Notices. Notice

11,849 words·~54 min read·/register/2008/01/04/07-6278

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4910-60-P DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2007-28505] Pipeline Safety: Requests for Special Permits AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice. SUMMARY: The Federal pipeline safety laws allow a pipeline operator to request PHMSA to waive compliance with any part of the Federal pipeline safety regulations. We are publishing this notice to provide a list of requests we have received from pipeline operators seeking relief from compliance with certain pipeline safety regulations.
This notice seeks public comment on these requests, including comments on any environmental impacts. In addition, this notice reminds the public that we have changed what we call a decision granting such a request to a special permit. At the conclusion of the comment period, PHMSA will evaluate each request individually to determine whether to grant a special permit or deny the request. DATES: Submit any comments regarding any of these requests for special permit by February 4, 2008.
ADDRESSES: Comments should reference the docket number for the request and may be submitted in the following ways: • *E-Gov Web Site: http://www.Regulations.gov.* This site allows the public to enter comments on any **Federal Register** notice issued by any agency. • *Fax:* 1-202-493-2251. • *Mail:* Docket Management System: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590. • *Hand Delivery:* DOT Docket Management System;
U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590 between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. *Instructions:* You should identify the docket ID for the request you are commenting on at the beginning of your comments. If you submit your comments by mail, submit two copies. To receive confirmation that PHMSA received your comments, include a self-addressed stamped postcard.
Internet users may submit comments at *http://www.regulations.gov.* Note: Comments are posted without changes or edits to *http://www.regulations.gov,* including any personal information provided. There is a privacy statement published on *http://www.regulations.gov.* FOR FURTHER INFORMATION CONTACT: Wayne Lemoi by telephone at
(404)832-1160; or, e-mail at *wayne.lemoi@dot.gov.* SUPPLEMENTARY INFORMATION: Change in Nomenclature PHMSA changed the name of a decision we made granting a request for waiver of compliance from “decision granting waiver” to “special permit” to reflect that granting the request will not reduce safety. We commonly add safety conditions to decisions granting waivers to ensure that waiving compliance with an existing pipeline safety standard is consistent with pipeline safety. The change was simply a name change for a decision granting waiver under 49 U.S.C. 60118(c)(1). Comments Invited on Requests for Waiver PHMSA has filed in the Federal Docket Management System
(FDMS)requests for waivers we have received from pipeline operators seeking relief from compliance with certain pipeline safety regulations. Each request has been assigned a separate docket ID in the FDMS. We invite interested persons to participate by reviewing these requests and by submitting written comments, data or other views. Please include any comments on the environmental impacts that granting the requests may have. Before acting on any request, PHMSA will evaluate all comments received on or before the comment closing date. We will consider comments received after this date if it is possible to do so without incurring additional expense or delay. We may grant or deny these requests based on the comments we receive. PHMSA has received the following requests for waivers of compliance with pipeline safety regulations. Docket ID Requester Regulation(s) Nature of waiver PHMSA-2007-29033 ExxonMobil Pipeline Company 49 CFR 195.452(h) To allow certain anomalies discovered on the New Iberia to Sunset Pipeline in Louisiana to remain “as-is” by permanently maintaining an operating pressure reduction taken on January 3, 2007. The anomalies were discovered using In-Line Inspection
(ILI)tools during Integrity Management Program
(IMP)assessments. PHMSA-2007-29034 ConocoPhillips Pipe Line Company 49 CFR 195.452(h) To waive repair requirements for one dent located on the top of the BL-01 pipeline from Hardtner, KS to Wichita, KS and for one dent located on the top of the CM-01 pipeline from Kingfisher, OK to Medford, OK. The dents were discovered using ILI tools during IMP assessments. PHMSA-2007-0038 ConocoPhillips Alaska, Inc.
(CPAI)49 CFR 195.583 To waive atmospheric corrosion inspection requirements for certain non-piggable sections of CPAI's above ground pipelines on the North Slope of Alaska. PHMSA-2007-28994 Gulf South Pipeline Company, L.P 49 CFR 192.111 49 CFR 192.201 49 CFR 192.619 To authorize operation of the Southeast Expansion Project, a 110.8-mile gas transmission pipeline, from Harrisville, MS to Choctaw County, AL at a maximum allowable operating pressure
(MAOP)of 80% of the specified minimum yield strength (SMYS). PHMSA-2007-29078 Kern River Gas Transmission Company 49 CFR 192.111 49 CFR 192.201 49 CFR 192.505 49 CFR 192.619 To authorize operation of approximately 1,380 miles of the Kern River pipeline system and 300 miles of Common Facilities running from Lincoln County, WY through Utah and into San Bernardino County, CA at an MAOP of 80% SMYS in Class 1 locations, 67% SMYS in Class 2 locations, and 56% SMYS in Class 3 locations and compressor stations. PHMSA-2007-29032 Texas Eastern Transmission, L.P. (a Spectra Energy Company) 49 CFR 192.611 To authorize operation of 19 pipeline segments at 6 sites along Lines 14, 18, and 31 downstream of the Union Church and Clinton compressor stations in Mississippi without reducing operating pressure as a result of a change from Class 1 to Class 2 locations. PHMSA-2007-0039 Gulf South Pipeline Company, L.P 49 CFR 192.611 To authorize operation of 3 pipeline segments on the TPL 880 pipeline in Marion County, AL without reducing operating pressure as a result of a change from Class 1 to Class 3 locations. Authority: 49 U.S.C. 60118(c)(1) and 49 CFR 1.53. Issued in Washington, DC, on December 27, 2007. Jeffrey D. Wiese, Associate Administrator for Pipeline Safety. [FR Doc. E7-25634 Filed 1-3-08; 8:45 am] BILLING CODE 4910-60-P DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35081] Canadian Pacific Railway Company, et al.—Control—Dakota, Minnesota & Eastern Railroad Corp., et al. AGENCY: Surface Transportation Board, DOT. ACTION: Decision No. 4 in STB Finance Docket No. 35081; Notice of Acceptance of Application; Issuance of Procedural Schedule. SUMMARY: The Surface Transportation Board (Board) is accepting for consideration the application filed on December 5, 2007, by Canadian Pacific Railway Corporation (CPRC), Soo Line Holding Company, a Delaware Corporation and indirect subsidiary of CPRC (Soo Holding), Dakota, Minnesota & Eastern Railroad Corporation (DM&E), and Iowa, Chicago & Eastern Railroad Corporation, a wholly owned rail subsidiary of DM&E (IC&E). The application filed on December 5 seeks Board approval under 49 U.S.C. 11321-26 of the acquisition of control of DM&E and IC&E by Soo Holding (and, indirectly, by CPRC). This proposal is referred to as the “transaction,” and CPRC, Soo Holding, DM&E, and IC&E are referred to collectively as “Applicants.” 1 1 In Decision No. 1 in this proceeding, served September 21, 2007, the Board issued a Protective Order to facilitate the discovery process and establish appropriate procedures for the submission of evidence containing confidential or proprietary information. On October 5, 2007, Applicants submitted an application for the proposed transaction and requested that the Board treat the transaction as a “minor transaction.” In Decision No. 2, served November 2, 2007, and published in the **Federal Register** on November 8, 2007, at 72 FR 63232-63236, the Board found the proposed transaction to be “significant” and considered the October 5 submission as a prefiling notification, thus allowing Applicants to perfect their application by submitting the difference between the filing fee for a “minor” transaction and “significant” transaction, as well as any supplemental materials or information. On December 5, 2007, applicants submitted the difference in filing fees and other supplemental material. We will refer to the October 5 prefiling notification, as supplemented on December 5, as “the December 5 application.” The Board finds that the transaction is a “significant transaction” under 49 CFR 1180.2(b), and adopts a procedural schedule for consideration of the application, under which the Board's final decision would be issued by September 30, 2008. DATES: The effective date of this decision is January 4, 2008. Any person who wishes to participate in this proceeding as a party of record
