability Standards for the Bulk Power System. RM05-5-019 Standards for Business Practices and Communication Protocols for Public Utilities. E-5 OA08-52-007 New York Independent System Operator, Inc. New York Transmission Owners. E-6 ER10-1268-000 South Carolina Electric & Gas Company. ER10-516-000 ER10-855-000 E-7 OMITTED E-8 EG06-73-000 BG Dighton Power, LLC. EG98-79-000 MASSPOWER. EG99-220-000 Lake Road Generating Company, LP. E-9 ER10-1185-000 ISO New England Inc. E-10 ER10-765-000 California Independent System Operator Corporation. E-11 ER10-942-000 ISO New England Inc. and New England Power Pool E-12 ER07-521-009 New York Independent System Operator, Inc. E-13 ER08-1281-004 New York Independent System Operator, Inc. E-14 OMITTED E-15 EL10-69-000 Virginia Electric and Power Company v. PJM Interconnection, L.L.C. Gas G-1 RP09-2-002 Portland Natural Gas Transmission System. G-2 RP01-245-031 Transcontinental Gas Pipe Line Corporation. G-3 RP10-149-000 Great Lakes Gas Transmission Limited Partnership. Hydro H-1 P-1888-028 York Haven Power Company, LLC. H-2 UL09-1-002 L.S. Starrett Company. H-3 P-460-033 City of Tacoma, Washington. P-460-040 P-460-021 H-4 EL10-53-000 FPL Energy Maine Hydro LLC v. Great Lakes Hydro America, LLC and Rumford Falls Hydro LLC. H-5 P-2355-014 Exelon Generation Company, LLC. Certificates C-1 OMITTED C-2 CP10-73-000 TGGT Holdings, LLC. C-3 CP09-455-000 Florida Gas Transmission Company, LLC. CP09-456-000 Transcontinental Gas Pipe Line Company, LLC. Florida Gas Transmission Company, LLC. Kimberly D. Bose, Secretary. A free Web cast of this event is available through *http://www.ferc.gov* . Anyone with Internet access who desires to view this event can do so by navigating to *http://www.ferc.gov's* Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit *http://www.CapitolConnection.org* or contact Danelle Springer or David Reininger at 703-993-3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2010-17218 Filed 7-12-10; 11:15 am]
Connectionstraces to 1
Traces to 1 document
1 reference not yet in our index
  • Pub. L. 94-409
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Pub. L.Pub. L. 94-409
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.