BILLING CODE 7533-01-M NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC staff) is publishing this regular biweekly notice. The Act requires the Commission publish notice of any amendments issued, or proposed to be issued and grants the Commission the authority to issue and make immediately effective any amendment to an operating license upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person.
This biweekly notice includes all notices of amendments issued, or proposed to be issued from February 14, 2008 to February 27, 2008. The last biweekly notice was published on February 26, 2008 (73 FR 10293). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The Commission has made a proposed determination that the following amendment requests involve no significant hazards consideration.
Under the Commission's regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not
(1)Involve a significant increase in the probability or consequences of an accident previously evaluated; or
(2)create the possibility of a new or different kind of accident from any accident previously evaluated; or
(3)involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is shown below. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the **Federal Register** a notice of issuance. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. Written comments may be submitted by mail to the Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this **Federal Register** notice. Written comments may also be delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of written comments received may be examined at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. The filing of requests for a hearing and petitions for leave to intervene is discussed below. Within 60 days after the date of publication of this notice, person(s) may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request via electronic submission through the NRC E-Filing system for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's “Rules of Practice for Domestic Licensing Proceedings” in 10 CFR Part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the Commission's PDR, located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/doc-collections/cfr/* . If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements:
(1)The name, address, and telephone number of the requestor or petitioner;
(2)the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding;
(3)the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and
(4)the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner/requestor shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner/requestor intends to rely in proving the contention at the hearing. The petitioner/requestor must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner/requestor intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner/requestor to relief. A petitioner/requestor who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment. A request for hearing or a petition for leave to intervene must be filed in accordance with the NRC E-Filing rule, which the NRC promulgated in August 28, 2007 (72 FR 49139). The E-Filing process requires participants to submit and serve documents over the internet or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek a waiver in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least five
(5)days prior to the filing deadline, the petitioner/requestor must contact the Office of the Secretary by e-mail at *hearingdocket@nrc.gov* , or by calling
(301)415-1677, to request
(1)a digital ID certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and/or
(2)creation of an electronic docket for the proceeding (even in instances in which the petitioner/requestor (or its counsel or representative) already holds an NRC-issued digital ID certificate). Each petitioner/requestor will need to download the Workplace Forms Viewer TM to access the Electronic Information Exchange (EIE), a component of the E-Filing system. The Workplace Forms Viewer TM is free and is available at *http://www.nrc.gov/site-help/e-submittals/install-viewer.html* .Information about applying for a digital ID certificate is available on NRC's public Web site at *http://www.nrc.gov/site-help/e-submittals/apply-certificates.html* . Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format
(PDF)in accordance with NRC guidance available on the NRC public Web site at *http://www.nrc.gov/site-help/e-submittals.html* . A filing is considered complete at the time the filer submits its documents through EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically may seek assistance through the “Contact Us” link located on the NRC Web site at *http://www.nrc.gov/site-help/e-submittals.html* or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is
(800)397-4209 or locally,
(301)415-4737. Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by:
(1)First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or
(2)courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition and/or request should be granted and/or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later than 11:59 p.m. Eastern Time on the due date. Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at *http://ehd.nrc.gov/EHD_Proceeding/home.asp,* unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. For further details with respect to this amendment action, see the application for amendment which is available for public inspection at the Commission's PDR, located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html* . If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the PDR Reference staff at 1
(800)397-4209,
(301)415-4737 or by e-mail to *pdr@nrc.gov* . AmerGen Energy Company, LLC, et al., Docket No. 50-219, Oyster Creek Nuclear Generating Station (Oyster Creek), Ocean County, New Jersey *Date of amendment request:* May 16, 2007. *Description of amendment request:* The proposed amendment would revise the Oyster Creek Technical Specification
(TS)3.5.A.6, “Primary Containment.” Specifically, the proposed change would revise the actions taken and applicability of the requirement to inert the primary containment atmosphere to less than 4 percent oxygen (O <sup>2</sup> ) concentration. Currently, the primary containment atmosphere must be inert within 24 hours of placing the reactor mode switch in the run mode and may be de-inerted 24 hours prior to a scheduled shutdown. The proposed revision would require the primary containment atmosphere to be inert within 24 hours after reaching 15 percent of rated thermal power and would allow the atmosphere to be de-inerted 24 hours prior to reducing power below 15 percent rated thermal power. Additionally, the proposed revision would introduce definitions for thermal power and rated thermal power, including changes for their consistent use within the TSs. *Basis for proposed no significant hazards consideration determination:* As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed changes modify the Technical Specifications
(TS)by adding definitions of Rated Thermal Power
(RTP)and Thermal Power to TS and adopting containment inerting and de-inerting requirements that are consistent with the guidance of NUREG-1433, “Standard Technical Specifications—General Electric Plants, BWR/4” (STS), Revision 3.1. Additionally, various TS and TS Bases pages are being revised to capitalize THERMAL POWER and RATED THERMAL POWER, to maintain consistency with typical TS format. The proposed changes will [require] inerting of the primary containment within 24 hours of exceeding 15%
(RTP)during a plant startup, and [allow] de-inerting 24 hours prior to reducing thermal power to less than 15% RTP during a plant shutdown. Also, a new TS condition will be added to identify required actions if the primary containment oxygen concentration increases to greater than or equal to four volume percent while in the RUN MODE. The proposed changes do not alter the physical configuration of the plant, nor do they affect any previously analyzed accident initiators. The [Loss of Coolant Accident (LOCA)] analysis assumes that a [LOCA] occurs at 100% power. The consequences of a LOCA at less than 15% RTP would be much less severe, and produce less hydrogen than a LOCA at 100% power. Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed changes add definitions of [RTP] and Thermal Power to TS and adopt the STS guidance regarding containment inerting/de-inerting requirements. Additionally, various TS and TS Bases pages are being revised to capitalize THERMAL POWER and RATED THERMAL POWER, to maintain consistency with typical TS format. The proposed changes introduce no new mode of plant operation and they do not involve any physical modification to the plant. The proposed changes [remain bounded by] the current [LOCA] analysis assumptions. No setpoints are being changed which would alter the dynamic response of plant equipment. Accordingly, no new failure modes are introduced. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. The proposed changes add definitions of [RTP] and Thermal Power to TS and adopt the [NUREG-1433, “Standard Technical Specifications—General Electric Plants, BWR/4, Revision 3.1, December 1, 2005] guidance regarding containment inerting/de-inerting requirements. Additionally, various TS and TS Bases pages are being revised to capitalize THERMAL POWER and RATED THERMAL POWER, to maintain consistency with typical TS format. Adoption of the STS reference point operating condition of 15% RTP adds operational flexibility related to the performance of inspections and maintenance inside primary containment during plant startup and shutdown. Making the 24-hour time period contingent upon core thermal power, rather than reactor mode switch position during a plant startup, will enable placing the mode switch in the RUN position sooner. The proposed changes do not [invalidate] any assumptions or conclusions contained in the plant safety analyses, which assume that a LOCA occurs at 100% power. The current Limiting Condition for Operation action requirement and shutdown reference condition for de-inerting involve a complete reactor shutdown. Changing this requirement to 15% RTP, avoids the potential for an unnecessary plant transient. Therefore, the proposed changes do not involve a significant reduction in any margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, and with the changes noted above, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. *Attorney for licensee:* Thomas S. O'Neill, Associate General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL 60555. *NRC Branch Chief:* Harold K. Chernoff. Entergy Gulf States Louisiana, LLC, and Entergy Operations, Inc., Docket No. 50-458, River Bend Station, Unit 1, West Feliciana Parish, Louisiana *Date of amendment request:* January 25, 2008. *Description of amendment request:* The proposed changes will revise the Technical Specifications
(TS)3.7.5, “Main Turbine Bypass System,” for River Bend Station, Unit 1 (RBS), allowing the reactor operating limits to be modified, as specified in the RBS, Core Operating Limits Report (COLR), to compensate for the inoperability of the Main Turbine Bypass System (MTBS). The changes will provide an alternative to the existing Limiting Condition for Operation
(LCO)for the MTBS. The revised TS will require that either the MTBS be OPERABLE or that the Average Planar Linear Heat Generation Rate (APLHGR), Minimum Critical Power Ratio (MCPR), and Linear Heat Generation Rate and limits for the inoperable MTBS be placed in effect as specified in the COLR. *Basis for proposed no significant hazards consideration determination:* As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The Main Turbine Bypass System
(MTBS)functions to limit reactor pressure and power increases during certain transients postulated in the accident analysis. The MTBS is a mitigation function and not the initiator of any evaluated accident or transient. Operation with inoperable MTBS and compliance with the revised set of Minimum Critical Power Ratio (MCPR), Average Planar Linear Heat Generation Rate (APLHGR) and Linear Heat Generation Rate
(LHGR)operating limits will offset the impact of losing the MTBS function. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed change will not create any new modes of plant or equipment operation. The proposed change allows the option to apply an additional penalty factor to the MCPR, APLHGR, and LHGR when the MTBS is inoperable. With the revised set of operating limits will offset the impact of losing the MTBS function, the margin to the MCPR SL and the thermal mechanical design limits are maintained. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated. 3. Does the proposed change involve a significant reduction in a margin of safety? Response: No. E>P>By establishing new restrictive APLHGR, MCPR, and LHGR operating limits, there are no changes to the plant design and safety analysis. There are no changes to the reactor core design instrument setpoints. The margin of safety assumed in the safety analysis is not affected. Applicable regulatory requirements will continue to be met and adequate defense-in-depth will be maintained. Sufficient safety margins will be maintained. The analytical methods used to determine the revised core operating limits were reviewed and approved by the NRC, and are described in Technical Specification 5.6.5. Therefore, the proposed change does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. *Attorney for licensee:* Terence A. Burke, Associate General Council—Nuclear Entergy Services, Inc., 1340 Echelon Parkway, Jackson, Mississippi 39213. *NRC Branch Chief:* Thomas G. Hiltz. Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc., Docket No. 50-271, Vermont Yankee Nuclear Power Station, Vernon, Vermont *Date of amendment request:* February 6, 2008. *Description of amendment request:* The proposed amendment would revise the Surveillance Requirements
(SRs)for control rod exercising from weekly to monthly in Technical Specification
(TS)4.3.A.2, revise verification of control rod coupling integrity as described in TS 4.3.B.1, revise the scram insertion time Limiting Conditions for Operation
(LCO)and SRs as described in TS 3.3.C and 4.3.C, and enhance TS 3.3.D and 4.3.D, the LCO and SR for Control Rod Accumulators. *Basis for proposed no significant hazards consideration determination:* As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration which is presented below: 1. The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed changes do not significantly affect the design or fundamental operation and maintenance of the plant. Accident initiators or the frequency of analyzed accident events are not significantly affected as a result of the proposed changes; therefore, there will be no significant change to the probabilities of accidents previously evaluated. The proposed changes do not significantly alter assumptions or initial conditions relative to the mitigation of an accident previously evaluated. The proposed changes continue to ensure process variables, structures, systems, and components
(SSCs)are maintained consistent with the safety analyses and licensing basis. The revised Technical Specifications continue to require that SSCs are properly maintained to ensure operability and performance of safety functions as assumed in the safety analyses. The design basis events analyzed in the safety analyses will not change significantly as a result of the proposed changes to the TS. Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed changes do not involve any physical alteration of the plant (no new or different type of equipment being installed) and do not involve a change in the design, normal configuration or basic operation of the plant. The proposed changes do not introduce any new accident initiators. In some cases, the proposed changes impose different requirements; however, these new requirements are consistent with the assumptions in the safety analyses. Where requirements are relocated to other licensee-controlled documents, adequate controls exist to ensure their proper maintenance. The proposed changes do not involve significant changes in the fundamental methods governing normal plant operation and do not require unusual or uncommon operator actions. The proposed changes provide assurance that the plant will not be operated in a mode or condition that violates the essential assumptions or initial conditions in the safety analyses and that SSCs remain capable of performing their intended safety functions as assumed in the same analyses. Consequently, the response of the plant and the plant operator to postulated events will not be significantly different. Therefore, the proposed TS change does not create the possibility of a new or different kind of accident from any previously evaluated. 3. The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment will not involve a significant reduction in a margin of safety. Margin of safety is related to the confidence in the ability of the fission product barriers to perform their design functions during and following an accident situation. The proposed changes do not significantly affect any of the assumptions, initial conditions or inputs to the safety analyses. Plant design is unaffected by these proposed changes and will continue to provide adequate defense-in-depth and diversity of safety functions as assumed in the safety analyses. There are no proposed changes to any of the Safety Limits or Limiting Safety System Setting requirements. The proposed changes maintain requirements consistent with safety analyses assumptions and the licensing basis. Fission product barriers will continue to meet their design capabilities without any significant impact to their ability to maintain parameters within acceptable limits. The safety functions are maintained within acceptable limits without any significant decrease in capability. Therefore, the proposed changes do not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. *Attorney for licensee:* Mr. William C. Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc., 400 Hamilton Avenue, White Plains, NY 10601. *NRC Branch Chief:* Mark G. Kowal. Florida Power and Light Company, et al., Docket No. 50-389, St. Lucie Plant, Unit No. 2, St. Lucie County, Florida *Date of amendment request:* January 23, 2008. *Description of amendment request:* Replace the current St. Lucie Unit 2 Technical Specification pressure-temperature (P/T) limit curves with new P/T limit curves applicable to 55 effective full-power years (EFPY). The low-temperature overpressure protection
(LTOP)requirements, which are based on the P/T limits, will also be applicable to 55 EFPY. *Basis for proposed no significant hazards consideration determination:* As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
(1)Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed changes have been determined in accordance with the methodologies set forth in the regulations to provide an adequate margin of safety to ensure that the reactor vessel will withstand the effects of normal startup and shutdown cyclic loads due to system temperature and pressure changes as well as the loads associated with reactor trips. The regulations of 10 CFR part 50 Appendix A, Design Criterion 14 and Design Criterion 31 remains satisfied. The pressure-temperature (P/T) limit curves in the Technical Specifications are conservatively generated in accordance with the fracture toughness requirements of the ASME Code [American Society of American Engineers Boiler and Pressure Vessel Code] Section XI, Appendix G. The margins of safety against fracture provided by the P/T limits using the requirements of 10 CFR 50 Appendix G are equivalent to those recommended in ASME Section XI, Appendix G. The Adjusted Reference Temperature
(ART)values are based on the guidance of RG [Regulatory Guide] 1.99 [Reference 4]. The proposed changes will not result in physical changes to structures, systems or components [(]SSCs[)] or to event initiators or precursors. Changing the heatup and cooldown curves and the pressure relief setpoints to reflect 55 EFPY does not affect the ability to control the RCS at low[-]temperatures such that the integrity of the reactor coolant pressure boundary would not be compromised by violating the P/T limits. The proposed changes will not impact assumptions and conditions previously used in the radiological consequence evaluations nor affect mitigation of these consequences due to an accident described in the UFSAR [Updated Final Safety Analysis Report]. Also, the proposed changes will not impact a plant system such that previously analyzed SSCs might be more likely to fail. The initiating conditions and assumptions for accidents described in the UFSAR remain as analyzed. Thus, based on the above, reasonable assurance is provided that the proposed amendment does not significantly increase the probability or consequences of accidents previously evaluated.