(POR)must file, no later than January 25, 2008, a notice of intent to participate if they have not already done so. Descriptions of anticipated responsive applications (including inconsistent applications) and any petitions for waiver or clarification with respect to such applications are also due by January 25, 2008. Applicants shall file a proposed Safety Integration Plan
(SIP)with the Board's Section of Environmental Analysis
(SEA)and the Federal Railroad Administration
(FRA)by February 4, 2008. All environmental comments must also be filed by February 4, 2008, addressed to the attention of SEA. All responsive applications, requests for conditions, and any other evidence and argument in opposition to the application, including filings by DOJ and DOT, must be filed by March 4, 2008. Replies to responsive applications, requests for conditions, and other opposition, and rebuttal in support of the application must be filed by April 18, 2008. DOJ and DOT will be allowed to file, on the response due date (here, April 18), their comments in response to the comments of other parties, and Applicants will be allowed to file a response to any such comments filed by DOJ and/or DOT by April 25, 2008. Rebuttals in support of responsive applications, requests for conditions, and other opposition must be filed by May 19, 2008. Final briefs, if any, will be due by July 2, 2008. If a public hearing or oral argument is held, it will be held on a date to be determined by the Board. The Board will issue its final decision by September 30, 2008. For further information respecting dates, see Appendix A (Procedural Schedule). ADDRESSES: Any filing submitted in this proceeding must be submitted either via the Board's e-filing format or in the traditional paper format as provided for in the Board's rules. Any person using e-filing should attach a document and otherwise comply with the instructions found on the Board's Web site at *http://www.stb.dot.gov* at the “E-FILING” link. Any person submitting a filing in the traditional paper format should send an original and 10 paper copies of the filing (and also an electronic version) to: Surface Transportation Board, 395 E Street, SW., Washington, DC 20423-0001. In addition, one copy of each filing in this proceeding must be sent (and may be sent by e-mail only if service by e-mail is acceptable to the recipient) to each of the following:
(1)Secretary of Transportation, 1200 New Jersey Avenue, SE., Washington, DC 20590;
(2)Attorney General of the United States, c/o Assistant Attorney General, Antitrust Division, Room 3109, Department of Justice, Washington, DC 20530;
(3)Terence M. Hynes (representing CPRC), Sidley Austin LLP, 1501 K Street, NW., Washington, DC 20005;
(4)William C. Sippel (representing DM&E), Fletcher & Sippel, 29 North Wacker Drive, Suite 920, Chicago, IL 60606; and
(5)any other person designated as a POR on the service list notice (as explained below, the service list notice will be issued as soon as practicable). FOR FURTHER INFORMATION CONTACT: Julia M. Farr,
(202)245-0359. [Assistance for the hearing impaired is available through the Federal Information Relay Service
(FIRS)at 1-800-877-8339.] SUPPLEMENTARY INFORMATION: CPRC is a Canadian corporation whose stock is publicly held and traded on the New York and Toronto stock exchanges. CPRC and its U.S. rail carrier subsidiaries, Soo Line Railroad Company
(Soo)and Delaware and Hudson Railway Company, Inc. (D&H), operate a transcontinental rail network over 13,000 miles in Canada and the United States. (CPRC, Soo, and D&H are referred to collectively as CPR.) CPR serves the principal business centers of Canada and 14 U.S. states in the Northeast and Midwest. The major commodities transported by CPR include bulk commodities such as grain, coal, sulfur, and fertilizers; merchandise freight including finished vehicles and automotive parts, forest products, industrial products, and consumer products; and intermodal traffic. In fiscal year 2006, the freight revenues of CPR were approximately $4.4 billion. DM&E is a privately held Class II rail carrier headquartered in Sioux Falls, SD. DM&E and its subsidiary, IC&E, operate over 2,500 miles of rail lines serving eight U.S. states, including the major Midwestern gateways of Chicago, IL, Minneapolis/St. Paul, MN, and Kansas City, MO. Together, DM&E and IC&E interchange rail traffic with all seven U.S. Class I railroads. DM&E was created in 1986 from lines formerly owned by Chicago and North Western Transportation Company
(CNW)in South Dakota, Minnesota, and Iowa. In 1996 DM&E acquired CNW's Colony Line, running from Eastern Wyoming through Western South Dakota and into Northwestern Nebraska. DM&E subsequently acquired the lines now operated by IC&E from the former Iowa and Minnesota Rail Link in 2002. IC&E owns or operates approximately 1,322 route miles of rail lines that were once part of the CPR system, in Illinois, Minnesota, Missouri, and Wisconsin. In 2006, the Board granted DM&E authority to construct and operate 282 miles of new railroad lines to serve coal origins in Wyoming's Powder River Basin (PRB). DM&E states that it is currently pursuing the process of acquiring the right-of-way needed to build the PRB line. It must execute agreements with PRB mines on terms for operations by DM&E over their loading track and facilities. DM&E must also secure sufficient contractual commitments from prospective coal shippers to route their traffic over the PRB line to justify the large investment to build it. Finally, DM&E must arrange financing for the project and comply with the environmental conditions imposed by the Board. If the proposed transaction is approved, CPR states that it plans to work diligently with DM&E to accomplish these necessary prerequisites to construction of the proposed PRB line but has not committed to constructing the line. The proposed transaction for which Applicants seek approval involves the acquisition of control of DM&E and IC&E by Soo Holding (and, indirectly, by CPRC). On October 4, 2007, Soo Line Properties Company, a Delaware corporation and wholly owned subsidiary of Soo Holding (Soo Properties), merged with and into DM&E, subject to the voting trust described below. At the time of closing, DM&E shareholders received cash consideration of approximately $1.48 billion, subject to certain working capital adjustments in accordance with the Agreement and Plan of Merger (Merger Agreement). As part of the $1.48 billion paid at closing, DM&E and IC&E repaid certain obligations to third party creditors, including $250 million to the FRA. The Merger Agreement provides for future contingent payments by CPR to DM&E's shareholders of up to approximately $1 billion. Specifically, an additional payment of $350 million will become due if construction starts on the PRB line prior to December 31, 2025. Further contingent payments of up to approximately $707 million will become due upon the movement of specified volumes of PRB coal over the PRB line prior to December 31, 2025. *Financial Arrangements.