Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2010-02-01 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

407 words·~2 min read·/register/2010/02/01/2010-1984·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13651-000] Lock + TM Hydro Friends Fund XXXIII, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 22, 2010. On January 8, 2010, Lock + TM Hydro Friends Fund XXXIII, LLC (Lock + Hydro) filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Green Lantern Project No. 13651, to be located on the Mississippi River, in Pike County, Illinois, and Ralls County, Missouri.
The project would to be located at the existing Mississippi River Lock and Dam No. 22 owned and operated by the U.S. Corps of Engineers that includes a reservoir, a lock and dam equipped with roller and tainter gates, and an earth dike. *The proposed project would consist of:*
(1)Two new underwater frame modules located adjacent to the earth dike each containing nine turbine generating units with a total capacity of about 9.45 megawatts;
(2)a new 220-foot, 450-foot-long intake conduit;
(3)a new 220-foot-wide, 50-foot-long tailrace; and
(4)a new 5-mile-long, 69 kilovolt transmission line. The project would produce an estimated average annual generation of about 62,130 megawatts-hours. *Lock + Hydro Contact:* Wayne F. Krouse, Chairman and CEO, Hydro Green Energy, LLC., 5090 Richmond Avenue, Suite 290, Houston, TX 77056,
(877)556-6566. *FERC Contact:* Tom Dean,
(202)502-6041. *Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications:* 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “eFiling” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at *http://www.ferc.gov/filing-comments.asp* . More information about this project can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp* . Enter the docket number (P-13651) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. 2010-1984 Filed 1-29-10; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.