(2)Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated. The requirements for P/T limit curves and LTOP have been in place since the beginning of plant operation. The revised curves are based on a later edition of Section XI of the ASME Code that incorporates current industry standards for P/T curves. The revised curves also are based on reactor vessel irradiation damage predictions using RG 1.99 methodology. No new failure modes are identified nor are any SSCs required to be operated outside of their design bases. Consequently, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
(3)Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety. The proposed P/T curves continue to maintain the safety margins of 10 CFR 50 Appendix G by defining the limits of operation which prevent nonductile failure of the reactor pressure vessel. Analyses have demonstrated that the fracture toughness requirements are satisfied and that conservative operating restrictions are maintained for the purpose of low[-]temperature overpressure protection. The P/T limit curves provide assurance that the RCS [reactor coolant system] pressure boundary will behave in a ductile manner and that the probability of a rapidly propagating fracture is minimized. Therefore, operation in accordance with the proposed amendment would not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. *Attorney for licensee:* M.S. Ross, Attorney, Florida Power & Light, P.O. Box 14000, Juno Beach, Florida 33408-0420. *NRC Branch Chief:* Thomas H. Boyce. Nuclear Management Company, LLC, Docket No. 50-263, Monticello Nuclear Generating Plant, Wright County, Minnesota *Date of amendment request:* February 6, 2008. *Description of amendment request:* The proposed amendment would revise the Technical Specifications
(TSs)in conjunction with the replacement of the analog power range neutron monitoring
(PRNM)system with a more reliable digital upgrade, the General Electric—Hitachi Nuclear Measurement Analysis and Control (NUMAC) digital system. This upgrade also includes an oscillation power range monitor capability, which implements a detect-and-suppress long-term stability solution methodology. This upgrade will also simplify the management and maintenance of the PRNM. As a result of this design change, TS 3.3.1.1, “Reactor Protection System
(RPS)Instrumentation;” TS 3.3.2.1, “Control Rod Block Instrumentation;” TS 3.4.1, “Recirculation Loops Operating;” and TS 5.6.3, “Core Operating Limits Report (COLR)” will be revised. *Basis for proposed no significant hazards consideration determination:* As required by Title 10 of the *Code of Federal Regulations* (10 CFR) Part 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration (NSHC). The NRC staff reviewed the licensee’s analysis, and has performed its own analysis as follows:
(1)Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? No. The proposed amendment will upgrade the existing PRNM system from analog to digital, and revise Technical Specification requirements associated with the PRNM system. The PRNM system will continue to perform its design functions after the upgrade and TS changes under all conditions of operation for which the PRNM system was designed; thus, there is no decrease in the functionality of the PRNM system. The upgrade from analog to digital is expected to improve reliability of the system. Whether the PRNM system is analog or digital does not have an impact on precursors leading to previously evaluated accidents; therefore, the proposed amendment does not increase the probability of a previously evaluated accident. The upgraded PRNM system will continue to carry out the PRNM design functions; therefore, the plant systems required to mitigate accidents will not be negatively affected by the upgrade of the PRNM system, and will remain capable of performing their accident-mitigating functions. As a result, the proposed amendment will not lead to a significant change in the consequences of any accident previously evaluated.
(2)Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? No. The proposed amendment would only upgrade the PRNM system from analog to digital, and revise associated Technical Specification requirements. The PRNM system was not determined to be a precursor of previously evaluated accidents. Its conversion from analog to digital would not change this status. Furthermore, other than the PRNM system, there will not be any physical alteration of any system, structure, or component
(SSC)or change in the way any SSC is operated. The proposed amendment does not involve operation of any SSCs in a manner or configuration different from those previously recognized or evaluated. No new failure mechanisms will be introduced by the upgraded PRNM system and associated requirements. Thus, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
(3)Does the proposed amendment involve a significant reduction in a margin of safety? No. The proposed amendment does not involve lowering any acceptance standard for the PRNM system. Also, there will be no relaxation of any limiting condition for operation, relaxation of assumptions for previously evaluated accidents, or relaxation of methodology used to evaluate consequences of accidents. Therefore, the proposed amendment does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee's analysis and, based on the NRC staff's own analysis above, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the proposed amendment involves no significant hazards consideration. *Attorney for licensee:* Peter M. Glass, Assistant General Counsel, Xcel Energy Services, Inc., 414 Nicollet Mall, Minneapolis, MN 55401. *NRC Acting Branch Chief:* Patrick Milano. Notice of Issuance of Amendments to Facility Operating Licenses During the period since publication of the last biweekly notice, the Commission has issued the following amendments. The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for A Hearing in connection with these actions was published in the **Federal Register** as indicated. Unless otherwise indicated, the Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. If the Commission has prepared an environmental assessment under the special circumstances provision in 10 CFR 51.22(b) and has made a determination based on that assessment, it is so indicated. For further details with respect to the action see
(1)the applications for amendment,
(2)the amendment, and
(3)the Commission's related letter, Safety Evaluation and/or Environmental Assessment as indicated. All of these items are available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html* . If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the PDR Reference staff at 1
(800)397-4209,
(301)415-4737 or by e-mail to *pdr@nrc.gov* . Carolina Power & Light Company, Docket Nos. 50-325 and 50-324, Brunswick Steam Electric Plant, Units 1 and 2, Brunswick County, North Carolina *Date of application for amendments:* August 6, 2007. *Brief Description of amendments:* The amendments revise Technical Specification 5.5.12, “Primary Containment Leakage Rate Testing Program,” to allow the required visual inspections to be performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Subsections IWL and IWE. *Date of issuance:* February 8, 2008. *Effective date:* Date of issuance, to be implemented within 60 days. *Amendment Nos.:* 245 and 273. *Facility Operating License Nos. DPR-71 and DPR-62:* Amendments change the Technical Specifications. *Date of initial notice in* Federal Register: December 4, 2007 (72 FR 68208). The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 8, 2008. No significant hazards consideration comments received: No. Duke Power Company LLC, Docket No. 50-369, McGuire Nuclear Station, Unit 1, Mecklenburg County, North Carolina *Date of application for amendments:* February 21, 2007, as supplemented August 9, 2007. *Brief description of amendments:* The amendment revised administrative TS 5.5.2, “Containment Leak Rate Testing Program,” from the currently approved 15-year interval (since the last McGuire Unit 1 Type A test) to a frequency encompassing the end of the McGuire Unit 1 End of Cycle
(EOC)19 refueling outage (approximately 6 months beyond the present frequency). *Date of issuance:* February 13, 2008. *Effective date:* As of the date of issuance and shall be implemented within 30 days from the date of issuance. *Amendment No.:* 244. *Renewed Facility Operating License No. NPF-9:* Amendments revised the license and the technical specifications. *Date of initial notice in* Federal Register: December 31, 2007 (72 FR 74357) The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 13, 2008. No significant hazards consideration comments received: No. Duke Power Company LLC, Docket Nos. 50-269, 50-270, and 50-287, Oconee Nuclear Station, Units 1, 2, and 3, Oconee County, South Carolina *Date of application of amendments:* June 1, 2006, supplemented by letters dated March 14, October 8, and October 30, 2007. *Brief description of amendments:* The amendments authorized revisions of the Updated Final Safety Analysis Report to incorporate the use of fiber-reinforced polymer system that will be used to strengthen certain masonry walls to withstand the pressure loads from a tornado. *Date of Issuance:* February 21, 2008. *Effective date:* As of the date of issuance and shall be implemented within 30 days from the date of issuance. *Amendment Nos.:* 360, 362, and 361. *Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55:* Amendments revised the licenses and the technical specifications. *Date of initial notice in* Federal Register: July 18, 2006 (71 FR 40745). The supplements dated March 14, October 8, and October 30, 2007, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 21, 2008. No significant hazards consideration comments received: No. Entergy Nuclear Operations, Inc., Docket No. 50-255, Palisades Plant, Van Buren County, Michigan *Date of application for amendment:* August 21, 2007. *Brief description of amendment:* The amendment revised the Technical Specifications
(TS)to adopt TS Task Force
(TSTF)change traveler TSTF-448, Revision 3, “Control Room Habitability.” *Date of issuance:* February 20, 2008. *Effective date:* As of the date of issuance and shall be implemented within 120 days. *Amendment No.:* 230. *Facility Operating License No. DPR-20.* Amendment renewed the Technical Specifications and Facility Operating License. *Date of initial notice in* Federal Register: November 6, 2007 (72 FR 62687). The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated February 20, 2008. No significant hazards consideration comments received: No. Exelon Generation Company, LLC, Docket Nos. 50-352 and 50-353, Limerick Generating Station, Units 1 and 2, Montgomery County, Pennsylvania *Date of application for amendment:* February 20, 2007, as supplemented by letters dated September 14, 2007, October 18, 2007 and December 20, 2007. *Brief description of amendment:* The amendments consist of changes to the Technical Specifications for each unit to allow a deferral of the next required Type A, containment integrated leak rate test to May 15, 2013 (Unit 1) and to May 21, 2014 (Unit 2). The changes reflect an extension of the test interval for each unit from 10 to 15 years. *Date of issuance:* February 20, 2008 *Effective date:* As of the date of issuance and shall be implemented within 60 days of issuance. *Amendment Nos.:* 190 and 151 *Facility Operating License Nos. NPF-39 and NPF-85.* This amendment revised the license and the technical specifications. *Date of initial notice in* Federal Register: August 14, 2007 (72 FR 45456). The supplements dated September 14, 2007, October 18, 2007 and December 20, 2007, provided additional information that clarified the application, did not expand the scope of the application as originally noticed and did not change the NRC staff's original proposed no significant hazards determination. The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated February 20, 2008. No significant hazards consideration comments received: No. FirstEnergy Nuclear Operating Company, et al., Docket Nos. 50-334 and 50-412 Beaver Valley Power Station, Unit Nos. 1 and 2, Beaver County, Pennsylvania *Date of application for amendment:* August 30, 2007. *Brief description of amendment:* The amendments will modify Technical Specification
(TS)requirements related to control room envelope habitability in TS 3.7.10, “Control Room Emergency Ventilation System (CREVS)” and TS Section 5.5, “Administrative Controls—Programs and Manuals.” The changes are consistent with Nuclear Regulatory Commission
(NRC)approved Industry/Technical Specification Task Force
(TSTF)Traveler TSTF-448, Revision 3. The availability of this TS improvement was published in the **Federal Register** on January 17, 2007 (72 FR 2022), as part of the consolidated line item improvement process. *Date of issuance:* February 15, 2008. *Effective date:* As of the date of issuance, and shall be implemented within 120 days from the date of issuance. *Amendment No.:* 281 and 163. *Facility Operating License Nos. DPR-66 and NPF-73:* The amendments revised the License and T. *Date of initial notice in* Federal Register: November 20, 2007 (72 FR 65365). The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated February 15, 2008. No significant hazards consideration comment. Florida Power and Light Company, et al., Docket Nos. 50-335 and 50-389, St. Lucie Plant, Unit Nos. 1 and 2, St. Lucie County, Florida *Date of application for amendments:* June 4, 2007. *Brief description of amendments:* The amendments removed Technical Specification
(TS)requirements related to hydrogen recombiners and hydrogen monitors as part of the consolidated line item improvement process. *Date of Issuance:* February 22, 2008. *Effective Date:* As of the date of issuance and shall be implemented within 60 days of issuance. *Amendment Nos.:* 204 and 151. *Renewed Facility Operating License Nos. DPR-67 and NPF-16:* Amendments revised the TSs. *Date of initial notice in* Federal Register: August 14, 2007 (72 FR 45457). The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 22, 2008. No significant hazards consideration comments received: No. FPL Energy, Point Beach, LLC, Docket Nos. 50-266 and 50-301, Point Beach Nuclear Plant, Units 1 and 2, Town of Two Creeks, Manitowoc County, Wisconsin *Date of application for amendments:* July 12, 2007, as supplemented by letter dated October 8, 2007. *Brief description of amendments:* The proposed amendment would revise Technical Specification 3.6.3, “Containment Isolation Valves.” The revision would delete Surveillance Requirement 3.6.3.1, which is no longer required due to the containment purge supply and exhaust valve isolation function being replaced with blind flanges. The proposed amendment would also support a change to the Final Safety Analysis Report to revise the requirement to leak check the purge supply and exhaust valves. *Date of issuance:* February 19, 2008. *Effective date:* As of the date of issuance and shall be implemented within 30 days. *Amendment Nos.:* 231 and 236. *Renewed Facility Operating License Nos. DPR-24 and DPR-27:* Amendments revised the Technical Specifications/License. *Date of initial notice in* Federal Register: August 28, 2007 (72 FR 49580). The October 8, 2007 supplement, contained clarifying information and did not change the staff's initial proposed finding of no significant hazards consideration. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 19, 2008. No significant hazards consideration comments received: No. Nebraska Public Power District, Docket No. 50-298, Cooper Nuclear Station, Nemaha County, Nebraska *Date of amendment request:* August 10, 2007, as supplemented by letter dated December 20, 2007. *Brief description of amendment:* The amendment revised the Technical Specification 2.1.1.2 values of two recirculation loop and single recirculation loop safety limit minimum critical power ratio to reflect results of a cycle-specific calculation. *Date of issuance:* February 14, 2008. *Effective date:* As of the date of issuance and shall be implemented within 30 days of issuance. *Amendment No.:* 229. *Facility Operating License No. DPR-46* : Amendment revised the Facility Operating License and Technical Specifications. *Date of initial notice in* Federal Register: September 25, 2007 (72 FR 54475). The supplement dated December 20, 2007, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the **Federal Register** . The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated February 14, 2008. No significant hazards consideration comments received: No. Nine Mile Point Nuclear Station, LLC, Docket No. 50-410, Nine Mile Point Nuclear Station, Unit No. 2 (NMP2), Oswego County, New York *Date of application for amendment:* July 30, 2007, as supplemented by letter dated January 3, 2008. *Brief description of amendment:* The amendment changes the NMP2 Technical Specifications by changing the testing frequency for drywell spray nozzles specified in Surveillance Requirement 3.6.1.6.3 from “10 years” to “following maintenance that could result in nozzle blockage.” *Date of issuance:* February 11, 2008. *Effective date:* As of the date of issuance to be implemented within 30 days. *Amendment No.:* 122. *Renewed Facility Operating License No. NPF-69:* Amendment revises the License and Technical Specifications. *Date of initial notice in* Federal Register: September 11, 2007 (72 FR 51864). The supplement dated January 3, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the Nuclear Regulatory Commission staff's initial proposed no significant hazards consideration determination. The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated February 11, 2008. No significant hazards consideration comments received: No Nuclear Management Company, LLC, Docket Nos. 50-282 and 50-306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue County, Minnesota *Date of application for amendments:* February 28, 2007. *Brief description of amendments:* The amendments revise Technical Specification
(TS)5.2.2, “Plant Staff”, and TS 5.3, “Plant Staff Qualifications,” requirements for shift technical advisor qualifications. The proposed changes will specify that personnel who perform the function of shift technical advisor