* No new equity securities will be issued in connection with the transaction. The purchase price was funded by CPRC from available cash and credit facilities. In connection with the closing, Soo Holdings advanced $250 million to DM&E to enable it to repay outstanding indebtedness to FRA. DM&E's obligation to FRA was replaced by an intercompany private loan from Soo Holdings to DM&E in the amount of $250 million. *Passenger Service Impacts.* Applicants state that no commuter or passenger service is provided over the lines currently operated by DM&E. Applicants do not anticipate that any CPR line over which passenger operations are presently conducted would be materially affected by the proposed transaction. Applicants state that CPR's freight train schedules are built around passenger and commuter operations, in order to avoid freight train interference with passenger train service. Applicants further assert that no such line will be downgraded, eliminated, or operated on a consolidated basis as a result of the transaction. The Board notes that both IC&E and CPR share tracks with the Commuter Rail Division of the Regional Transportation Authority (Metra), a commuter rail authority serving the Chicago metropolitan area. The Board also notes that the National Railroad Passenger Corporation (Amtrak) operates over CPR between Minneapolis/St. Paul and Chicago, with heavier traffic between Milwaukee and Chicago. *Discontinuances/Abandonments.* Applicants state that they do not presently plan any line abandonments or the elimination of any duplicative facilities in connection with the transaction. *Public Interest Considerations.* Applicants contend that the transaction would not result in any lessening of competition, creation of a monopoly, or restraint of trade in freight surface transportation in any region of the United States. Rather, Applicants state that CPR's acquisition of DM&E and IC&E (collectively referred to as DME) would be strongly pro-competitive. Most significantly, Applicants note that the transaction would create new single-system rail options where none currently exist. Applicants contend that CPR's plan to invest $300 million in capital improvements on DME's existing lines would enhance safety and the efficiency of its operations, thereby strengthening the competitive ability of DME. Applicants state that this investment would allow DME to upgrade track, bridges, and other rail facilities and to bring its safety performance closer to CPR standards, thus improving the fluidity of their train operations. The transaction would restore CPR's direct access to the Kansas City gateway, enhancing its ability to compete effectively for rail traffic moving between CPR's current network and points in the U.S. Southwest and Mexico. Applicants assert that the transaction would enable CPR to assist DM&E in possibly bringing to fruition its proposal to introduce a third rail competitor to the PRB, which is currently served by UP and BNSF. According to the application, the geographic limitations of DME's existing rail network restrict the ability of its shippers to compete in distant end markets for their products. Currently, DME must interchange traffic moving beyond its service territory with other railroads at busy rail gateways, including Chicago, Kansas City, and Minneapolis/St. Paul, thus requiring longer transit times. As a result of the transaction, Applicants state that DME would become part of a transcontinental Class I rail system with direct access to major metropolitan centers of the U.S. Midwest (including Chicago, Detroit, MI, Milwaukee, WI, and Minneapolis/St. Paul), U.S. Northeast (including Buffalo, NY, and Philadelphia, PA), and Canada (including Calgary, Montreal, Toronto, and Vancouver), positioning DME shippers to take advantage of future opportunities for growth. Applicants state that the new single system routings created by the proposed transaction will give DME shippers—for the first time—direct rail access to all of these potential destinations, enhancing their ability to compete in distant end markets for their products. Applicants state that CPR shippers would likewise gain the ability to ship products to/from points served by DME on a single-system basis. Specifically, Applicants assert that CPR's acquisition of IC&E's lines would give CPR the ability to participate in the growing transportation of ethanol. Applicants also state that the transaction would give CPR the opportunity to increase its participation in the substantial volume of bentonite clay traffic that originates at the western end of DM&E's system. Applicants state that CPR would also gain greater diversification in the U.S. grain network with IC&E's coverage of Iowa and Southern Minnesota corn origins. Applicants state that DME and its customers would also benefit from access to CPR's large, modern car and locomotive fleet. The ability to draw upon CPR's fleet of almost 70,000 cars, and improved equipment utilization made possible by coordinating CPR and DME operations, would produce cost savings for DME and help it to meet the needs of its customers. The transaction would also generate substantial benefits for shippers of a variety of commodities, including grain, ethanol, bentonite clay, silica sand, steel, and plastics. In support of this, Applicants submit numerous statements of shippers who testify as to the opportunities for growth, increased access to markets, and improved ability to compete in distant markets, as potential benefits of the proposed transaction. Applicants assert that the transaction would not result in any lessening of effective rail competition because the transaction is almost entirely “end-to-end,” in that there is minimal overlap in Applicants' current rail systems. Applicants note that both CPR and DME operate between Minneapolis/St. Paul and Chicago, but several other rail carriers also operate between those points now, and they will continue to do so if the proposed transaction is approved and consummated. CPR and DME intersect at only four locations: Chicago, St. Paul, Minnesota City, MN, and La Crescent, MN. Thus, Applicants state that the rail networks of CPR and DME are complementary, not competitive. While intermodal shipments and motor vehicles are major commodities of CPR, Applicants argue that DME does not participate in significant volumes of such traffic. Conversely, steel shipments account for a far greater portion of traffic for DME than for CPR. There are five U.S. states in which both CPR and DME offer rail service (either directly or through a haulage agreement or other commercial arrangement): Illinois, Minnesota, Missouri, South Dakota, and Wisconsin. In Wisconsin, CPR and DME do not serve any common stations. Within Illinois, Minnesota, Missouri, and South Dakota, Applicants believe that 30 stations are commonly served by CPR and DME. Of those 30 stations, ten stations are served by CPR, DME, and one other railroad. Fifteen stations are served by the Applicants and two additional carriers. Five stations, according to the *Official Railway Station List (ORSL)* , are served exclusively by CPR and DME. Based on the Board's *Carload Waybill Sample* for the year 2005, Applicants state that none of the five stations exclusively served by CPR and DME would lose competitive rail service as a result of the proposed transaction due to the fact that at least one of the carriers was not active at each station. Applicants also assert that none of the ten stations served by CPR, DME, and one additional rail carrier (which are located in Illinois, Minnesota, Missouri, and South Dakota) would experience a loss of competitive rail service as a result of the transaction, due to a variety of reasons, including the fact that several stations served solely as a point of interchange for CPR and/or DME. Additionally, according to the *Carload Waybill Sample* , rail traffic that originated or terminated at several of the stations was not handled by both CPR and DME. Regarding the 14 short line carriers in DME's service territory, Applicants state that none will be left without competitive routing options involving non-Applicant carriers following the proposed transaction. Thirteen of these short line carriers have the ability to interchange with at least one railroad other than Applicants. One short line carrier, the Iowa Traction Railroad Company, can connect only with IC&E today, so its options would not be affected by the transaction. In response to comments filed by Iowa Northern Railway Company
