Notices. DEPARTMENT OF ENERGY

610 words·~3 min read·/register/2010/03/05/2010-4605

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13642-000] GB Energy Park, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications February 25, 2010. On December 11, 2009 and revised on January 14, 2010, GB Energy Park, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Gordon Butte Pumped Storage Project, which would be located near Martinsdale in Meagher County, Montana.
The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed project would consist of:
(1)A new upper reservoir with a surface area of 50 acres and a storage capacity of 4,050 acre-feet at a normal maximum surface elevation of 6,020 feet;
(2)a new 50-foot-high, 9,000-foot-long earthen and roller compacted concrete embankment at the upper reservoir;
(3)a new lower reservoir, with a surface area of 80 acres and a storage capacity of 4,050 acre-feet at a normal maximum surface elevation of 4,990 feet;
(4)a new 50-foot-high, 10,000-foot-long earthen and roller compacted concrete embankment at the lower reservoir;
(5)a new 25-foot-diameter, 4,000-foot-long steel-lined tunnel connecting to;
(6)a new powerhouse containing two reversible turbine generator units having a total installed capacity of 350 megawatts;
(7)an existing 4-foot-wide by 4-foot-deep, 3-mile-long canal carrying flows diverted from Cottonwood Creek by an existing diversion structure, or a new 3-foot-diameter, 2,400-foot-long pipeline carrying flows from an existing collection point on the South Fork of the Musselshell River, terminating at;
(8)a new pumphouse delivering initial fill and make-up flows to the lower reservoir via a 3-foot-diameter, approximately 250-foot-long pipeline;
(9)a new substation;
(10)a new 500-kilovolt (kV), 5.7-mile-long transmission line interconnecting with an existing 500-kV line, or a new 100-kV, 1.1-mile-long transmission line interconnecting to an existing 100-kV line;
(11)7.4 miles of new 20-foot-wide gravel access roads; and
(12)appurtenant facilities. The proposed project would have an average annual generation of 1,300 gigawatt-hours. *Applicant Contact:* Carl Borgquist, GB Energy Park, LLC, 1970 Stadium Drive, Suite 3, Bozeman, MT 59715; phone:
(406)585-3006. *FERC Contact:* Dianne Rodman,
(202)502-6077. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site ( *http://www.ferc.gov/docs-filing/ferconline.asp)* under the “eFiling” link. For a simpler method of submitting text only comments, click on “Quick Comment.” For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov;* call toll-free at
(866)208-3676; or, for TTY, contact
(202)502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-13642) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010-4605 Filed 3-4-10; 8:45 am]
Connectionstraces to 2
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.