(STA)shall meet the qualification requirements of the Commission Policy Statement on Engineering Expertise on Shift, published in **Federal Register** 50 FR 43621, October 28, 1985. This change will allow qualified personnel to perform the function of STA without also holding a senior reactor operator
(SRO)license. *Date of issuance:* February 25, 2008. *Effective date:* As of the date of issuance and shall be implemented within 90 days. *Amendment Nos.:* 184 and 174. *Facility Operating License Nos. DPR-42 and DPR-60:* Amendments revised the Technical Specifications and Facility Operating License. *Date of initial notice in* Federal Register: May 8, 2007 (72 FR 26177). The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 25, 2008. No significant hazards consideration comments received: No. PPL Susquehanna, LLC, Docket No. 50-388, Susquehanna Steam Electric Station, Unit 2 (SSES 2), Luzerne County, Pennsylvania *Date of application for amendment:* March 2, 2007, as supplemented on December 5, 2007. *Brief description of amendment:* The amendment adds an ACTIONS Note 3 to the SSES 2 Technical Specification
(TS)3.8.1, “AC Sources—Operating,” to allow a Unit 1 4160 volt subsystem to be de-energized and removed from service to perform bus maintenance. *Date of issuance:* February 19, 2008. *Effective date:* As of the date of issuance and to be implemented within 30 days. *Amendment No.:* 225. *Facility Operating License No. NPF-22:* The amendments revised the License and TSs. *Date of initial notice in* Federal Register: August 14, 2007 (72 FR 45459). The supplement dated December 5, 2007, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 19, 2008. No significant hazards consideration comments received: No. PPL Susquehanna, LLC, Docket No. 50-387 and 50-388, Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2), Luzerne County, Pennsylvania *Date of application for amendments:* August 14, 2007, as supplemented on January 24, 2008. *Brief description of amendments:* The amendments add a new license condition to the SSES 1 and 2 operating licenses to permit the leakage-boundary and containment isolation valves in Title 10 of the *Code of Federal Regulations* Part 50, Appendix J leakage test program, to be tested at the constant pressure power uprate
(CPPU)peak containment internal pressure
(Pa)in accordance with the current scheduled test intervals rather than requiring all of the valves to be tested at the higher Pa prior to the implementation of the CPPU. *Date of issuance:* February 20, 2008. *Effective date:* As of the date of issuance and to be implemented within 30 days. *Amendment Nos.:* 247 and 226. *Facility Operating License Nos. NPF-14 and NPF-22:* The amendments revised the License. *Date of initial notice in* Federal Register: September 25, 2007 (72 FR 54479). The supplement dated January 24, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 20, 2008. No significant hazards consideration comments received: No. PSEG Nuclear LLC, Docket Nos. 50-272 and 50-311, Salem Nuclear Generating Station, Unit Nos. 1 and 2, Salem County, New Jersey *Date of application for amendments:* March 16, 2007, as supplemented on August 30, September 14, and November 20, 2007, and January 16, 2008. *Brief description of amendments:* The amendments revise the Updated Final Safety Analysis Report (UFSAR) to modify the Salem licensing basis with respect to the response times associated with a steam generator feedwater pump
(SGFP)trip and feedwater isolation valve
(FIV)closure. The amendments also revise the Technical Specification
(TS)requirements for the containment fan cooler unit
(CFCU)cooling water flow rate. These changes are associated with a revised containment response analysis that credits an SGFP trip and FIV closure (on a feedwater regulator valve failure) to reduce the mass/energy release to the containment during a main steam line break. The containment analysis also credits a reduced heat removal capability for the CFCUs, allowing a reduction in the required service water flow to the CFCUs. *Date of issuance:* February 27, 2008. *Effective date:* As of the date of issuance, to be implemented prior to restart from refueling outage 1R19 for Salem Unit 1 and prior to restart from refueling outage 2R16 for Salem Unit 2. *Amendment Nos.:* 287 and 270. *Facility Operating License Nos. DPR-70 and DPR-75:* The amendments revise the TSs, the license and the UFSAR. *Date of initial notice in* Federal Register: April 10, 2007 (72 FR 17951). The letters dated August 30, September 14, and November 20, 2007, and January 16, 2008, provided clarifying information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original **Federal Register** notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 27, 2008. No significant hazards consideration comments received: No. Southern Nuclear Operating Company, Inc., Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, City of Dalton, Georgia, Docket Nos. 50-321 and 50-366, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Appling County, Georgia *Date of application for amendments:* October 18, 2007. *Brief description of amendments:* The amendments revised the Technical Specifications for unit staff qualifications and also included a revised position title for “Health Physics Superintendent.” *Date of issuance:* February 21, 2008. *Effective date:* As of the date of issuance and shall be implemented within 90 days from the date of issuance. *Amendment Nos.:* 255 and 199. *Renewed Facility Operating License Nos. DPR-57 and NPF-5:* Amendments revised the licenses and the technical specifications. *Date of initial notice in* Federal Register: November 20, 2007 (72 FR 65372). The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated February 21, 2008. No significant hazards consideration comments received: No. Dated at Rockville, Maryland, this 29th day of February 2008. For the Nuclear Regulatory Commission. John W. Lubinski, Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8-4690 Filed 3-10-08; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-456 and STN 50-457] Braidwood Station, Units 1 and 2; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The U.S. Nuclear Regulatory Commission (the Commission, or the NRC) is considering issuance of an amendment to Facility Operating License No. NPF-72 and Facility Operating License No. NPF-77 to Exelon Generation Company, LLC (the licensee) for operation of the Braidwood Station, Units 1 and 2 (Braidwood), which is located in Will County, Illinois. The proposed amendment in the licensee's application dated February 25, 2008, would revise Technical Specification
(TS)5.5.9, “Steam Generator
(SG)Program,” and TS 5.6.9, “Steam Generator Tube Inspection Report.” For TS 5.5.9, the amendment would replace the existing alternate repair criteria
(ARC)in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2; however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2. Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made a proposed determination that the amendment request involves no significant hazards consideration. Under the Commission's regulations in Title 10 of the Code of Federal Regulations (10 CFR), section 50.92, this means that operation of the facility in accordance with the proposed amendment would not
(1)involve a significant increase in the probability or consequences of an accident previously evaluated; or
(2)create the possibility of a new or different kind of accident from any accident previously evaluated; or
(3)involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
(1)Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. Of the various accidents previously evaluated, the proposed changes only affect the steam generator tube rupture (SGTR), postulated steam line break (SLB), locked rotor and control rod ejection accident evaluations. Loss-of-coolant accident
(LOCA)conditions cause a compressive axial load to act on the tube. Therefore, since the LOCA tends to force the tube into the tubesheet rather than pull it out, it is not a factor in this amendment request. Another faulted load consideration is a safe shutdown earthquake (SSE); however, the seismic analysis of Model D5 steam generators has shown that axial loading of the tubes is negligible during an SSE. At normal operating pressures, leakage from primary water stress corrosion cracking (PWSCC) below 17 inches from the top of the tubesheet is limited by both the tube-to-tubesheet crevice and the limited crack opening permitted by the tubesheet constraint. Consequently, negligible normal operating leakage is expected from cracks within the tubesheet region. For the SGTR event, the required structural margins of the steam generator tubes is maintained by limiting the allowable ligament size for a circumferential crack to remain in service to 214 degrees below 17 inches from the top of the tubesheet. Tube rupture is precluded for cracks in the hydraulic expansion region due to the constraint provided by the tubesheet. The potential for tube pullout is mitigated by limiting the allowable crack size to 214 degrees, which takes into account eddy current uncertainty and crack growth rate. It has been shown that a circumferential crack with an azimuthal extent of 214 degrees meets the performance criteria of NEI [Nuclear Energy Institute] 97-06, Rev. 2, “Steam Generator Program Guidelines” and the Draft Regulatory Guide
(RG)1.121, “Bases for Plugging Degraded PWR Steam Generator Tubes.” Likewise, a visual inspection will be conducted as necessary to confirm that a circumferential crack of greater than 294 degrees does not remain in service in the tube-to-tubesheet weld metal in any tube thereby mitigating the potential for tube pullout. Therefore, the margin against tube burst/pullout is maintained during normal and postulated accident conditions and the proposed change does not result in a significant increase in the probability or consequence of a SGTR. The probability of a SLB is unaffected by the potential failure of a SG tube as the failure of a tube is not an initiator for a SLB event. SLB leakage is limited by leakage flow restrictions resulting from the leakage path above potential cracks through the tube-to-tubesheet crevice. The leak rate during postulated accident conditions has been shown to remain within the accident analysis assumptions for all axial or circumferentially oriented cracks occurring 17 inches below the top of the tubesheet. Since normal operating leakage is limited to 0.10 gallons per minute
(gpm)(or 150 gallons per day (gpd)), the attendant accident condition leak rate, assuming all leakage to be from indications below 17 inches from the top of the tubesheet would be bounded by 0.5 gpm. This value is within the accident analysis assumptions for the limiting design basis accident for Braidwood 2, which is the postulated SLB event. Based on the above, the performance criteria of NEI-97-06, Rev. 2 and RG 1.121 continue to be met and the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
(2)Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed change does not introduce any changes or mechanisms that create the possibility of a new or different kind of accident. Tube bundle integrity is expected to be maintained for all plant conditions upon implementation of the interim alternate repair criteria. The proposed change does not introduce any new equipment or any change to existing equipment. No new effects on existing equipment are created nor are any new malfunctions introduced. Therefore, based on the above evaluation, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
(3)Does the proposed change involve a significant reduction in a margin of safety? Response: No. The proposed change maintains the required structural margins of the steam generator tubes for both normal and accident conditions. NEI 97-06, Rev. 2 and RG 1.121 are used as the basis in the development of the interim alternate repair criteria
(IARC)methodology for determining that steam generator tube integrity considerations are maintained within acceptable limits. RG 1.121 describes a method acceptable to the NRC staff for meeting General Design Criteria 14, 15, 31, and 32 by reducing the probability and consequences of an SGTR. RG 1.121 concludes that by determining the limiting safe conditions of tube wall degradation beyond which tubes with unacceptable cracking, as established by inservice inspection, should be removed from service or repaired, the probability and consequences of a SGTR are reduced. This RG uses safety factors on loads for tube burst that are consistent with the requirements of Section III of the ASME Code. For axially oriented cracking located within the tubesheet, tube burst is precluded due to the presence of the tubesheet. For circumferentially oriented cracking in a tube or the tube-to-tubeshe[e]t weld, the Westinghouse analysis, provided in report “LTR-CDME-08-11 P-Attachment,” defines a length of remaining tube ligament that provides the necessary resistance to tube pullout due to the pressure induced forces (with applicable safety factors applied). Additionally, it is shown that application of the IARC will not result in unacceptable primary-to-secondary leakage during all plant conditions, including transients and postulated accident conditions. Based on the above, it is concluded that the proposed changes do not result in any reduction in a margin of safety. Based on the above, EGC [the licensee] concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c) and, accordingly, a finding of “no significant hazards consideration” is justified. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the **Federal Register** a notice of issuance. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. Written comments may be submitted by mail to the Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this **Federal Register** notice. Written comments may also be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. The filing of requests for hearing and petitions for leave to intervene is discussed below. Within 60 days after the date of publication of this notice, the person(s) may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person(s) whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request via electronic submission through the NRC E-filing system for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's “Rules of Practice for Domestic Licensing Proceedings” in 10 CFR Part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the Commission's PDR, located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/doc-collections/cfr/.* If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements:
(1)The name, address and telephone number of the requestor or petitioner;
(2)the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding;
(3)the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and
(4)the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also identify the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner/requestor shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner/requestor must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner/requestor who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. If a hearing is requested, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment. A request for hearing or a petition for leave to intervene must be filed in accordance with the NRC E-Filing rule, which the NRC promulgated on August 28, 2007 (72 FR 49139). The E-Filing process requires participants to submit and serve documents over the Internet or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek a waiver in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least five
(5)days prior to the filing deadline, the petitioner/requestor must contact the Office of the Secretary by e-mail at *HEARINGDOCKET@NRC.GOV,* or by calling
(301)415-1677, to request
(1)a digital ID certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and/or
(2)creation of an electronic docket for the proceeding (even in instances in which the petitioner/requestor (or its counsel or representative) already holds an NRC-issued digital ID certificate). Each petitioner/requestor will need to download the Workplace Forms Viewer <sup>TM</sup> to access the Electronic Information Exchange (EIE), a component of the E-Filing system. The Workplace Forms Viewer <sup>TM</sup> is free and is available at *http://www.nrc.gov/site-help/e-submittals/install-viewer.html.* Information about applying for a digital ID certificate is available on NRC's public Web site at *http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.* Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format
(PDF)in accordance with NRC guidance available on the NRC public Web site at *http://www.nrc.gov/site-help/e-submittals.html.* A filing is considered complete at the time the filer submits its documents through EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically may seek assistance through the “Contact Us” link located on the NRC Web site at *http://www.nrc.gov/site-help/e-submittals.html* or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is
(800)397-4209 or locally,
(301)415-4737. Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by:
(1)First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or
(2)courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition and/or request should be granted and/or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later than 11:59 p.m. Eastern Time on the due date. Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at *http://ehd.nrc.gov/EHD_Proceeding/home.asp* , unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, Participants are requested not to include copyrighted materials in their submissions. For further details with respect to this license amendment application, see the letter dated February 25, 2008, from the Exelon Generation Company, LLC, which is available for public inspection at the Commission's PDR, located at One White Flint North, File Public Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html.* Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* Dated at Rockville, Maryland, this 4th day of March 2008. For the Nuclear Regulatory Commission. Meghan M. Thorpe-Kavanaugh, Project Manager, Plant Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8-4861 Filed 3-10-08; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 50-354] PSEG Nuclear, LLC; Hope Creek Generating Station Final Environmental Assessment and Finding of No Significant Impact; Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level AGENCY: U.S. Nuclear Regulatory Commission (NRC). SUMMARY: As required by Title 10 of the *Code of Federal Regulations* (10 CFR) Part 51, the NRC has prepared a final Environmental Assessment