(IANR)on October 26, 2007, challenging the rigor and completeness of their station-specific analysis, Applicants also submitted an analysis of the impact on geographic (i.e., source or destination) competition, as well as further analysis of possible horizontal competitive issues, by examining Applicants' participation in rail traffic at the Bureau of Economic Analysis Economic Area
(BEA)level. Applicants assert that the transaction would not reduce or eliminate source or destination competition for the traffic in which Applicants participate today. *Independent Voting Trust.* On October 4, 2007, Soo Properties was merged with and into DM&E. At that time, all the common shares of DM&E were deposited into an independent voting trust, pending Board approval of the proposed transaction, in order to avoid unlawful control of DM&E and IC&E in violation of 49 U.S.C. 11323. On or after the effective date of a Board final order authorizing the transaction, the voting trust would be terminated; DM&E's shares would be transferred to Soo Holding; and DM&E would become a wholly owned subsidiary of Soo Holding (and an indirect subsidiary of CPRC). In the event that the Board does not approve the transaction, Soo Holding would use its reasonable best efforts to sell or direct the trustee to sell the trust interests to one or more eligible purchasers or otherwise dispose of the trust interests during a period of 2 years after such a decision becomes final. With the exception of the Board's final approval of the transaction, all conditions precedent to closing of the merger have been satisfied. *Environmental Impacts.* Applicants contend that the transaction would not result in any increases in rail traffic, train operations, or yard activity that would exceed the Board's thresholds for environmental review in 49 CFR 1105.7(e)(5). Applicants therefore assert that the transaction does not require the preparation of environmental documentation under 49 CFR 1105.6(b)(4). However, Applicants plan to prepare a Safety Integration Plan
(SIP)under the Board's rules at 49 CFR 1106 and 49 CFR 1180.1(f)(3) setting out how they would ensure that safe operations are maintained throughout the acquisition-implementation process, if the proposed transaction is approved. Applicants propose that the Board defer any required analysis of the environmental impacts of the movement of DM&E PRB coal trains over the lines of IC&E and/or CPR because definitive information regarding the likely volume, destination, and routing of DM&E PRB coal trains beyond DM&E's existing line remains speculative. The City of Winona, Mayo Clinic, and BNSF Railway Company
(BNSF)have filed comments on Applicants' proposed environmental approach. Applicants replied to BNSF's comments. The Board will consider these comments in its review of the transaction; there is no need for the commenters to refile those submissions. *Historic Preservation Impacts.* Applicants contend that a historic review is not required for this transaction. *Labor Impacts.* Applicants do not anticipate that the transaction would result in any operational changes that would adversely affect any Soo employees. The operational change involving the handling by Soo of traffic between Minnesota City and Chicago would likely have no significant effect on Soo employees because cars moving from or to Minnesota City would simply be added to trains currently operated by Soo over its own lines. The transaction involves an operational change that would affect the handling of certain DME traffic to and from Chicago, which would affect DME employees in two ways. First, there would be a reduction of two crew starts per day on trains operating on the lines from Waseca, MN, to Nora Springs, IA. This would affect employees who report for work at Waseca and draw their assignments from a crew board maintained there. However, there would be an offsetting addition of two crew starts per day on trains operating from Waseca to Minnesota City, which would be available to employees who report to Waseca. Second, there would be a reduction of four crew starts per day on IC&E because two daily IC&E trains, each requiring two crews, would no longer operate between Nora Springs and Chicago. That reduction would affect IC&E train and engine service employees who currently report for work at Mason City, IA, and Dubuque, IA, and draw their assignments from crew boards maintained at those locations. Applicants further state that it is possible that, as a result of this operational change, there would be a need for fewer active IC&E train and engine service employees at Mason City and Dubuque, for at least a short time. Because affected IC&E train and engine service employees have seniority covering all of IC&E's territory, they would be entitled, and expected, to take work assignments elsewhere on IC&E. Applicants expect sufficient work to be available on IC&E for all of the carrier's active train and engine service employees. Applicants state that any carrier employees who are adversely affected by the proposed transaction would be entitled to the benefits of a fair arrangement in accordance with the requirements of 49 U.S.C. 11326. *New York Dock Ry.—Control—Brooklyn Eastern District Terminal* , 360 I.C.C. 60, *aff'd sub nom. New York Dock Ry.* v. *United States* , 609 F.2d 83 (2d Cir. 1979). Applicants note that neither CPR nor DME has negotiated a protective agreement with any labor organization in connection with the proposed transaction. *Application Accepted.* For the reasons outlined in Decision No. 2, the Board finds that the transaction would be a “significant transaction,” under 49 CFR 1180.2(b), and accepts the December 5 application for consideration because it is in substantial compliance with the applicable regulations governing a significant transaction. *See* 49 U.S.C. 11321-26; 49 CFR 1180. The Board reserves the right to require the filing of additional supplemental information, if necessary for a full record. *Public Inspection.* The application is available for inspection in the library (Room 131) at the offices of the Surface Transportation Board, 395 E Street, SW., in Washington, DC. In addition, the application may be obtained from Mr. Hynes (representing CPRC) and Mr. Sippel (representing DM&E) at the addresses indicated above. *Procedural Schedule.* On November 13, 2007, Applicants filed a petition to establish a revised procedural schedule as directed by the Board in Decision No. 2. On November 26, 2007, the Board issued a notice of the proposed procedural schedule and requested public comments (Decision No. 3). The Board's proposed procedural schedule was the same as the Applicants' proposed procedural schedule, except that the record would close with the filing of briefs on July 2, 2008, and would provide for a possible oral argument or public hearing to be held on a date to be determined by the Board. No comments were received in opposition to the Board's proposed procedural schedule. Accordingly, the Board adopts the procedural schedule as previously proposed in Decision No. 3. Under the procedural schedule adopted by the Board: Any person who wishes to participate in this proceeding as a POR must file, no later than January 25, 2008, a notice of intent to participate; descriptions of anticipated responsive applications (including inconsistent applications) and any petitions for waiver or clarification with respect to such applications are also due by January 25, 2008; applicants shall file a proposed SIP with SEA and FRA by February 4, 2008; all environmental comments must also be filed by February 4, 2008, addressed to the attention of SEA; responsive applications, requests for conditions, and any other evidence and argument in opposition to the application, including filings by DOJ and DOT, must be filed by March 4, 2008; replies to responsive applications, requests for conditions, and other opposition, and rebuttal in support of the application must be filed by April 18, 2008; DOJ and DOT will be allowed to file, on the response due date (here, April 18), their comments in response to the comments of other parties, and Applicants will be allowed to file a response to any such comments filed by DOJ and/or DOT by April 25, 2008; rebuttals in support of responsive applications, requests for conditions, and other opposition must be filed by May 19, 2008; final briefs, if any, will be due by July 2, 2008. Under this schedule, a public hearing or oral argument may be held on a date to be determined by the Board. The Board will issue its final decision by September 30, 2008, and that decision will be effective October 30, 2008. For further information respecting dates, see Appendix A (Procedural Schedule). *Notice of Intent to Participate.