Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2010-05-19 · Department of the Army, DoD · Notices

Notices. Notice of availability (NOA)

725 words·~3 min read·/register/2010/05/19/2010-12017·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 3710-08-P DEPARTMENT OF DEFENSE Department of the Army Record of Decision
(ROD)for the Development and Implementation of Range-Wide Mission and Major Capabilities at White Sands Missile Range (WSMR), NM AGENCY: Department of the Army, DoD. ACTION: Notice of availability (NOA). SUMMARY: The Department of the Army announces the availability of the ROD that documents and summarizes the decision to proceed with implementing the Preferred Alternative (Alternative
(1)identified in the Final Environmental Impact Statement (FEIS), including the following proposed land use changes: expansion of the Main Post and alterations in authorized uses of range areas; development of new and expanded infrastructure throughout the installation, and increase in the level of test activities; development of six new Specialized Areas (four for test operations and two to support small-scale military training); establishment of a Land Use and Airspace Strategy Plan and siting process for facilitating future tests and training activities at WSMR; and continued stationing of the Engineer Battalion and continued Main Post expansion for the Engineer Battalion, Brigade Combat Team
(BCT)Modernization, and other ongoing tenant programs. ADDRESSES: To request copies of the ROD, please contact: White Sands Test Center, Operations Office, Attention: Catherine Giblin, 124 Crozier Street, Building 124, Room B-15, White Sands Missile Range, NM 88002; fax:
(575)678-4082; e-mail: *WSMREIS@conus.army.mil.* FOR FURTHER INFORMATION CONTACT: Monte Marlin, Public Affairs Office, Building 1782, Headquarters Avenue, White Sands Missile Range, NM 88002;
(575)678-1134; or e-mail *monte.marlin@us.army.mil.* SUPPLEMENTARY INFORMATION: The development and implementation of a land use and airspace plan is intended to more fully realize and integrate the capabilities of the WSMR primary mission (research, development, testing, and evaluation (RDTE)) with new training capabilities and potential future Army stationing decisions. Establishing new test and training capabilities requires changing land use designations within the current installation boundaries. These changes would support current and future requirements and allow off-road vehicle maneuver on designated portions of the installation. WSMR will maintain its current RDTE mission and continue to support testing objectives of all military services and Federal agencies. In addition to consideration of a No Action Alternative (current test capabilities and land use designations with current levels of operations and activities), the FEIS assessed an additional alternative (Alternative 2) that would include all of the actions included in the Preferred Alternative plus potential future stationing of a Heavy Brigade Combat Team
(HBCT)(or comparable unit) by expanding the cantonment area and construction of supporting infrastructure and additional off-road maneuver areas for training on WSMR, On June 2, 2009, the Secretary of the Army announced a decision not to station an HBCT at WSMR in 2013; however, it was decided to retain the analysis in this FEIS to support implementation of potential future stationing decisions. After reviewing the alternatives presented in the FEIS, the Army has made the decision to implement the Preferred Alternative. By choosing to implement the Preferred Alternative in the ROD, the Army expects direct, indirect, and cumulative impacts as a result of land use changes allowing for expanded off-road vehicle use, facilities and infrastructure construction, expanded test and training activities, and an increase in personnel to support expanded WSMR operations. Impacts analyzed include a wide range of environmental resource areas: land use, air quality, noise, geology and soils, water resources, biological resources, cultural resources, socioeconomics, transportation, utilities, hazardous and toxic substances, sustainability, and cumulative environmental effects. Significant impacts could occur to air quality, soils, water resources, biological resources, socioeconomic resources, transportation, and utilities. As part of the decision to implement the Preferred Alternative at WSMR, the Army will enact environmental mitigation measures to minimize the impacts of this decision, including the implementation and continuation of existing environmental management programs, use of best management practices, and other specific mitigation measures. The ROD outlines that the Preferred Alternative reflects the proper balance of initiatives for the protection of the environment, funding considerations, and the need for WSMR to expand its capabilities as a major range and test facility base to support future Army needs associated with Army Transformation, the Army Campaign Plan, modernization of the fighting force, Army Growth and Force Structure Realignment, Global Defense Posture Realignment, and other Army initiatives. The ROD is available online at *http://www.wsmr.army.mil.* Dated: May 12, 2010. Addison D. Davis, IV, Deputy Assistant Secretary of the Army (Environment, Safety, and Occupational Health). [FR Doc. 2010-12017 Filed 5-18-10; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.