(EA)as its evaluation of a request by the PSEG Nuclear, LLC
(PSEG)for a license amendment to increase the maximum thermal power at Hope Creek Generating Station
(HCGS)from 3,339 megawatts-thermal
(MWt)to 3,840 MWt. The EA assesses environmental impacts up to a maximum thermal power level of 3,952 MWt, as the applicant's environmental report was based on that power level. The NRC staff did not identify any significant impact from the information provided in the licensee's EPU application for HCGS or from the NRC staff's independent review. The final EA and Finding of No Significant Impact are being published in the **Federal Register** . The NRC published a draft EA and finding of no significant impact on the proposed action for public comment in the **Federal Register** on October 22, 2007 (72 FR 59563). Two sets of comments were received on the draft EA:
(1)From PSEG Nuclear, LLC by letter dated November 21, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073600851); and
(2)from the State of New Jersey Department of Environmental Protection (NJDEP) by letter dated November 21, 2007 (ADAMS Accession No. ML073600859). These comments are addressed below. Disposition of Public Comments on the Draft Environmental Assessment E *PSEG Comment Number 1:* Modify the Cooling Tower Impacts section to more clearly reflect that NJDEP has issued the Title V Air Operating Permit authorizing emissions at 42 lbs/hr upon approval of the [United States Environmental Protection Agency] USEPA. *NRC Response Number 1:* This comment is a clarification and editorial correction to the draft Environmental Assessment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 2:* Modify the Discharge Impacts section to reflect that the [total dissolved solids] TDS limits are indirectly in the Title V Air Operating Permit and not in the [New Jersey Pollutant Discharge Elimination System] NJPDES Permit. *NRC Response Number 2:* This comment is a clarification and editorial correction to the draft Environmental Assessment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 3:* Modify the Discharge Impacts section to reflect that total suspended solids and [total organic carbon] TOC are not routinely monitored and acute and chronic biological toxicity tests are performed during each NJPDES Permit renewal. *NRC Response Number 3:* This comment is a clarification and editorial correction to the draft Environmental Assessment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 4:* Modify the Impacts on Aquatic Biota section, Table 1, to reflect that Atlantic Croaker are considered to be a single Atlantic coast stock. *NRC Response Number 4:* Upon further review, the NRC agrees with the comment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 5:* Modify the Impacts on Aquatic Biota section to identify inland silversides instead of tidewater silversides. *NRC Response Number 5:* Upon further review, the NRC agrees with the comment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 6:* Modify the Impacts on Aquatic Biota section to reflect the extensive biological monitoring program at the adjacent Salem Generating Station, reflect the potential escape mechanism at the intake based on the low intake velocity, and change “no environmental monitoring” to “no intake aquatic monitoring.” There are extensive environmental monitoring programs in place at HCGS. *NRC Response Number 6:* Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 7:* Modify the Radioactive Waste Stream Impacts section to remove the redundant use of the word “waste.” *NRC Response Number 7:* This comment is an editorial correction to the draft Environmental Assessment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 8:* Modify the Gaseous Radioactive Waste and Offsite Doses section to reflect values in Table 5-3 of PSEG's Environmental Report for EPU. *NRC Response Number 8:* This comment is a clarification correction to the draft Environmental Assessment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 9:* Modify the Offsite Radiation Doses section to reflect the information contained in Section 5.2.1 of PSEG's Environmental Report for EPU. *NRC Response Number 9:* This comment is a clarification correction to the draft EA. Based on this comment, the NRC staff revised the appropriate section of the final EA. *PSEG Comment Number 10:* Modify the Summary section, Table 3, to reflect only those values that were discussed in the main text. *NRC Response Number 10:* This comment is an editorial correction to the draft EA. Based on this comment, the NRC staff revised the appropriate section of the final EA. *NJDEP Comment Number 1:* The proposed modification is subject to the Federal Consistency provisions of the Federal Coastal Zone Management Act (CZMA), and as such, a Federal Consistency determination is required. On July 3, 2007, the NJDEP's Division of Land Use Regulation issued the Federal Consistency certification for the proposed power project. *NRC Response Number 1:* This comment is a clarification correction to the draft Environmental Assessment. Based on this comment, the NRC staff revised the appropriate section of the final EA. *NJDEP Comment Number 2:* The proposed increase in power output would result in a small increase to the temperature of the water being discharged into the Delaware River. Although the discharge is within the limits allowed by the current permit, the [NJDEP's Division of Fish and Wildlife] DFW has concerns over potential impacts to resident and migratory fish species within the area. *NRC Response Number 2:* Blowdown temperature and composition, and Delaware Estuary water temperatures would remain in compliance with the station's NJPDES permit, and the proposed EPU would not result in changes in any other effluents to the estuary. Therefore, the NRC staff concludes that the proposed EPU would result in negligible impacts on the Delaware Estuary from HCGS discharge. Based on this comment, the NRC staff did not revise the final EA. *NJDEP Comment Number 3:* Potential impacts identified by the Draft EA acknowledged that increased evaporation would leave behind more solids in the blowdown, so the concentration of total dissolved solids
(TDS)in the effluent would be an average of about 9 percent higher than under current operations. While this is in compliance with the station's NJPDES permit, the Division has concerns over potential impacts to resident and migratory fish species and shellfish within the area. *NRC Response Number 3:* Blowdown temperature and composition, and Delaware Estuary water temperatures would remain in compliance with the station's NJPDES permit, and the proposed EPU would not result in changes in any other effluents to the estuary. Therefore, the NRC staff concludes that the proposed EPU would result in negligible impacts on the Delaware Estuary from HCGS discharge. Based on this comment, the NRC staff did not revise the final EA. *NJDEP Comment Number 4:* The potential impacts to aquatic biota from the proposed action are primarily due to operation of the cooling water system withdraws. Although no volume and/or velocity changes to the circulating water or service water systems are expected due to the proposed EPU, the DFW continues to be concerned for the destruction of fish and/or shellfish species via intake and discharge of water at this plant. While the identity of species potentially affected by entrainment, impingement, and heat shock may be inferred from ecological information about the Delaware Estuary, the species affected cannot be verified, and the numbers cannot be quantified because no environmental monitoring programs are conducted at the facility. It is expected that a percentage of impinged organisms may likely die, partially due to the fish-return system not functioning continuously to minimize mortality at present. It is expected all organisms entrained at HCGS are probably killed from exposure to heat, mechanical, pressure-related stresses, and/or biocidal treatment before being discharged to the estuary. Although the proposed action would not change the volume or rate of cooling water withdrawn, the DFW has concerns regarding the number of individual fish and shellfish, larvae and eggs destroyed by the plant and any associated temperature rise in the Delaware Estuary. The entrainment kill should be verified to species and quantified in the future to address these concerns. It is anticipated that any new processes that are developed for the other Salem units to increase impingement survivability and decrease entrainment will be employed by this plant as well automatically. *NRC Response Number 4:* Under the proposed EPU, water withdrawal rates would not change from present conditions. Entrainment and impingement impacts may change over time due to changes in the aquatic populations even though HCGS's water withdrawal rate would not change from present conditions. Impacts due to impingement and entrainment losses are minimized because the closed-cycle cooling system at the plant minimizes the amount of cooling water withdrawn from and heated effluent returned to the estuary. The water quality of the effluent (e.g., temperature, toxicity, TDS concentrations) would continue to meet present NJPDES permit conditions for protection of aquatic life. The staff concludes that the proposed EPU would have no significant impact to aquatic biota. Impingment and entrainment effects are regulated by NJDEP under Clean Water Act 316(b), and heat shock is regulated by NJDEP under 316(a) as part of NJPDES permitting. NJPDES permit levels are not part of NRC jurisdiction. Based on this comment, the NRC staff did not revise the final EA. *NJDEP Comment Number 5:* National Marine Fisheries Service
(NMFS)issued a letter dated January 26, 2007, that provided information on the endangered shortnose sturgeon; Atlantic sturgeon, a candidate species for listing; and five species of endangered or threatened sea turtles: Loggerhead, Kemp's ridley, leatherback, green, and hawksbill turtles. The Nuclear Regulatory Commission
(NRC)staff investigated the effects of the HCGS operation on these species and found that the primary concern for these endangered and threatened species is the risk of impingement or entrainment due to cooling water intake by the plant. The HCGS has reported no takes of any of the endangered or threatened species listed above. Although the proposed EPU would not change the intake flow, and, therefore, would not increase impingement and entrainment of these species, the DFW remains concerned regarding potential takes of endangered species. *NRC Response Number 5:* Under the proposed EPU, water withdrawal rates would not change from present conditions. Entrainment and impingement impacts may change over time due to changes in the aquatic populations even though HCGS's water withdrawal rate would not change from present conditions. Impacts due to impingement and entrainment losses are minimized because the closed-cycle cooling system at the plant minimizes the amount of cooling water withdrawn from and heated effluent returned to the estuary. The water quality of the effluent (e.g., temperature, toxicity, TDS concentrations) would continue to meet present NJPDES permit conditions for protection of aquatic life. The staff concludes that the proposed EPU would have no significant impact to aquatic biota. Impingment and entrainment effects are regulated by NJDEP under Clean Water Act 316(b), and heat shock is regulated by NJDEP under 316(a) as part of NJPDES permitting. NJPDES permit levels are not part of NRC jurisdiction. Based on this comment, the NRC staff did not revise the final EA. *NJDEP Comment Number 6:* The EA notes that an Essential Fish Habitat
(EFH)for the proposed EPU was sent to the National Marine Fisheries Service
(NMFS)under separate cover to initiate an EFH consultation. We recommend that the NRC should issue no final decision on this proposal until NMFS consultations are concluded. *NRC Response Number 6:* The staff agrees with this comment. By letter dated July 13, 2007 (ADAMS Accession No. ML072000450), NMFS found the EFH assessment satisfactory. Based on this comment, the NRC staff revised the appropriate section of the final EA. *NJDEP Comment Number 7:* No impacts are expected to avian species. *NRC Response Number 7:* The staff agrees with this comment; however, no changes to the final EA are warranted. *NJDEP Comment Number 8:* According to the EA, no changes to the Hope Creek Generating Station circulating water or service water systems are expected due to the proposed EPU; therefore, the proposed EPU would not increase the amount of water withdrawn from or discharged to the Delaware Estuary. As a result, the intake issue appears to be unaffected by the power re-rating. *NRC Response Number 8:* The staff agrees with this comment; however, no changes to the final EA are warranted. *NJDEP Comment Number 9:* This Bureau has determined that because the permittee is willing to comply with its current discharge limits, the regulation of the discharge via NJPDES appears to be unaffected by the power re-rating. In the current NJPDES permit, there is no effluent flow limit and there is no total dissolved solids
(TDS)requirement since the facility discharges to saline waters. This is due to the fact that there are currently no New Jersey Surface Water Quality Standards for TDS. Through the administering of the NJPDES program, this Bureau will continue to require effluent characterization of the cooling tower blowdown to monitor any changes to the toxic pollutants that may or may not occur due to the proposed EPU. *NRC Response Number 9:* The staff agrees with this comment; however, no changes to the final EA are warranted. *NJDEP Comment Number 10:* The information contained in the EA indicates that the power output of the reactor will increase approximately 15-percent. It can be concluded that this power increase will raise magnetic field emissions from the lines and therefore, elevate magnetic fields along the right-of-way. These changes will increase the magnetic field exposure of the population living closer than 400 feet from the center of the transmission line configuration. At this point in time, the consensus among the scientific community is that there is inconclusive evidence to suggest that long-term exposure to magnetic fields from power lines would result in adverse health outcomes. However, for new or modified lines, many health-based organizations are still recommending reducing magnetic fields if low or no-cost options exist. In a June 2007 fact sheet put forth from the World Health Organization (WHO Fact sheet No. 322), the following guidance is issued: “When constructing new facilities and designing new equipment low-cost ways of reducing exposures may be explored.” Therefore, in light of such uncertainty, if there are any changes that will be made to the power delivery system that would lower the magnetic fields from the power lines, it may be prudent to explore such options. *NRC Response Number 10:* The proposed EPU does not require the modification or building of new transmission lines. Therefore, the guidance in WHO Fact Sheet No. 322 is not applicable. There is no scientific consensus regarding the health effects of electromagnetic fields
(EMFs)produced by operating transmission lines. Therefore, the licensee did not quantify the chronic effects of EMF on human and biota. The potential for chronic effects for these fields continues to be studied and is not known at this time. The National Institute of *Environmental Health* Sciences (NIEHS) directs related research through the U.S Department of Energy (DOE). A 2003 NIEHS study published in *Environmental Health* Perspectives, Volume 111, Number 3, March 2003, titled “Power-Line Frequency Electromagnetic Fields Do Not Induce Changes in Phosphorylation, Localization, or Expression of the 27-Kilodalton Heat Shock Protein in Human Keratinocytes” by Biao Shi, Behnom Farboud, Richard Nuccitelli, and R. Rivkah Isseroff of the University of California—Davis contains the following conclusion: ”The linkage of the exposure to the power-line frequency (50-60 Hz) electromagnetic fields
(EMF)with human cancers remains controversial after more than 10 years of study. The *in vitro* studies on the adverse effects of EMF on human cells have not yielded a clear conclusion. In this study, we investigated whether power-line frequency EMF could act as an environmental insult to invoke stress responses in human keratinocytes using the 27-kDa heat shock protein (HSP27) as a stress marker. After exposure to 1 gauss (100 μT) EMF from 20 min to 24 hr, the isoform pattern of HSP27 in keratinocytes remained unchanged, suggesting that EMF did not induce the phosphorylation of this stress protein. EMF exposure also failed to induce the translocation of HSP27 from the cytoplasm to the nucleus. Moreover, EMF exposure did not increase the abundance of HSP27 in keratinocytes. In addition, we found no evidence that EMF exposure enhanced the level of the 70-kDa heat shock protein (HSP70) in breast or leukemia cells as reported previously. Therefore, in this study we did not detect any of a number of stress responses in human keratinocytes exposed to power-line frequency EMF.” To date, there is not sufficient data to cause the NRC staff to change its position with respect to the chronic effects of electromagnetic fields. If in the future, the NRC staff finds that, contrary to current indications, a consensus has been reached by appropriate Federal health agencies that there are adverse health effects from electromagnetic fields, the NRC staff will recommend to the Commission to change its current position regarding EMF. The NRC staff did not revise the final EA based on this comment. *NJDEP Comment Number 11:* The NJDEP's Air Quality Permitting Office approved the Title V air permit modification for this project on August 7, 2007. This approval along with a request for a single source state implementation plan