* Any person who wishes to participate in this proceeding as a POR must file with the Board, no later than January 25, 2008, a notice of intent to participate, accompanied by a certificate of service indicating that the notice has been properly served on the Secretary of Transportation, the Attorney General of the United States, Mr. Hynes (representing CPRC), and Mr. Sippel (representing DM&E). Notices of intent to participate received to date have been compiled in a preliminary service list. Parties who have already submitted a notice of intent to participate are not required to resubmit an additional notice. If a request is made in the notice of intent to participate to have more than one name added to the service list as a POR representing a particular entity, the extra name will be added to the service list as a “Non-Party.” The final list will reflect the Board's policy of allowing only one official representative per party to be placed as a POR on the service list, as specified in Press Release No. 97-68 dated August 18, 1997, announcing the implementation of the Board's “One Party-One Representative” policy for service lists. Any person designated as a Non-Party will receive copies of Board decisions, orders, and notices but not copies of official filings. Persons seeking to change their status must accompany that request with a written certification that he or she has complied with the service requirements set forth at 49 CFR 1180.4 and any other requirements set forth in this decision. *Service List Notice.* The Board will serve, as soon after January 25, 2008, as practicable, a notice containing the official service list (the service-list notice). Parties should review the preliminary service list, in Decision No. 4, served on December 27, 2007, and notify the Board of any corrections. Each POR will be required to serve upon all other PORs, within 10 days of the service date of the service-list notice, copies of all filings previously submitted by that party (to the extent such filings have not previously been served upon such other parties). Each POR also will be required to file with the Board, within 10 days of the service date of the service-list notice, a certificate of service indicating that the service required by the preceding sentence has been accomplished. Every filing made by a POR after the service date of the service-list notice must have its own certificate of service indicating that all PORs on the service list have been served with a copy of the filing. Members of the United States Congress
(MOCs)and Governors
(GOVs)are not parties of record and need not be served with copies of filings, unless any Member or Governor has requested to be, and is designated as, a POR. *Environmental Comments.* All environmental comments must be filed by February 4, 2008, and addressed to the attention of SEA. *Descriptions of Anticipated Responsive Applications and Petitions for Waiver or Clarification.* Descriptions of anticipated responsive, including inconsistent, applications and petitions for waiver or clarification with respect to such applications must be filed by January 25, 2008. *Responsive Applications, Requests for Conditions, and Other Opposition Evidence and Argument, Including Filings by DOJ and DOT.* All responsive applications, requests for conditions, and any other evidence and argument in opposition to the application, including filings by DOJ and DOT, must be filed by March 4, 2008. Protesting parties are advised that, if they seek either the denial of the application or the imposition of conditions upon any approval thereof, on the theory that approval (or approval without conditions) would harm competition and/or their ability to provide essential services, they must present substantial evidence in support of their positions. *See Lamoille Valley R.R. Co.* v. *ICC* , 711 F.2d 295 (D.C. Cir. 1983). *Replies to Responsive Applications, Requests for Conditions, and Other Opposition, and Rebuttal in Support of the Application.* Replies to responsive applications, requests for conditions, and other opposition, and rebuttal in support of the application must be filed by April 18, 2008. *Rebuttals in Support of Responsive Applications, Requests for Conditions, and Other Opposition.* Rebuttals in support of responsive applications, requests for conditions, and other opposition must be filed by May 19, 2008. *Final Briefs and Public Hearing/Oral Argument.* Final briefs, if any, will be due by July 2, 2008. The Board may hold a public hearing or an oral argument in this proceeding on a date to be determined by the Board. *Discovery.* Discovery may begin immediately. The parties are encouraged to resolve all discovery matters expeditiously and amicably. *Environmental Matters.* Under both the regulations of the Council on Environmental Quality
(CEQ)implementing the National Environmental Policy Act of 1969, 42 U.S.C. 4321 *et seq.* (NEPA), and the Board's own environmental rules, actions whose environmental effects are ordinarily insignificant may be excluded from NEPA review across the board, without a case-by-case review. Such activities are said to be covered by a “categorical exclusion,” which CEQ defines at 40 CFR 1508.4 as: [A] category of actions which do not individually or cumulatively have a significant effect on the human environment and which have been found to have no effect in procedures adopted by a federal agency in implementation of these regulations * * * and for which, therefore, neither an environmental assessment nor an environmental impact statement is required. An agency's procedures for categorical exclusions “shall provide for extraordinary circumstances in which a normally excluded action may have a significant environmental effect,” thus requiring preparation of either an Environmental Assessment
(EA)or an Environmental Impact Statement (EIS). *Id. See also* 49 CFR 1105.6(d). But absent extraordinary circumstances, once a project is found to fit within a categorical exclusion, no further NEPA procedures are warranted. In its environmental rules, the Board has promulgated various categorical exclusions. As pertinent here, a rail line acquisition is a classification of action that normally requires no environmental review if certain thresholds would not be exceeded. 2 *See* 49 CFR 1105.6(c)(2)(i). The Board's regulations also provide that historic review normally is not required for acquisitions where there will be no significant change in operations and properties 50 years old and older will not be affected. *See* 49 CFR 1105.8. 2 The thresholds differ depending on whether a rail line segment is in an area designated as in “attainment” or “nonattainment” with the National Ambient Air Quality Standards established under the Clean Air Act. For rail lines located in attainment areas, environmental documentation normally will be prepared if the proposed action would result in
(1)an increase of at least 8 trains per day,
