BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13685-000] Mr. Howard Rosenfeld; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications April 6, 2010. On March 22, 2010, Mr. Howard Rosenfeld filed an application, pursuant to section 4(f) of the Federal Power Act, for a preliminary permit to study the feasibility of the Warren Energy Independence Hydroelectic Project (Warren Project), to be located on Sucker Brook (a.k.a.
Lake Waramaug Brook) in Litchfield County, Connecticut. Some of the features of the proposed Warren Project would be new and located on residential property owned by the applicant, and some of the project works would include properties owned by the Town of Warren, Connecticut, such as an existing dam, intake, and water conveyance structures. The proposed project would consist of:
(1)An existing 80-foot-long, 4-foot-wide, and 5-foot-high masonry dam;
(2)an existing 48-inch square sluice gate structure feeding into;
(3)a new 18-inch-diameter, approximately 535-foot-long penstock leading to;
(4)an existing 25-foot-high, 22-foot-square stone-masonry building to house;
(5)a new turbine generator unit, with a maximum hydraulic capacity of 5 cubic feet per second
(cfs)and total installed generating capacity of 10 kilowatts (kW);
(6)a new approximately 400-foot-long, 3.4 kilovolt
(kV)transmission line, which would connect with the existing 23 kV distribution line owned by Connecticut Power & Light and adjacent to the applicant's property; and
(7)appurtenant facilities. The Warren Project would have an estimated average annual generation of 50,000 kilowatt-hours (kWh), which would be used by the applicant on-site or distributed to the power grid and sold directly to a local utility. *Applicant Contact:* Mr. Howard Rosenfeld, 10 Town Hill Road, Warren, Connecticut 06754,
(860)868-8087, *xmotifs@gmail.com.* *FERC Contact:* John Ramer,
(202)502-8969. *Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications:* 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. *See* 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at *http://­www.ferc.gov/filing-comments.asp.* More information about this project can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://­www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-13685) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. 2010-8353 Filed 4-12-10; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.