(SIP)for a variance to Subchapter 6 was sent to the Environmental Protection Agency
(EPA)on November 2, 2007. The Air Quality Permitting Office has not yet received a response from the EPA. *NRC Response Number 11:* The staff agrees with this comment; however, no changes to the final EA are warranted. Environmental Assessment Plant Site and Environs HCGS is located on the southern part of Artificial Island, on the east bank of the Delaware River, in Lower Alloways Creek Township, Salem County, New Jersey. While called Artificial Island, the site is actually connected to the mainland of New Jersey by a strip of tideland, formed by hydraulic fill from dredging operations on the Delaware River by the U.S. Army Corps of Engineers. The site is 15 miles south of the Delaware Memorial Bridge, 18 miles south of Wilmington, Delaware, 30 miles southwest of Philadelphia, Pennsylvania, and 7.5 miles southwest of Salem, New Jersey. The station is located on a 300-acre site. The site is located in the southern region of the Delaware River Valley, which is defined as the area immediately adjacent to the Delaware River and extending from Trenton to Cape May Point, New Jersey, on the eastern side, and from Morrisville, Pennsylvania, to Lewes, Delaware, on the western side. This region is characterized by extensive tidal marshlands and low-lying meadowlands. Most land in this area is undeveloped. A great deal of land adjacent to the Delaware River, near the site, is public land, owned by the Federal and State governments. The main access to the plant is from a road constructed by PSEG. This road connects with Alloways Creek Neck Road, about 2.5 miles, east of the site. Access to the plant site and all activities thereon are under the control of PSEG. Identification of the Proposed Action HCGS is a single unit plant that employs a General Electric BWR that was designed to operate at a rated core thermal power of 3,339 MWt, at 100-percent steam flow, with a turbine-generated rating of approximately 1,139 megawatts-electric (MWe). In 1984, NRC issued operating license NPF-57 to HCGS, authorizing operation up to a maximum power level of 3,293 MWt. In 2001, NRC authorized a license amendment for a 1.4 percent power uprate from 3,293 MWt to 3,339 MWt and issued an Environmental Assessment and Finding of No Significant Impact for Increase in Allowable Thermal Power Level (NRC 2001). By letter dated September 18, 2006, PSEG proposed an amendment to the operating license for HCGS, to increase the maximum thermal power level by approximately 15 percent, from 3,339 MWt to 3,840 MWt. The change is considered an EPU because it would raise the reactor core power levels more than 7 percent above the originally licensed maximum power level. The Need for the Proposed Action PSEG
(2005)evaluated the need for additional electrical generation capacity in its service area for the planning period of 2002-2011. Information provided by the North American Electric Reliability Council showed that, in order to meet projected demands, generating capacity must be increased by at least 2 percent per year for the Mid-Atlantic Area Council and the PJM Interconnection, LLC (PSEG 2005). Such demand increase would exceed PSEG's capacity to generate electricity for its customers. PSEG determined that a combination of increased power generation and purchase of power from the electrical grid would be needed to meet the projected demands. Increasing the generating capacity at HCGS was estimated to provide lower-cost power than can be purchased on the current and projected energy market. In addition, increasing nuclear generating capacity would lessen the need to depend on fossil fuel alternatives that are subject to unpredictable cost fluctuations and increasing environmental costs. Environmental Impacts of the Proposed Action This EA summarizes the non-radiological and radiological impacts that may result from the proposed action. Non-Radiological Impacts Land Use Impacts The potential impacts associated with land use (including aesthetics and historic and archaeological resources) include impacts from construction and plant modifications at HCGS. While some plant components would be modified, most plant changes related to the proposed EPU would occur within existing structures, buildings, and fenced equipment yards housing major components within the developed part of the site. No new construction would occur, and no expansion of buildings, roads, parking lots, equipment storage areas, or transmission facilities would be required to support the proposed EPU (PSEG 2005). Existing parking lots, road access, offices, workshops, warehouses, and restrooms would be used during construction and plant modifications. Therefore, land use would not change at HCGS. In addition, there would be no land use changes along transmission lines (no new lines would be required for the proposed EPU), transmission corridors, switchyards, or substations. Because land use conditions would not change at HCGS and because any disturbance would occur within previously disturbed areas, there would be no impact to aesthetic resources and historic and archeological resources in the vicinity of HCGS (PSEG 2005). The Coastal Zone Management Act
(CZMA)was promulgated to encourage and assist States and territories in developing management programs that preserve, protect, develop, and, where possible, restore the resources of the coastal zone. A “coastal zone” is generally described as the coastal waters and the adjacent shore lands strongly influenced by each other. This includes islands, transitional and intertidal areas, salt marshes, wetlands, beaches, and Great Lakes waters. Activities of Federal agencies that are reasonably likely to affect coastal zones shall be consistent with the approved coastal management program
(CMP)of the State or territory to the maximum extent practical. The CZMA provisions apply to all actions requiring Federal approval (new plant licenses, license renewals, materials licenses, and major amendments to existing licenses) that affect the coastal zone in a State or territory with a Federally approved CMP. The proposed EPU is subject to the Federal Consistency provisions of the Federal Coastal Zone Management Act (CZMA), and as such, a Federal Consistency determination is required. On April 23, 2007, PSEG submitted an application requesting the State of New Jersey to perform the Federal Consistency determination in accordance with CZMA. On July 3, 2007, the New Jersey Department of Environmental Protection (NJDEP) Land Use Regulation Program, acting under Section 307 of the Federal Coastal Management Act, issued the Federal Consistency certification for the proposed EPU. The impacts of continued operation of HCGS under EPU conditions are bounded by the evaluation in the FES for operation (NRC 1984). Therefore, the potential impacts to land use, aesthetics, and historic and archaeological resources from the proposed EPU would not be significant. Cooling Tower Impacts HCGS has one natural draft cooling tower that is currently used to reduce the heat output to the environment. The potential impacts associated with cooling tower operation under the proposed EPU could affect aesthetics, salt drift deposition, noise, fogging or icing, wildlife, and particulate emissions. The proposed EPU would not result in significant changes to aesthetics such as cooling tower plume dimension at HCGS. Atmospheric emissions from the natural draft cooling tower consist primarily of waste heat and water vapor resulting in persistent cloudlike plumes. The size of the cooling tower plume depends on the meteorological conditions such as temperature, dew point, and relative humidity. For the proposed EPU, NRC does not anticipate any change in the dimension of the plume under equivalent meteorological conditions as evaluated in the FES. Therefore, the NRC staff concludes that there would be no significant aesthetic impacts associated with HCGS cooling tower operation for the proposed action. Native, exotic, and agricultural plant productivity may be adversely affected by the increased salt concentration in the drift deposited directly on soils or directly on foliage. FES has indicated that the salt drift deposition must be above 90 lbs/acre/year before agriculture plant productivity would be reduced. PSEG has estimated that the proposed EPU would not significantly increase the rate of salt drift deposition from the increase in cooling tower operation. PSEG has estimated that the increase in salt drift deposition rate would be 9 percent to a maximum of 0.109 lbs/acre/year. Therefore, the NRC staff concludes that there would be no significant salt drift deposition impacts associated with HCGS cooling tower operation for the proposed action. Because the HCGS cooling tower is natural draft, no increase in noise is expected. Therefore, the NRC staff concludes that there would be no significant noise impacts associated with HCGS cooling tower operation for the proposed action. PSEG has indicated that there would be no significant increase in fogging or icing expected for the proposed EPU. Increased ground-level fogging and icing resulting from water droplets in the cooling tower drift may interfere with highway traffic. The 1984 FES evaluated the impacts of fogging and icing associated with the operation of the natural draft cooling tower at HCGS and found these impacts to be insignificant and inconsequential. The fact that the nearest agricultural or residential land is located several miles from the site further minimizes the potential for impact. Therefore, the NRC staff concludes that there would be no significant fogging or icing impacts associated with HCGS cooling tower operation for the proposed action. The 1984 FES has stated that although some birds may collide with cooling tower, unpublished surveys at existing cooling towers indicated that the number would be relatively small. The proposed EPU would not increase the risk of wildlife colliding with cooling tower. Therefore, the NRC staff concludes that there would be no significant wildlife impacts associated with HCGS cooling tower operation for the proposed action. The proposed EPU would increase the particulates emission rate from the HCGS cooling tower, from the current permitted rate of 29.4 pounds per hour (lbs/hr) to a rate of 35.6 lbs/hr (maximum 42.0 lbs/hr). Particulates (primarily salts) from the cooling tower have an aerodynamic particle size of less than 10 microns in diameter (PM10). The NJDEP has imposed a maximum hourly emission rate for particulates at 30 lbs/hr. Therefore, the projected particulate emission rate from the HCGS cooling tower, due to the proposed EPU, could exceed the NJDEP emission regulatory limit. On March 30, 2007, NJDEP issued a Public Notice and Draft Title V Air Operating Permit for the HCGS cooling tower, proposing to authorize a variance to the HCGS air operating permit with an hourly emission rate of 42 lbs/hr (NJDEP 2007a). On June 13, 2007, NJDEP issued the final Title V Air Operating Permit for HCGS allowing a 42 lbs/hr particulate emission rate for the proposed EPU upon approval of the State Implementation Plan by USEPA. Since particulates from HCGS cooling tower consist primarily of salts with particle size of less than 10 microns, the FES evaluated the environmental impacts on air quality and found the impacts to be minor. Furthermore, a prevention of significant deterioration
(PSD)non-applicability analysis was submitted to the U.S. Environmental Protection Agency
(EPA)Region 2, by PSEG on March 4, 2004. Based on the information provided by PSEG, EPA concluded that the EPU project would not result in a significant increase in emissions and would not be subject to PSD review (ML071240216). In addition, NJDEP has stated that the Bureau of Technical Services reviewed the Air Quality Modeling for the proposed Hope Creek uprate project and determined that the project would meet the National Ambient Air Quality Standards and the New Jersey Ambient Air Quality Standards. Therefore, the NRC staff concludes that there would be no significant particulate emission impacts associated with HCGS cooling tower operation for the proposed action. Transmission Facility Impacts The potential impacts associated with transmission facilities include changes in transmission line right-of-way
(ROW)maintenance and electric shock hazards due to increased current. The proposed EPU would not require any physical modifications to the transmission lines. PSEG's transmission line ROW maintenance practices, including the management of vegetation growth, would not change. PSEG did not provide an estimate of the increase in the operating voltage due to the EPU. Based on experience from EPUs at other plants, the NRC staff concludes that the increase in the operating voltage would be negligible. Because the voltage would not change significantly, there would be no significant change in the potential for electric shock. Modifications to onsite transmission equipment are necessary to support the EPU; such changes include replacement of the high- and low-pressure turbines, and the replacement of the main transformer (PSEG 2005). No long-term environmental impacts from these replacements are anticipated. The proposed EPU would increase the current, which would affect the electromagnetic field. The National Electric Safety Code
(NESC)provides design criteria that limit hazards from steady-state currents. The NESC limits the short-circuit current to the ground to less than 5 milliamperes. The transmission lines meet the applicable shock prevention provision of the NESC. Therefore, even with the slight increase in current attributable to the EPU, adequate protection is provided against hazards from electrical shock. There would be an increase in current passing through the transmission lines associated with the increased power level of the proposed EPU. The increased electrical current passing through the transmission lines would cause an increase in electromagnetic field strength. However, there is no scientific consensus regarding the health effects of electromagnetic fields
(EMFs)produced by operating transmission lines. Therefore, the licensee did not quantify the chronic effects of EMF on human and biota. The potential for chronic effects for these fields continues to be studied and is not known at this time. The National Institute of Environmental Health Sciences (NIEHS) directs related research through the U.S. Department of Energy (DOE). A 2003 NIEHS study published in *Environmental Health* Perspectives, Volume 111, Number 3, March 2003, titled “Power-Line Frequency Electromagnetic Fields Do Not Induce Changes in Phosphorylation, Localization, or Expression of the 27-Kilodalton Heat Shock Protein in Human Keratinocytes” by Biao Shi, Behnom Farboud, Richard Nuccitelli, and R. Rivkah Isseroff of the University of California—Davis contains the following conclusion: “The linkage of the exposure to the power-line frequency (50-60 Hz) electromagnetic fields
(EMF)with human cancers remains controversial after more than 10 years of study. The in vitro studies on the adverse effects of EMF on human cells have not yielded a clear conclusion. In this study, we investigated whether power-line frequency EMF could act as an environmental insult to invoke stress responses in human keratinocytes using the 27-kDa heat shock protein (HSP27) as a stress marker. After exposure to 1 gauss (100 μT) EMF from 20 min to 24 hr, the isoform pattern of HSP27 in keratinocytes remained unchanged, suggesting that EMF did not induce the phosphorylation of this stress protein. EMF exposure also failed to induce the translocation of HSP27 from the cytoplasm to the nucleus. Moreover, EMF exposure did not increase the abundance of HSP27 in keratinocytes. In addition, we found no evidence that EMF exposure enhanced the level of the 70-kDa heat shock protein (HSP70) in breast or leukemia cells as reported previously. Therefore, in this study we did not detect any of a number of stress responses in human keratinocytes exposed to power-line frequency EMF.” To date, there is not sufficient data to cause the NRC staff to change its position with respect to the chronic effects of electromagnetic fields. If in the future, the NRC staff finds that, contrary to current indications, a consensus has been reached by appropriate Federal health agencies that there are adverse health effects from electromagnetic fields, the NRC staff will recommend to the Commission to change its current position regard EMF. The 1984 FES evaluated bird mortality resulting from collision with towers and conductors. The FES has estimated that only 0.07 percent of the mortality of waterfowls from causes other than hunting resulted from collision with towers and conductors at HCGS. Because the proposed EPU does not require physical modifications to the transmission line system, the additional impacts of bird mortality would be minimal. The impacts associated with transmission facilities for the proposed action would not change significantly relative to the impacts from current plant operation. There would be no physical modifications to the transmission lines, transmission line ROW maintenance practices would not change, there would be no changes to transmission line ROW or vertical ground clearances, and electric current passing through the transmission lines would increase only slightly. Therefore, the NRC staff concludes there would be no significant impacts associated with transmission facilities for the proposed action. Water Use Impacts Potential water use impacts from the proposed EPU include localized effects on the Delaware Estuary and changes to plant water supply. HCGS is located on the eastern shore of the Delaware Estuary. The estuary is approximately 2.5 miles wide, and the tidal flow past HCGS is approximately 259,000 million gallons per day