(2)an increase in rail traffic of at least 100 percent (measured in annual gross ton miles), or
(3)an increase in carload activity at rail yards of at least 100 percent. *See* 49 CFR 1105.7(e)(5)(i). For rail lines in nonattainment areas, environmental documentation typically is required when the proposed action would result in
(1)an increase of at least 3 trains per day,
(2)an increase in rail traffic of at least 50 percent (measured in annual gross ton miles), or
(3)an increase in carload activity at rail yards of at least 20 percent. *See* 49 CFR 1105.7(e)(5)(ii). *The Proposed Acquisition.* Applicants assert in their application that most of the rail lines of DME and CPR are located in attainment areas. 3 They project that the proposed transaction would not increase the level of train operations by more than 1 additional train per day along any segment of the combined CPR-DME system over the next 5 years (by 2012), 4 and therefore maintain that the 3 or 8-train-per-day threshold in the Board's environmental rules would not be met in this case. 5 Applicants assert that their traffic projections account for both
(1)traffic that would move beyond DME's service territory on CPR's lines, and
(2)projected growth in rail traffic on certain segments of DME lines that would likely occur in any case (e.g., anticipated growth of ethanol production). 3 According to Applicants, the only nonattainment areas where traffic might change as a result of the proposed transaction are in the following counties: Cook and Lake Counties, IL; Lake and Porter Counties, IN; Kenosha, Milwaukee, Racine, and Waukesha Counties, WI; and Lenawee, Monroe, Washtenaw, and Wayne Counties, MI. 4 Applicants project an increase of 1.5 trains per day with an empty back haul. 5 Indeed, Applicants state that there could be a reduction in train activity along certain segments as traffic moving in shorter trains run by DME today between Huron, SD, and Chicago (via Owatonna, MN, Nora Springs, IA, and Dubuque) could be consolidated with CPR traffic at Minnesota City and moved to/from Chicago in existing Soo trains that operate between Minneapolis/St. Paul and Chicago. Applicants also project only small increases in annual gross ton miles as a result of the proposed transaction, which would be well below the thresholds for preparation of environmental documentation. For example, Applicants maintain that the proposed acquisition would result in an increase of 5,800 carloads of “extended haul” traffic by the year 2010. All of this increase, Applicants state, would occur on the lines of CPR (either on Soo's lines east of Chicago, or its lines north of Minneapolis/St. Paul). According to Applicants, this modest traffic increase would translate into an increase of about 0.5 million gross ton miles, less than a 50 or 100 percent increase in gross ton miles over any portion of Applicants' rail lines. In addition, Applicants project only a modest increase by 2010 in gross ton miles over CPR's line between Milwaukee and Chicago as a result of the consolidation of DM&E carloads at Minnesota City onto existing CPR trains that operate between Minneapolis/St. Paul and Chicago. Further, Applicants contend that, even if the projected traffic growth that likely would occur regardless of this proposal were considered, the CPR line would only see an increase of about 17 percent (about 503 million gross ton miles), and the increase on the DME lines would be about 8.4 percent in gross ton miles between Davis Junction, IL, and Chicago (approximately 153 million gross ton miles). Finally, Applicants anticipate only minor increases in rail yard activity. *Historic Review.* According to Applicants, the proposed transaction would not involve any line abandonments or elimination of duplicative rail facilities. Any future line abandonment by Applicants would require Board authorization or exemption. Furthermore, Applicants state that they have no new plans to alter or dispose of properties 50 or more years old. 6 6 Applicants note that CPR would make available to DM&E $300 million to upgrade and rehabilitate its tracks, structures (bridges) and rail facilities. Applicants maintain, however, that the work funded by this investment relates to rail facility improvements that already have been the subject of extensive environmental and historic review by the Board in connection with the DM&E Powder River Basin construction project, authorizing DM&E to build a new 280-mile rail line extension of its current system to reach the PRB area of Wyoming. Applicants note that the work to be funded by CPR would involve substantially the same type of work, on the same properties, that was reviewed and is being addressed pursuant to the Programmatic Agreement for the DM&E PRB construction case, which sets forth the historic review process for both DM&E's new line and the rehabilitation of DM&E's existing line in South Dakota and Minnesota. Thus, Applicants argue, there is no need for a separate, duplicative historical review for the planned rail line upgrades related to this case. Other Actions 1. *The DM&E PRB Rail Line.* In 2006, DM&E obtained authority to build and operate its new rail line into the PRB. 7 Applicants argue that because the Board has already fully considered the environmental impacts of the construction and operation of that line in *DM&E PRB Construction* —in an environmental review process that encompassed the rehabilitation of DM&E's existing lines in South Dakota and Minnesota—there is no need for a further environmental review of the same lines considered in *DM&E PRB Construction* here. 7 *See Dakota, MN & Eastern RR—Construction—Powder River Basin* , 3 S.T.B. 847
(1998)(preliminary consideration); *Dakota, MN & Eastern RR—Construction—Powder River Basin* , 6 S.T.B. 8
(2002)(first approval), *remanded sub nom* . *Mid States Coalition for Progress* v. *STB* , 345 F.3d 520 (8th Cir. 2003) (requiring further consideration of four environmental issues), reauthorized *Dakota, Minnesota & Eastern Railroad Corporation Construction into the Powder River Basin* , STB Finance Docket No. 33407 (STB served Feb. 15, 2006), *aff'd* , *Mayo Foundation* v. *STB* , 472 F.3d 545 (8th Cir. 2006) (referred to as *DM&E PRB Construction* ). 2. *The Movement of DM&E Coal Trains Over the Lines of IC&E and CPR.* Applicants note that in a separate proceeding the Board previously imposed a condition prohibiting the movement of DM&E's PRB coal trains over IC&E's rail lines until an environmental review of the potential impacts of such operations was conducted. 8 Subsequently, the Board determined that an EIS would be needed to comply with this condition. 9 At the request of DM&E, preparation of that EIS was put on hold. 8 *Iowa, Chicago & Eastern Railroad Corporation—Acquisition and Operation Exemption—Lines of I&M Rail Link, LLC* , STB Finance Docket No. 34177 (STB served July 22, 2002), *modified* (STB served Oct. 18, 2006) ( *IC&E* ). 9 *See IC&E* ; STB Press Release No. 07-07, available on the Board's Web site. Applicants assert that it would be appropriate to continue to defer preparation of that EIS because it is not possible at this time to evaluate any potential environmental issues that might be associated with the transportation of DM&E PRB coal traffic over the lines of IC&E and/or CPR. Applicants explain that DM&E has not yet secured contracts with shippers for the movement of PRB coal over the newly authorized DM&E PRB line, and that Applicants have not yet made a decision to build it. According to Applicants, in the absence of definitive transportation commitments, the identity of the CPR-DME system's future coal customers, the volume of coal that would be transported to particular locations, the destinations to which such shipments would move, and the routing of such shipments beyond DM&E's lines remain speculative. Without such information, Applicants state, it would not be possible for the Board to evaluate in a meaningful fashion the potential environmental impacts of such future coal transportation operations. At the same time, Applicants recognize the Board's obligation under NEPA to examine the environmental impacts of the transportation of DM&E PRB coal trains over the lines of IC&E and/or CPR. Accordingly, Applicants propose that the Board impose a condition on any decision authorizing this transaction that would defer any required analysis of the environmental impacts of the movement of DM&E PRB coal trains over the lines of IC&E and/or CPR until such time as more definitive information regarding the likely volume and routing of those trains becomes available. On October 19, 2007, Winona requested that the Board impose environmental mitigation for Winona as part of this acquisition proceeding, or alternatively, that it impose mitigation for Winona in connection with the currently deferred analysis of the movement of DM&E PRB coal trains over the lines of IC&E and/or CPR. On October 24, 2007, BNSF submitted comments asserting that the application is incomplete because it fails to address the environmental effects of CPR's acquisition of DM&E's authority to construct a new rail line into the PRB. Further, according to BNSF, the Board would not meet its NEPA obligations by deferring its environmental review of the effects of DM&E PRB coal traffic operating over the IC&E and/or CPR lines. BNSF asserts that the entire acquisition—both rail traffic moving now and DM&E PRB coal traffic that might eventually move over IC&E and/or CPR lines—should be examined now and together. On October 24, 2007, as noted previously, Mayo Clinic filed a reply alleging that the Board should compel the Applicants to provide “meaningful information” that addresses the future movement of DM&E PRB coal trains through Rochester, MN, where the Mayo Clinic is located; that now is the time to address the potential increase in DM&E PRB coal traffic (and ethanol traffic) moving through Rochester; and that the Board should require the Applicants to prepare a SIP pursuant to the Board's regulations at 49 CFR 1106. On October 29, 2007, Applicants filed a reply to BNSF's environmental comments. *Preliminary Conclusions.* Based on the information provided to date and after consultations with SEA, the Board preliminarily concludes that, for the reasons discussed below, the environmental review process proposed by Applicants would allow the Board to meet its NEPA obligations. Specifically, the Board preliminarily determines that an environmental and historic review for the proposed acquisition is not warranted because it does not appear that the thresholds triggering an environmental review would be met, and there is nothing in the available environmental information to indicate the potential for significant environmental impacts resulting from the proposed acquisition. With respect to the handling of DM&E PRB coal trains over the lines of IC&E and/or CPR, the Board preliminarily concludes, based on the available information, that there is no need to conduct any further environmental review here of the rail lines considered in *DM&E PRB Construction* , 10 and that the Board should defer the preparation of environmental documentation on routing DM&E PRB coal traffic over the rail lines of IC&E and/or CPR (including the consideration of mitigation for Winona) until more information is available. 10 Mayo Clinic's suggestion that the Board should look again at DM&E's movement of PRB coal traffic through Rochester ignores the extensive environmental review of those movements (at traffic levels of up to 100 million tons of PRB coal per year) that has already taken place. *See DM&E PRB Construction* (imposing extensive mitigation for Rochester and the Mayo Clinic to minimize the potential impacts of that traffic). Moreover, even if there is a potential for more than the 100 million tons of coal per year analyzed in *DM&E PRB Construction* , there is no basis for Mayo Clinic's assumption that all of this traffic would move through Rochester, given the numerous interchange points on DM&E's existing system. DM&E's movement of ethanol would likely take place regardless of the proposed acquisition and, therefore, does not require NEPA review in this case or the *DM&E PRB Construction* case. BNSF's assertion that the application is incomplete because it does not adequately describe the potential environmental effects of running DM&E PRB coal trains over the IC&E and/or CPR rail lines ignores the fact that sufficient information does not appear to be currently available to conduct a meaningful environmental review now. Applicants state that they have not yet made a decision to build the new PRB line approved in DM&E PRB Construction. They note that numerous steps (including acquisition of the right-of-way and agreements with PRB mines) would have to be completed before the project would be justified. Moreover, it does not appear that there would be any harm to interested persons, potentially affected communities, or to the environment by deferring the environmental review because the Board would preclude Applicants from operating any DM&E PRB coal trains over lines of IC&E and/or CPR until the Board conducts an appropriate environmental review and issues a final decision addressing the impacts of such coal train operations and allowing such operations to begin. 11 11 The Board's environmental review process will provide ample opportunity for all to participate. Specifically, Applicants proposed two environmental conditions to address the potential movement of DM&E PRB coal trains operating over the lines of IC&E and/or CPR. After reviewing the application, the Board preliminarily intends to impose the following modified conditions on any decision authorizing the proposed transaction: Applicants may not transport coal unit trains originating on the new rail line approved for construction in *DM&E PRB Construction* over lines currently operated by IC&E and/or CPR until the Board has prepared an Environmental Impact Statement, and has issued a final decision addressing the environmental impacts of such coal operations and allowed such operations to begin. Prior to commencing any construction of the new rail line approved in *DM&E PRB Construction* , Applicants shall notify the Board of Applicants' intent to begin construction, and shall submit to the Board reasonably foreseeable projections regarding the movement of DM&E PRB coal traffic on the rail lines of IC&E and/or CPR, so that the environmental review can begin. Finally, regarding Mayo Clinic's argument that preparation of a SIP is warranted here, Applicants expressly state in their application that they intend to prepare a SIP and submit it to the Board. Under the Board's SIP rules, Applicants are to file a proposed SIP with SEA and FRA within 60 days of the filing date of the application, setting out how they intend to ensure that safe operations are maintained throughout the acquisition implementation process. 49 CFR 1106.4(a). Accordingly, the procedural schedule requires the proposed SIP to be filed no later than February 4, 2008. The proposed SIP is normally part of the environmental record, is reviewed by SEA, and is put out for public review and comment during the environmental review process. 49 CFR 1106.4(b). If the Board authorizes the proposed transaction and adopts the SIP, the Board requires compliance with the SIP as a condition to its authorization. 49 CFR 1106.4(b)(4). The Board's rules also specifically provide that, in cases where no formal environmental review is required under NEPA, the Board will develop appropriate case-specific SIP procedures based on the facts and circumstances presented. 49 CFR 1106.4(c). Thus, the SIP process will take place here whether or not preparation of an EA or EIS is found to be warranted for the proposed transaction. The Board is requesting comments from all interested parties on these preliminary determinations regarding how to handle the environmental review here. Environmental comments must be submitted to the Board by February 4, 2008, addressed to the attention of SEA. SEA will make a final recommendation to the Board regarding the level of environmental review that is needed to meet the Board's NEPA responsibilities, and how to conduct the SIP process, after considering any public comments received during the environmental comment period. *Filing/Service Requirements.