(MGD)(NRC 2001). The Delaware Estuary is the source of cooling water for the HCGS circulating water system, a closed-cycle system that utilizes a natural draft cooling tower. During normal plant operations, water usage at HCGS accounts for less than 0.03 percent of the average tidal flow of the Delaware Estuary (PSEG 2005). HCGS's service water system withdraws approximately 67 MGD from the Delaware Estuary for cooling and makeup water. When estuary water temperature is less than 70 degrees Fahrenheit (°F), two pumps operate to supply an average service water flow rate of approximately 37,000 gallons per minute (gpm). When estuary water temperature is greater than 70 °F, three pumps operate to supply an average service water flow rate of approximately 52,000 gpm (Najarian Associates 2004). Estuary water is delivered to the cooling tower basin and acts primarily as makeup water to the circulating water system—replacing 47 MGD that are returned to the estuary as cooling tower blowdown, and depending upon meteorological conditions and the circulating water flow rate, replacing approximately 10-13 MGD of cooling water that are lost through evaporation from the cooling tower. Approximately 7 MGD of the 67 MGD are used for intake screen wash water and strainer backwash. The circulating water system has an operating capacity of 11 million gallons; however, approximately 9 million gallons of water actually reside in the circulating water system at any given time. Water is re-circulated through the condensers at a rate of approximately 550,000 gpm (PSEG 2005). No changes to the HCGS circulating water or service water systems are expected due to the proposed EPU; therefore, the proposed EPU would not increase the amount of water withdrawn from or discharged to the Delaware Estuary. Consumptive use of surface water by HCGS is not expected to change substantively as a result of the proposed EPU and is regulated by the Delaware River Basin Commission
(DRBC)through a water use contract. The proposed EPU would likely result in a small increase in cooling tower blowdown temperature. To mitigate this temperature increase, PSEG has modified its cooling tower to improve its thermal performance, and as discussed in the following section, thermal discharge to the Delaware Estuary would remain within the regulatory limits set by the New Jersey Pollutant Discharge Elimination System (NJPDES) permit granted to HCGS by NJDEP (PSEG2005; NJDEP 2002). Two groundwater wells access the Raritan aquifer to provide domestic and process water to HCGS. The wells are permitted by NJDEP and are also regulated by DRBC. The proposed EPU would not increase the use of groundwater by HCGS or change the limits of groundwater use currently set by DRBC (PSEG 2005). As such, the conclusions in the 1984 FES regarding groundwater use at HCGS would remain valid for the proposed EPU. The proposed EPU would not increase the amount of surface water withdrawn from the Delaware Estuary and groundwater use at HCGS would not increase. Therefore, the NRC staff concludes the proposed EPU would have negligible water use impacts on the estuary. Discharge Impacts Potential impacts to a water body from power plant discharge include increased turbidity, scouring, erosion, sedimentation, contamination, and water temperature. The proposed EPU would not increase the amount of cooling tower blowdown discharged to the Delaware Estuary; therefore, the turbidity, scouring, erosion, and sedimentation would not be expected to significantly change. Additionally, the proposed EPU would not introduce any new contaminants to the Delaware Estuary and would not significantly increase any potential contaminants that are presently regulated by the station's NJPDES permit. The concentration of total dissolved solids
(TDS)in the cooling tower blowdown would increase due to the increased rate of evaporation; however, the amount of blowdown discharged to the estuary would decrease, and the concentration of TDS would remain within the station's air permit limits. Although the amount of water withdrawn from the Delaware Estuary would remain unchanged, the proposed EPU would result in a slight increase in the temperature of the cooling tower blowdown discharged to the estuary. The station's NJPDES permit imposes limits on the temperature of the blowdown and the amount of heat rejected to the estuary by the HCGS circulating water system. The NJDES permit specifies that the 24-hour average maximum blowdown temperature is limited to 97.1 °F, and heat rejection is limited to 662 million British thermal units per hour (MBTU/hr) from September 1 through May 31 and 534 MBTU/hr from June 1 through August 31. DRBC also imposes thermal regulations on HCGS through the NJPDES permit, specifying that the net temperature increase of the Delaware Estuary may not exceed 4 °F from September through May, and 1.5 °F from June through August or estuary water temperature may not exceed a maximum of 86 °F, whichever is less. These limitations apply to waters outside of the heat dissipation area, which extends 2,500 feet upstream and downstream of the discharge point and 1,500 feet offshore from the discharge point. The licensee has performed hydrothermal modeling analysis for the HCGS EPU and concluded that the plant would continue to meet the requirements of the NJPDES permit. The 1984 FES concluded that the station's shoreline discharge would not adversely affect the estuary because of its large tidal influence, which would dilute, mix, and rapidly dissipate the heated effluent (PSEG 2005). Hydrothermal modeling conducted for the proposed EPU determined that, even during extreme meteorological conditions, the post-EPU increase in cooling tower blowdown temperature would not exceed 91.7 °F, and the station would continue to comply with all applicable Delaware Estuary water quality standards set by the station's NJPDES permit and DRBC (Najarian Associates 2004). In addition to setting thermal discharge limits, the NJPDES permit also regulates all surface and wastewater discharges from the station. The NJPDES permit, effective March 1, 2003, regulates discharge from six outfalls at HCGS, including the cooling tower blowdown, low volume oily wastewater, stormwater, and sewage treatment; these discharges ultimately flow to the Delaware Estuary. As required by the NJPDES permit, in addition to temperature, cooling tower blowdown is monitored for flow, pH, chlorine produced oxidants (CPOs), and total organic carbon. HCGS operates a dechlorination system that utilizes ammonium bisulfate to reduce CPOs in the blowdown. Furthermore, acute and chronic biological toxicity tests were routinely performed on cooling tower blowdown from 1998 through 2001 and are performed at each NJDES Permit renewal to comply with NJDEP non-toxicity regulations (PSEG 2005). The NJPDES permit sets monitoring, sampling, and reporting requirements for all HCGS discharges. The NRC staff performed a search of the NJDEP *Open Public Records Act Datamine* online database which revealed no water quality violations for HCGS (NJDEP 2007). With the exception of increased blowdown temperature and TDS concentration, as discussed above, the proposed EPU would not be expected to alter the composition or volume of any other effluents, including stormwater drainage, oily water, and sewage treatment (PSEG 2005). Blowdown temperature and composition, and Delaware Estuary water temperatures would remain in compliance with the station's NJPDES permit, and the proposed EPU would not result in changes in any other effluents to the estuary. Therefore, the NRC staff concludes that the proposed EPU would result in negligible impacts on the Delaware Estuary from HCGS discharge. Impacts on Aquatic Biota The potential impacts to aquatic biota from the proposed action are primarily due to operation of the cooling water system and to maintain the transmission line ROWs. Cooling water withdrawal affects aquatic populations through impingement of larger individuals (e.g., fish, some crustaceans, turtles) on the intake trash bars and debris screens and entrainment of smaller organisms that pass through the screens into the cooling water system. The proposed action would not change the volume or rate of cooling water withdrawn. Most of the additional heat generated under the proposed EPU would be dissipated by the cooling tower, and PSEG proposes no changes to the cooling water system. Discharge of heated effluent alters natural thermal and current regimes and can induce thermal shock in aquatic organisms. The HCGS effluent would change under the proposed EPU. Because the volume of makeup water withdrawn from the estuary would remain unchanged and the volume of evaporative loss from the cooling tower would increase, the volume of the blowdown released as effluent, which is the difference between the water withdrawn and the water lost to evaporation, would decrease. The increased evaporation would leave behind more solids in the blowdown, so the concentration of TDS in the effluent would be an average of about 9 percent higher than under current operations (Najarian Associates 2004). The effluent would also be somewhat warmer, but modeling predicts that all present NJPDES permit conditions for the effluent would still be met (Najarian Associates 2004). PSEG proposes no new transmission line ROWs and no change in current maintenance procedures for transmission line ROWs under the proposed EPU, so this potential source of impact will not be considered further for aquatic resources. The potential receptors of the environmental stressors of impingement, entrainment, and heat shock are the aquatic communities in the Delaware Estuary near HCGS. Ecologists typically divide such communities into the following categories for convenience when considering ecological impacts of power plants: microbes, phytoplankton, submerged aquatic vegetation, invertebrate zooplankton, benthic invertebrates, fish, and sometimes birds, reptiles (e.g., sea turtles), and marine mammals. Of these, effects of power plant operation have been consistently demonstrated only for fish. Unless otherwise noted, the following information on Delaware Estuary fish and blue crab ( *Callinectes sapidus* ) is from information summarized in the 2006 Salem NJPDES Permit Application (NJDEP 2006). Salem is an adjacent nuclear power plant that has conducted several large studies in support of permitting of its once-through cooling water system. About 200 species of fish have been reported from the Delaware Estuary. Some are resident, some are seasonal migrants, and some are occasional strays. In its NJPDES Permit Application, PSEG selected 11 species, one invertebrate and ten fish, as species representative of the aquatic community (Table 1). Table 1.—Species Representative of the Delaware Estuary Aquatic Community Near Artificial Island Common name Scientific name Comment Blue Crab *Callinectes sapidus* Swimming crab, abundant in the estuary. Recreational and commercial species. Alewife *Alosa pseudoharengus* Anadromous herring; abundant in the estuary. American Shad *Alosa sapidissima* Anadromous herring; abundant in the estuary. Recreational and commercial species. Atlantic Croaker *Micropogonias undulatus* Drum family. Atlantic coast population is considered a single stock. Recreational and commercial species. Atlantic Menhaden *Brevoortia tyrannus* Herring. Larvae and juveniles use the estuary as a nursery. Commercial species. Atlantic Silverside *Menidia menidia* Resident in intertidal marsh creeks and shore zones. Bay Anchovy *Anchoa mitchelli* Common in the bay and tidal river zones. Blueback Herring *Alosa aestivalis* Anadromous herring; abundant in the estuary. Spot *Leiostomus xanthurus* Drum family. Juveniles use the estuary as a nursery. Recreational and commercial species. Striped Bass *Morone saxatilis* Anadromous temperate bass. Recreational and commercial species. Weakfish *Cynoscion regalis* Drum family. Larvae and juveniles use the estuary as nursery. Recreational and commercial species. White Perch *Morone americana* Temperate bass. Year-round residents anadromous within estuary. Recreational species. Source: NJDEP 2006. HCGS is located in the Delaware Estuary between the Delaware River upstream and the wide Delaware Bay downstream. Estuaries are drowned river valleys where fresh water from rivers mixes with the higher salinity water of the ocean and bays. In estuaries, salinity and water temperature may change with season, tides, and meteorological conditions. Typically, few species are resident in an estuary all of their lives, perhaps because surviving the wide variations in salinity and temperature poses physiological challenges to fish and invertebrates. The predominant resident fish species in the Delaware Estuary are hogchoker ( *Trinectes maculatus* ), white perch ( *Morone americana* ), bay anchovy ( *Anchoa mitchelli* ), Atlantic and inland silversides ( *Menidia menidia* and *M. beryllina* , respectively), naked goby ( *Gobiosoma bosc* ), and mummichog ( *Fundulus heteroclitus* ). Resident fish species are represented by Atlantic silversides, bay anchovy, and white perch (Table 1). Atlantic silversides are relatively small common fish that inhabit intertidal creeks and shore zones. They mature in less than a year and seldom live beyond 2 years. Although there may be no discernable long-term trend in abundance in the Delaware Estuary, the short-term trend appears to be decreasing abundance. Bay anchovy may be the most abundant species in the estuary. This small fish overwinters in deep areas of the lower estuary and near-shore coastal zone. Though bay anchovies tend to stay in the lower part of the estuary, they stray as far north as Trenton. They tend to mature in the summer following their birth. Typically two spawning peaks occur, one in late May and one in mid-July, although some spawning occurs all summer. Most spawning occurs where salinity exceeds 20 parts per thousand (ppt), but some spawning may occur throughout the estuary. Although no long-term trend in abundance is evident, abundance since the mid-1990s appears to be declining. White perch are found throughout the brackish portions of the estuary. They are anadromous within the estuary (“semi-anadromous”), meaning that they undergo a seasonal migration from the deeper, more saline areas where they overwinter in fresh, shallow waters in the spring to spawn and then return to more brackish waters. They typically mature in 2 to 3 years. The abundance of white perch in the Delaware Estuary appears to be stable or increasing, possibly in response to long-term improvements in water quality. Adult blue crabs are resident macro-invertebrates in the Delaware Estuary, although their larvae are not. After mating in shallow brackish areas of the upper estuary in spring, adult females migrate to the mouth of the bay. The eggs, which are extruded and carried on the undersides of females, hatch typically in the warm (77-86 °F), high salinity (18-26 ppt) waters of the lower bay in summer. After hatching, the larvae pass through seven planktonic stages, called zoeae, and move offshore with near-shore surface currents. The first post-larval stage, called a megalops, uses wind-driven currents and tides to move inshore. They then metamorphose to the first crab stage and move up the estuary. Adult male crabs do not migrate from the upper estuary. Crabs typically mature when 1 or 2 years old. Between 1980 and 2004, blue crab abundance in the Delaware Estuary appears to have increased. Anadromous species live their adult lives at sea and migrate into fresh water to spawn. The most common anadromous fish species in the Delaware Estuary are alewife ( *Alosa pseudoharengus* ), American shad ( *A. sapidissima* ), blueback herring ( *A. aestivalis* ), and striped bass ( *Morone saxatilis* ), of which the first three are members of the herring family. The endangered shortnose sturgeon ( *Acipenser brevirostrum* ) is also anadromous. The ecology of the three herrings is similar, as is their appearance. All use the estuary as spawning and nursery habitat. All migrate to fresh water in the spring and are believed to return to their natal streams to spawn. The newly hatched larvae are planktonic and move downstream with the current. Juveniles remain in freshwater nursery areas throughout the summer and migrate to sea in the fall. They then remain at sea until maturity and migrate along the coast. Alewife have become more abundant since 1980, although the trend since 1990 is unclear. Abundance of American shad in the Delaware Estuary drastically declined in the early 1900s due to poor water quality, dam construction, over-fishing, and habitat destruction. American shad began to recover in the 1960s and 1980s and appears to be recovering still. No trends are evident in blueback herring abundance. Striped bass is a fairly large member of the temperate bass family, which also includes white perch. Adult striped bass, which may reach weights of over 100 pounds, migrate up the estuary to fresh and brackish waters in the spring to spawn and are believed to return to their natal rivers and streams for spawning. The newly hatched larvae are planktonic and move downstream with the current. Small juveniles use fresh and brackish areas as nurseries, and larger juveniles use the higher salinity waters of the lower estuary as feeding grounds. Adult striped bass live at sea and the lower estuary and migrate along the coast. Like American shad, the striped bass population in the Delaware Estuary declined prior to the 1980s but is now recovering. The most common marine species that use the estuary include weakfish ( *Cynoscion regalis* ), spot ( *Leiostomus xanthurus* ), Atlantic croaker ( *Micropogonias undulatus* ), bluefish *(Pomatomus saltatrix* ), summer flounder ( *Paralichthys dentatas* ), and Atlantic menhaden ( *Brevoortia tyrannus* ). Four of these, weakfish, spot, Atlantic croaker, and Atlantic menhaden, are shown as representative in Table 1. Atlantic croaker, spot, and weakfish are members of the drum family. Adult Atlantic croaker inhabit the deep, open areas of the lower bay from late spring through mid-fall. They spawn from July through April along the continental shelf. Larval Atlantic croaker first move with the currents and later move to the shallow areas of the bay. Juveniles use the shallow areas and tidal creeks in fresh and brackish water as nurseries, but move into deeper water during colder periods. They mature at about 2 to 4 years of age. Abundance of Atlantic croaker in the Delaware Estuary has been increasing since the early 1990s. Spot spawn over the continental shelf from late September through April. Larvae live in the ocean then move to the Bay. The young juveniles move upstream into tidal creeks and tributaries with low salinity. Like Atlantic croaker, spot move into deeper water during colder periods. Spot mature at 1 to 3 years old. Abundance of spot appears to be negatively related to the abundance of Atlantic croaker and has been decreasing. Weakfish spawn in the mouth of Delaware Bay in mid-May through mid-September, and after hatching, the larvae move up into the estuary to nursery areas of lower salinity (3 to 15 ppt). In mid-to-late summer they move south to mesohaline nursery grounds, and as temperatures decline in fall, the juveniles move south from the nursery areas to the continental shelf and south. They mature at an age of one or two years. Abundance of weakfish in the Delaware Estuary appear to have increased from the 1970s to 1990s and then declined. Atlantic menhaden is a pelagic species that overwinters on the shelf, and large numbers overwinter off Cape Hatteras, North Carolina. The population moves north along the coast in the spring and south in the fall. The populations spawns all year, and peak spawning occurs off the Delaware Bay in spring and fall. The larvae move by wind-driven currents into estuarine nursery grounds, where they transform to juveniles and move upstream to oligohaline waters and then move out the estuary with falling temperatures. In the fall, they congregate into dense schools and move out of the estuary and south along the coast. Atlantic menhaden mature at about age two. No trend in abundance in the Delaware Estuary is apparent. While the identity of species potentially affected by entrainment, impingement, and heat shock may be inferred from ecological information about the Delaware Estuary and the adjacent Salem Generating Station, the species affected cannot be verified, and the numbers cannot be quantified because no intake aquatic monitoring programs are conducted at the HCGS. Impinged organisms may die, and the fish-return system does not function continuously to minimize mortality, but the intake velocity should allow most to escape the plant. All organisms entrained at HCGS, which operates a cooling tower, are probably killed from exposure to heat, mechanical, pressure-related stresses, and possibly biocidal chemicals before being discharged to the estuary. Under the proposed EPU, water withdrawal rates would not change from present conditions. Entrainment and impingement impacts may change over time due to changes in the aquatic populations even though HCGS(s water withdrawal rate would not change from present conditions. Impacts due to impingement and entrainment losses are minimized because the closed-cycle cooling system at the plant minimizes the amount of cooling water withdrawn from and heated effluent returned to the estuary. The water quality of the effluent ( *e.g.* , temperature, toxicity, TDS concentrations) would continue to meet present NJPDES permit conditions for protection of aquatic life. The staff concludes that the proposed EPU would have no significant impact to aquatic biota. Essential Fish Habitat Consultation The Magnuson-Stevens Fishery Conservation and Management Act
(MSA)identifies the importance of habitat protection to healthy fisheries. Essential Fish Habitat
(EFH)is defined as those waters and substrata necessary for spawning, breeding, feeding, or growth to maturity (Magnuson-Stevens Act, 16 U.S.C. 1801 *et seq.* ). Designating EFH is an essential component in the development of Fishery Management Plans to minimize habitat loss or degradation of fishery stocks and to take actions to mitigate such damage. The consultation requirements of section 305(b) of the MSA provide that Federal agencies consult with the Secretary of Commerce on all actions or proposed actions authorized, funded, or undertaken by the agency that may adversely affect EFH. An EFH assessment for the proposed EPU was sent to the National Marine Fisheries Service
(NMFS)under separate cover to initiate an EFH consultation. By letter dated July 13, 2007 (ADAMS Accession No. ML072000450), NMFS found the EFH assessment satisfactory. Impacts on Terrestrial Biota The potential impacts to terrestrial biota from the proposed action would be those from transmission line ROW maintenance. Under EPU conditions, PSEG does not plan to change transmission line maintenance or add new transmission lines. In addition, PSEG does not plan to conduct major refurbishment of significant land-disturbing activities in order to implement the proposed EPU. Because no changes are planned that have the potential to impact terrestrial biota, the NRC staff concludes that the proposed EPU would have no impacts to terrestrial biota associated with transmission line ROW maintenance. Threatened and Endangered Species and Critical Habitat In a letter dated December 8, 2006, pursuant to section 7 of the Endangered Species Act of 1969, as amended, the NRC requested from the NMFS a list of species and information on protected, proposed, and candidate species and critical habitat that are under their jurisdiction and may be in the vicinity of HCGS and its associated transmission lines. In response, NMFS issued a letter dated January 26, 2007, that provided information on the endangered shortnose sturgeon; Atlantic sturgeon ( *Acipenser oxyrinchus oxyrinchus* ), a candidate species for listing; and five species of endangered or threatened sea turtles: loggerhead ( *Caretta caretta* ), Kemp's ridley ( *Lepidochelys kempii* ), leatherback ( *Dermochelys coriacea* ), green ( *Chelonia mydas* ), and hawksbill ( *Eretmochelys imbricata* ) turtles. The NRC staff investigated the effects of HCGS operation on these species and found that the primary concern for these endangered and threatened species is the risk of impingement or entrainment due to cooling water intake by the plant. The proposed EPU would not change the intake flow, and, therefore, would not increase in the risk of impingement and entrainment. To dissipate the additional heat created by the EPU, the temperature of the plant's cooling water discharge would be slightly elevated, but still within the NJPDES 24-hour average temperature limit of 97.1 °F. In addition, HCGS has had no takes of any of the endangered or threatened species listed above. Therefore, the NRC staff anticipates no effects related to the intake or discharge on threatened or endangered species under NMFS(s jurisdiction, and on May 3, 2007, sent a letter to NMFS concluding the informal section 7 consultation. Although an informal consultation with the U.S. Fish and Wildlife Service regarding bald eagles was initiated for the HCGS, the U.S. Fish and Wildlife Service delisted bald eagles pursuant to the Endangered Species Act on July 9, 2007, and concluded the informal consultation. Socioeconomic Impacts The potential socioeconomic impacts due to the proposed EPU include changes in the payments in lieu of taxes for Lower Alloways Creek Township and Salem County and changes in the size of the workforce at HCGS. Nearly 70 percent of HCGS employees currently reside in Salem, Cumberland, and Gloucester Counties in New Jersey. The proposed EPU would not increase the size of the HCGS workforce, since proposed plant modifications and other planned activities would be handled by the current workforce or would be phased in during planned outages. Also, the proposed EPU would not increase the size of the HCGS workforce during future refueling outages. Therefore, the proposed EPU would not have any measurable effect on annual earnings and income in Salem, Cumberland, and Gloucester Counties nor would there be any increased demand for community services. According to the 2000 Census, Salem, Cumberland, and Gloucester County populations were about 20.4, 41.6, and 14.3 percent minority, respectively (USCB 2000). The percentages of minority populations residing in Salem and Gloucester Counties were well below the State minority population of 34.0 percent. In addition, the poverty rates for individuals living in Salem and Cumberland Counties were 9.5 and 15.0 percent, respectively, which were higher than the State's average of 8.5 percent (the Gloucester County poverty rate was 6.2 percent) (USCB 2000a). Even though these percentages are relatively high, the proposed EPU would not have any disproportionately high and adverse impacts to minority and low-income populations, because no significant environmental impacts were identified during the analysis. The proposed EPU could affect the value of HCGS and the amount of monies paid to local jurisdictions, in-lieu-of-property tax payments, because the total amount of tax money to be distributed would increase as power generation increases and because the proposed EPU would increase HCGS's value, thus resulting in potentially larger payments to Lower Alloways Creek Township and Salem County. Also, because the proposed EPU would increase the economic viability of HCGS, the probability of early plant retirement would be reduced. Early plant retirement would have a negative impact on the local economy by reducing or eliminating payments to Lower Alloways Creek Township and Salem County and limiting employment opportunities in the region. Since the proposed EPU would not affect annual earnings and income in Salem County, nor demand for community services and due to the lack of significant environmental impacts on minority or low-income populations, there would be no significant socioeconomic or environmental justice impacts associated with the proposed EPU. Conversely, the proposed EPU could have a positive effect on the regional economy because of the potential increase in the payments in-lieu-of-taxes received by the Lower Alloways Creek Township and Salem County, due to the potential increase in the book value of HCGS and long-term viability of HCGS. Summary The proposed EPU would not result in a significant change in non-radiological impacts in the areas of land use, water use, waste discharges, cooling tower operation, terrestrial and aquatic biota, transmission facility operation, or socioeconomic factors. No other non-radiological impacts were identified or would be expected. Table 2 summarizes the non-radiological environmental impacts of the proposed EPU at HCGS. Table 2.—Summary of Non-Radiological Environmental Impacts Land Use No significant land use modifications; installed temporary office space to support EPU. Cooling Tower No significant aesthetic impact; no significant fogging or icing. Transmission Facilities No physical modifications to transmission lines or ROWs; lines meet shock safety requirements; small increase in electrical current would cause small increase in electromagnetic field around transmission lines. Water Use No configuration change to intake structure; no increase rate of withdrawal; slightly increase in water consumption due to increased evaporation; no water use conflicts. Discharge Increase in water temperature and containment concentration discharged to Delaware River; would meet discharge limits in current NJPDES permit following EPU implementation. Aquatic Biota Entrainment and impingement losses may change over time due to changes in the aquatic population but are minimized because of the closed-cycle cooling system utilized at the plant. The water quality of the effluent would continue to meet NJPDES permit conditions for protection of aquatic life. EFH consultation ongoing. Terrestrial Biota No land disturbance or changes to transmission line ROW maintenance are expected; therefore, there would be no significant effects on terrestrial species or their habitat. Threatened and Endangered Species No significant impacts are expected on threatened or endangered species or their habitat. Informal consultation with U.S. Fish and Wildlife Service ongoing. Socioeconomic No change in the size of HCGS labor force required for plant operation and planned outages; proposed EPU could increase payments in-lieu-of-taxes to Lower Alloways Creek Township and Salem County as well as the book value of HCGS; there would be no disproportionately high and adverse impact on minority and low-income populations. Radiological Impacts The NRC staff evaluated radiological environmental impacts on waste streams, dose, accident analysis, and fuel cycle and transportation factors. Following is a general discussion of these issues and an evaluation of their environmental impacts. Radioactive Waste Stream Impacts HCGS uses waste treatment systems designed to collect, process, and dispose of gaseous, liquid, and solid wastes that might contain radioactive material in a safe and controlled manner such that the discharges are in accordance with the requirements of Title 10 of the *Code of Federal Regulations* (10 CFR) Part 20, and Appendix I to 10 CFR Part 50. The licensee has indicated that operation at EPU conditions would not result in any changes in the operation or design of equipment in the radioactive solid waste, liquid waste, or gaseous waste management systems (GWMS). The safety and reliability of these systems would be unaffected by the power uprate. Neither the environmental monitoring of any of these waste streams nor the radiological monitoring requirements of the HCGS Technical Specifications and/or Offsite Dose Calculation Manual
(ODCM)would be affected by the EPU. Furthermore, the EPU would not introduce any new or different radiological release pathways, nor would it increase the probability of either an operator error or an equipment malfunction, that would result in an uncontrolled radioactive release (PSEG 2005). The EPU would produce a larger amount of fission and activation products; however, the waste treatment systems are designed to handle the additional source term. The specific effects on each of the radioactive waste management system are evaluated below. Gaseous Radioactive Waste and Offsite Doses During normal operation, HCGS's GWMS processes and controls the release of gaseous radioactive effluents to the environment. The GWMS includes the off-gas system and various building ventilation systems. The radioactive release rate of the gaseous effluent is well monitored and administratively controlled by the HCGS ODCM (PSEG 2005). The single year highest annual releases of gaseous radioactive material, for the time period 2000-2004, were 63.0 Curies
(Ci)for noble gases in 2003, 0.060 Ci for particulates in 2000, and 0.014 Ci for iodines in 2003 (PSEG 2005). The licensee has estimated that the amount of radioactive material released in gaseous effluents would increase in proportion to the increase in power level (15 percent) (PSEG 2005). Based on experience from EPUs at other plants, the NRC staff concludes that this is an acceptable estimate. The dose to a member of the public, including the additional gaseous radioactive material that would be released from the proposed EPU, is calculated to still be well within the radiation standards of 10 CFR Part 20 and the dose design objectives of Appendix I to 10 CFR Part 50. Therefore, the NRC staff concludes that the impact from the EPU would not be significant. Liquid Radioactive Waste and Offsite Doses During normal operation, HCGS's Liquid Waste Management System
(LWMS)processes and controls the release of liquid radioactive effluents to the environment, such that the doses to individuals offsite are maintained within the limits of 10 CFR Part 20 and the design objectives of Appendix I to 10 CFR Part 50. The LWMS is designed to process the waste and then recyclesit within the plant as condensate, reprocesses it through the radioactive waste system for further purification, or discharges it to the environment as liquid radioactive waste effluent in accordance with facility procedures which comply with New Jersey and Federal regulations. The radioactive release rate of the liquid effluent is well monitored and administratively controlled by the HCGS ODCM (PSEG 2005). The single year highest annual releases of liquid radioactive material, for the time period 2000-2004, were 54,742,400 gallons (2.072E+8 liters) and 0.068 Ci of fission and activation products in 2003 (PSEG 2005). Even though the EPU would produce a larger amount of radioactive fission and activation products and a larger volume of liquid to be processed, the licensee expects the LWMS to remove all but a small amount of the increased radioactive material. The licensee has estimated that the volume of radioactive liquid effluents released to the environment and the amount of radioactive material in the liquid effluents would increase by 2.2 percent, due to the EPU. Based on experience from EPUs at other plants, the NRC staff concludes that this is an acceptable estimate. The dose to a member of the public, including the additional liquid radioactive material that would be released from the proposed EPU, is calculated to still be well within the radiation standards of 10 CFR Part 20 and the dose design objectives of Appendix I to 10 CFR Part 50. Therefore, the NRC staff concludes that the impact from the EPU would not be significant. Solid Radioactive Waste and Offsite Doses During normal operation, HCGS's Solid Waste Management System
(SWMS)collects, processes, packages, and temporarily stores radioactive dry and wet solid wastes prior to shipment offsite and permanent disposal. The SWMS is designed to package the wet and dry types of radioactive solid waste for offsite shipment and burial, in accordance with the requirements of applicable NRC and Department of Transportation regulations, including 10 CFR Part 61, 10 CFR Part 71, and 49 CFR Parts 170 through 178. This results in radiation exposures to a member of the public to be well within the limits of 10 CFR Part 20 and the design objectives of Appendix I to 10 CFR Part 50. The volume of solid radioactive waste generated varied from about 11.7 to almost 90.4 cubic meters per year for the time period 2000-2004; the largest volume generated was 90.4 cubic meters in 2002. The amount of solid radioactive material in the waste generated varied from 1 to almost 600 Ci per year during that same period. The largest amount of radioactive material generated in the solid waste was 591 Ci in 2001 (PSEG 2005). The EPU would produce a larger amount of radioactive fission and activation products, and treatment of this increase would require more frequent replacement or regeneration of SWMS filters and demineralizer resins. The licensee has estimated that the volume and radioactivity of solid radioactive waste would increase by approximately 14.7 percent from the average of the time period 2000-2004, due to the EPU (PSEG 2005). Based on experience from EPUs at other plants, the NRC staff concludes that this is an acceptable estimate. Therefore, the staff concludes that the impact from the increased volume of solid radwaste generated due to the EPU would not be significant. The licensee estimates that the EPU would require replacement of 10 percent more fuel assemblies at each refueling. This increase in the amount of spent fuel being generated would require an increase in the number of dry fuel storage casks used to store spent fuel. However, the current dry fuel storage facility at HCGS can accommodate the increase. Occupational Radiation Doses The proposed EPU would result in the production of more radioactive material and higher radiation dose rates in some areas at HCGS. PSEG's radiation protection staff will monitor these increased dose rates and make adjustments in shielding, access requirements, decontamination methods, and procedures as necessary to minimize the dose to workers. In addition, occupational dose to individual workers must be maintained within the limits of 10 CFR Part 20 and as low as reasonably achievable. The licensee has estimated that after the implementation of EPU, the estimated annual average collective occupational dose would be in the range of 146 person-rem, representing a 16-percent increase of in-plant occupation exposure (PSEG 2005). According to the 2004 report on “Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities,” the highest HCGS occupational exposure is 240 person-rem in 2004, for the time period 2002-2004 (NUREG 2004). The dose to a member of HCGS personnel from the radiation exposures described above, increased by 20 percent, would still be well within the radiation standards of 10 CFR Part 20. Based on experience from EPUs at other plants, the NRC staff concludes that these estimates are acceptable. Based on these estimates, the NRC staff concludes that the increase in occupational exposure would not be significant. Offsite Radiation Doses Offsite radiation dose consists of three components: gaseous, liquid, and direct gamma radiation. As previously discussed under the Gaseous Radiological Wastes and Liquid Radiological Wastes sections, the estimated doses to a member of the public from gaseous and liquid effluents after the EPU is implemented would be within the dose design objectives of Appendix I to 10 CFR Part 50. The final component of offsite dose is from direct gamma radiation dose from radioactive waste stored temporarily onsite, including spent fuel in dry cask storage, and radionuclides (mainly nitrogen-16) in the steam from the reactor passing through the turbine system. The high energy radiation from nitrogen-16 is scattered or reflected by the air above the site and represents an additional public radiation dose pathway known as “skyshine.” The licensee estimated that the offsite radiation dose from skyshine would increase approximately 16 percent for a 20-percent increase in steam flow, which bounds the proposed EPU; more nitrogen-16 is produced at the higher EPU power and less of the nitrogen-16 decays before it reaches the turbine system because of the higher rate of steam flow due to the EPU. The licensee's radiological environmental monitoring program measures radiation dose at the site boundary and in the area around the plant with an array of thermoluminescent dosimeters. The licensee estimated that the offsite radiation dose would increase to approximately 9.3 millirem (mrem), in proportion to the EPU power increase (15 percent) (PSEG 2005). Based on experience from EPUs at other plants, the NRC staff concludes that this is an acceptable estimate. EPA regulation 40 CFR Part 190, and NRC regulation 10 CFR Part 20, limit the dose to any member of the public to 25 mrem per year to the whole body from the entire nuclear fuel cycle. The offsite dose from all sources, including radioactive gaseous and liquid effluents and direct radiation, would still be well within this limit after the EPU is implemented. Therefore, the NRC staff concludes that the increase in offsite radiation dose would not be significant. Postulated Accident Doses As a result of implementation of the proposed EPU, there would be an increase in the inventory of radionuclides in the reactor core; the core inventory of radionuclides would increase as power level increases. The concentration of radionuclides in the reactor coolant may also increase; however, this concentration is limited by the HCGS technical specifications. Therefore, the reactor coolant concentration of radionuclides would not be expected to increase significantly. Some of the radioactive waste streams and storage systems may also contain slightly higher quantities of radioactive material. The calculated doses from design basis postulated accidents for HCGS are currently well below the criteria of 10 CFR 50.67. The licensee has estimated that the radiological consequences of postulated accidents would increase approximately in proportion to the increase in power level from the EPU (15 percent). Based on experience from EPUs at other plants, the NRC staff concludes that this is an acceptable estimate. The calculated doses from design basis postulated accidents would still be well within the criteria of 10 CFR 50.67 after the increase due to the implementation of the EPU. These calculated doses are based on conservative assumptions for the purposes of safety analyses. Estimates of the radiological consequences of postulated accidents for the purposes of estimating environmental impact are made by the NRC using best estimate assumptions, which result in substantially lower dose estimates. Therefore, the NRC staff concludes that the increase in radiological consequences for postulated accidents due to the EPU would not be significant. Fuel Cycle and Transportation Impacts The environmental impacts of the fuel cycle and transportation of fuel and waste are described in 10 CFR 51.51 Table S-3 and 10 CFR 51.52 Table S-4, respectively. An NRC generic EA (53 FR 6040, dated February 29, 1988) evaluated the applicability of Tables S-3 and S-4 to a higher burn-up fuel cycle and concluded that there would be no significant change in environmental impact from the parameters evaluated in Tables S-3 and S-4 for fuel cycles with uranium enrichments up to 5 weight percent uranium-235 and burn-ups less than 60,000 MW days per metric ton of uranium-235 (MWd/MTU). The proposed EPU would increase the power level to 3,840 MWt, which is approximately 1 percent above the reference power level of 3,800 MWt for Table S-4. The increased power level of 3,840 MWt corresponds to approximately 1,265 MWe, which is 26.5 percent above the reference power level of 1,000 MWe for Table S-3. Part of the increase is due to a more efficient turbine design, which does not affect the impacts of the fuel cycle and transportation of waste. More fuel will be used in the reactor (more fuel assemblies will be replaced at each refueling outage), and that will potentially affect the impacts of the fuel cycle and transportation of waste. However, the fuel enrichment and burn-up after the EPU will continue to be no greater than 5 weight percent uranium-235, and the fuel burn-up will be maintained less than 60,000 MWd/MTU. The NRC staff concludes that the HCGS EPU is bounded by the analysis of the environmental effects of the transportation of fuel and waste as described in the “Extended Burnup Fuel Use in Commercial [Light Water Reactors] LWRs; Environmental Assessment and Finding of No Significant Impact,” dated February 29, 1988 (53 FR 6040). Summary Based on the NRC staff review of licensee submission and the FES for operation, it is concluded that the proposed EPU would not significantly increase the consequences of accidents, would not result in a significant increase in occupational or public radiation exposure, and would not result in significant additional fuel cycle environmental impacts. Accordingly, the Commission concludes that there would be no significant radiological environmental impacts associated with the proposed action. Table 3 summarizes the radiological environmental impacts of the proposed EPU at HCGS. Table 3.—Summary of Radiological Environmental Impacts Gaseous Radiological Effluents Increased gaseous effluents would remain within NRC limits and dose design objectives. Liquid Radiological Effluents Increased liquid effluents (2.2 percent) would remain within NRC limits and dose design objectives. Solid Radioactive Waste Increased amount of solid radioactive waste generated (14.7 percent by volume) would remain bounded by evaluation in the FES. Occupational Radiation Doses Occupational dose would increase by roughly 16 percent. Doses would be maintained within NRC limits and as low as is reasonably achievable. Offsite Radiation Doses Radiation doses to members of the public would increase to approximately 9.3 mrem and continue to be well within NRC and EPA regulations. Postulated Accident Doses Calculated doses for postulated design-basis accidents would remain within NRC limits. Fuel Cycle and Transportation Impacts Fuel enrichment and burnup criteria would be met. Potential increases in the impact due to uranium fuel cycle and the transportation of fuel and waste would not be significant. Alternatives to Proposed Action As an alternative to the proposed action, the NRC staff considered denial of the proposed EPU (i.e., the “no-action” alternative). Denial of the application would result in no change in the current environmental impacts. However, if the proposed EPU were not approved, other agencies and electric power organizations may be required to pursue alternative means of providing electric generation capacity to offset the increased power demand forecasted for the PJM regional transmission territory. A reasonable alternative to the proposed EPU would be to purchase power from other generators in the PJM network. In 2003, generating capacity in PJM consisted primarily of fossil fuel-fired generators: coal generated 36.2 percent of PJM capacity; oil 14.3 percent; natural gas 6.8 percent; dual fired (i.e., gas and oil) 18.9 percent; nuclear 17.1 percent; hydroelectric 5.5 percent; and renewables 1.3 percent (ML062630235). This indicates that the majority of purchased power in the PJM territory would likely be generated by a fossil-fuel-fired facility. Construction (if new generation is needed) and operation of a fossil fuel plant would create impacts in air quality, land use, and waste management significantly greater than those identified for the proposed EPU at HCGS. HCGS does not emit sulfur dioxide, nitrogen oxides, carbon dioxide, or other atmospheric pollutants that are commonly associated with fossil fuel plants. Conservation programs such as demand-sidemanagement could feasibly replace the proposed EPU's additional power output. However, forecasted future energy demand in the PJM territory may exceed conservation savings and still require additional generating capacity. Furthermore, the proposed EPU does not involve environmental impacts that are significantly different from those originally identified in the 1984 HCGS FES for operation. Alternative Use of Resources This action does not involve the use of any resources not previously considered in the original FES for construction (AEC 1974). Agencies and Persons Consulted In accordance with its stated policy, on July 24, 2007, the NRC staff consulted with the New Jersey State official, Mr. Jerry Humphreys, of the New Jersey Department of Environmental Protection, regarding the environmental impact of the proposed action. The State of New Jersey provided comments in a letter from Kenneth C. Koschek, Supervising Environmental Specialist, Office of Permit coordination and Environmental Review, dated November 21, 2007 (ML073600859). The comments are addressed in this final EA. Finding of No Significant Impact On the basis of the EA, the NRC concludes that the proposed action would not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an Environmental Impact Statement for the proposed action. For further details with respect to the proposed action, see the licensee's application dated September 18, 2006, as supplemented on October 10, and October 20, 2006; February 14, February 16, February 28, March 13 (2 letters), March 22, March 30 (2 letters), April 13, April 18, April 30, May 10, May 18 (3 letters), May 24, June 22, August 3, August 17 (2 letters), August 27, August 31, September 11, October 10, October 23, November 15, November 30, and December 31, 2007; January 14, January 15, January 16, January 18, January 25, and January 30, 2008. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html.* Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff at 1-800-397-4209, or 301-415-4737, or send an e-mail to *pdr@nrc.gov.* Dated at Rockville, Maryland, this 3rd day of March 2008. For the Nuclear Regulatory Commission. John G. Lamb, Senior Project Manager, Plant Licensing Branch I-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8-4858 Filed 3-10-08; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION Sunshine Federal Register Notice Dates: Weeks of March 10, 17, 24, 31, April 7, 14, 2008. Place: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, Maryland. Status: Public and Closed. Matters To Be Considered: Week of March 10, 2008 There are no meetings scheduled for the Week of March 10, 2008. Week of March 17, 2008—Tentative Monday, March 17, 2008 12:55 p.m. Affirmation Session (Public Meeting) (Tentative): a. Final Rule—10 CFR Part 73 “Safeguards Information Protection Requirements” (RIN 3150 AH57) (Tentative). b. Pa'ina Hawaii, LLC (Materials License Application) (Tentative). c. Pa'ina Hawaii, LLC (Materials License Application) Atomic Safety and Licensing Board's Decision on Environmental Contentions (Dec. 21, 2007) (Tentative). d. Pacific Gas and Electric Co. (Diablo Canyon ISFSI), Docket No. 72-26-ISFSI, San Luis Obispo Mothers for Peace's Response to NRC Staff's Vaughn Index, Request for Leave To Conduct Discovery Against the NRC Staff, Request for Access to Unredacted Reference Documents, and Request for Procedures To Protect Submission of Sensitive Information (Tentative). This meeting will be webcast live at the Web address— *http://www.nrc.gov.* 1 p.m. Briefing on State of NRC Technical Programs (Public Meeting) ( *Contact:* Tamara Bloomer, 301 415-1725) [ *Note:* title of meeting reworded]. This meeting will be webcast live at the Web address— *http://www.nrc.gov.* Tuesday, March 18, 2008 9:30 a.m. Briefing by Independent External Panel To Identify Vulnerabilities in the U.S. NRC's Materials Licensing Program (Public Meeting) ( *Contact:* Aaron T. McCraw, 301-415-1277). This meeting will be webcast live at the Web address— *http://www.nrc.gov.* Week of March 24, 2008—Tentative Thursday, March 27, 2008 9:30 a.m. Discussion of Management Issues (Closed—Ex. 2). Week of March 31, 2008—Tentative There are no meetings scheduled for the Week of March 31, 2008. Week of April 7, 2008—Tentative Monday, April 7, 2008 9:30 a.m. Briefing on Digital Instrumentation and Control (Public Meeting) ( *Contact:* Steven Arndt, 301 415-6502). This meeting will be webcast live at the Web address— *http://www.nrc.gov.* Tuesday, April 8, 2008 10 a.m. Joint Meeting of the Federal Energy Regulatory Commission
(FERC)and the Nuclear Regulatory Commission
(NRC)(Public Meeting). To Be Held at FERC Headquarters, 888 First Street NE., Washington, DC. ( *Contact:* Michelle Schroll, 301 415-1662). This meeting will be webcast live at the Web address— *http://www.ferc.gov.* Week of April 14, 2008—Tentative There are no meetings scheduled for the Week of April 14, 2008. *The schedule for Commission meetings is subject to change on short notice. To verify the status of meetings, call (recording)—(301) 415-1292. Contact person for more information: Michelle Schroll,
(301)415-1662. The NRC Commission Meeting Schedule can be found on the Internet at: *http://www.nrc.gov/about-nrc/policy-making/schedule.html.* The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print), please notify the NRC's Disability Program Coordinator, Rohn Brown, at 301-492-2279, *TDD:* 301-415-2100, or by e-mail at *REB3@nrc.gov.* Determinations on requests for reasonable accommodation will be made on a case-by-case basis. This notice is distributed by mail to several hundred subscribers; if you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301-415-1969). In addition, distribution of this meeting notice over the Internet system is available. If you are interested in receiving this Commission meeting schedule electronically, please send an electronic message to *dkw@nrc.gov.* Dated: March 6, 2008. R. Michelle Schroll, Office of the Secretary. [FR Doc. 08-1007 Filed 3-7-08; 10:26 am]
Connectionstraces to 9
Traces to 9 documents
CFR
- Issuance of amendment.§ 50.92
- Hearing requests, petitions to intervene, requirements for standing, and contentions.§ 2.309
- Filing of documents.§ 2.302
- Notice for public comment; State consultation.§ 50.91
- Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review.§ 51.22
- Accident source term.§ 50.67
- Uranium fuel cycle environmental data—Table S-3.§ 51.51
- Environmental effects of transportation of fuel and waste—Table S-4.§ 51.52
U.S. Code
7 references not yet in our index
- 10 CFR 2
- 10 CFR 50
- 10 CFR 20
- 10 CFR 61
- 10 CFR 71
- 40 CFR 190
- 10 CFR 73