* Persons wishing to participate in this proceeding must file with the Board and serve on other parties: a notice of intent to participate (due by January 25, 2008) and a certificate of service indicating service of prior pleadings on persons designated as PORs on the service-list notice (due by the 10th day after the service date of the service-list notice). Such persons may file responsive applications, requests for conditions, and any other evidence and argument in opposition to the application (due by March 4); and any replies to responsive applications, etc. (due by April 18), any rebuttal in support of responsive applications, etc. (due by May 19), and any final briefs (due by July 2). *Filing Requirements.* Any document filed in this proceeding must be filed either via the Board's e-filing format or in the traditional paper format. Any person using e-filing should attach a document and otherwise comply with the instructions found on the Board's Web site at *http://www.stb.dot.gov* at the “E-FILING” link. Any person filing a document in the traditional paper format should send an original and 10 paper copies of the document (and also an electronic version) to: Surface Transportation Board, 395 E Street, SW., Washington, DC 20423-0001. *Service Requirements.* One copy of each document filed in this proceeding must be sent to each of the following (any copy may be sent by e-mail only if service by e-mail is acceptable to the recipient):
(1)Secretary of Transportation, 1200 New Jersey Avenue, SE., Washington, DC 20590;
(2)Attorney General of the United States, c/o Assistant Attorney General, Antitrust Division, Room 3109, Department of Justice, Washington, DC 20530;
(3)Terence M. Hynes (representing CPRC), Sidley Austin LLP, 1501 K Street, NW., Washington, DC 20005;
(4)William C. Sippel (representing DM&E), Fletcher & Sippel, 29 North Wacker Drive, Suite 920, Chicago, IL 60606; and
(5)any other person designated as a POR on the service-list notice. *Service of Decisions, Orders, and Notices.* The Board will serve copies of its decisions, orders, and notices only on those persons who are designated on the official service list as either POR, MOC, GOV, or Non-Party. All other interested persons are encouraged either to secure copies of decisions, orders, and notices via the Board's Web site at *http://www.stb.dot.gov* under “E-LIBRARY/Decisions & Notices” or to make advance arrangements with the Board's copy contractor, ASAP Document Solutions (mailing address: Suite 103, 9332 Annapolis Rd., Lanham, MD 20706; e-mail address: *asapdc@verizon.net* ; telephone number: 202-306-4004), to receive copies of decisions, orders, and notices served in this proceeding. ASAP Document Solutions will handle the collection of charges and the mailing and/or faxing of decisions, orders, and notices to persons who request this service. *Access to Filings.* An interested person does not need to be on the service list to obtain a copy of the primary application or any other filing made in this proceeding. Under the Board's rules, any document filed with the Board (including applications, pleadings, etc.) shall be promptly furnished by the filing party to interested persons on request, unless subject to a protective order. 49 CFR 1180.4(a)(3). The primary application and other filings in this proceeding will also be available on the Board's Web site at *http://www.stb.dot.gov* under “E-LIBRARY/Filings.” This action will not significantly affect either the quality of the human environment or the conservation of energy resources. *It is ordered:* 1. The application in STB Finance Docket No. 35081 is accepted for consideration. 2. The parties to this proceeding must comply with the procedural schedule adopted by the Board in this proceeding as shown in Appendix A. 3. The parties to this proceeding must comply with the procedural requirements described in this decision. 4. This decision is effective on January 4, 2008. Decided: December 21, 2007. By the Board, Chairman Nottingham, Vice Chairman Buttrey, and Commissioner Mulvey. Vernon A. Williams, Secretary. Appendix A: Procedural Schedule September 10, 2007 Motion for Protective Order filed. September 21, 2007 Protective Order issued. October 5, 2007 Prefiling notification and Motion to Establish Procedural Schedule filed. November 8, 2007 Notice of receipt of prefiling notification published in the Federal Register . November 29, 2007 Proposed procedural schedule published in the Federal Register . December 5, 2007 Application filed. January 4, 2008 Board notice of acceptance of application to be published in the Federal Register . January 25, 2008 Notices of intent to participate in this proceeding due. Descriptions of anticipated responsive applications (including inconsistent applications) due. Petitions for waiver or clarification with respect to such applications due. February 4, 2008 Proposed SIP to be filed with SEA and FRA. Environmental comments due, addressed to the attention of SEA. March 4, 2008 All responsive applications, requests for conditions, and any other evidence and argument in opposition to the application, including filings of DOJ and DOT, due. April 18, 2008 Replies to responsive applications, requests for conditions, and other opposition due. Rebuttal in support of the application due. Response of DOJ and DOT to other parties' comments due. April 25, 2008 Applicants' response to responsive comments of DOJ and DOT due. May 19, 2008 Rebuttals to responsive applications, requests for conditions, and other opposition due. TBD A public hearing or oral argument may be held. July 2, 2008 Final briefs, if any, due. September 30, 2008 Date of service of final decision. October 30, 2008 Effective date of final decision. [FR Doc. E7-25480 Filed 1-3-08; 8:45 am] BILLING CODE 4915-01-P DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Docket No. AB-1014] Denver & Rio Grande Railway Historical Foundation—Adverse Abandonment—in Mineral County, CO On December 17, 2007, the City of Creede, CO (the City), filed an application under 49 U.S.C. 10903, requesting that the Surface Transportation Board (Board) authorize the third-party or adverse abandonment of approximately 1.0 mile of rail line, extending from near milepost 320.9 to near milepost 319.9, a run-around track, and a spur track (the Line), all located in the City, in Mineral County, CO. The Line is owned by the Denver & Rio Grande Railway Historical Foundation (D&RGHF). 1 The Line traverses United States Postal Service Zip Code 81130, and includes no stations. 1 D&RGHF acquired the Line through an offer of financial assistance (OFA). *See Union Pacific Railroad Company—Abandonment Exemption—in Rio Grande and Mineral Counties, CO,* STB Docket No. AB-33 (Sub-No. 132X) (STB served May 11, 1999). The City states that there has been no rail service or request for service over the Line since approximately 1970 and claims that there is no foreseeable need for rail service. Additionally, the City asserts that, since D&RGHF acquired the Line, D&RGHF has yet to identify any shippers or operate any trains. In a decision served in this proceeding on October 18, 2007, the City was granted exemptions from several statutory provisions as well as waivers of certain Board regulations at 49 CFR 1152 that were not relevant to its adverse abandonment application or that sought information not available to it. Specifically, the City was granted a fee waiver; waivers of and exemptions from the notice requirements at 49 CFR 1152.20(a)(2), 49 U.S.C. 10903(a)(3)(D), 49 CFR 1152.20(a)(3), 49 U.S.C. 10903(a)(3)(B), and 49 CFR 1152.21; waivers of and exemptions from the application requirements of 49 CFR 1152.22(a)(5), 49 U.S.C. 10903(c), 49 CFR 1152.22(b) (except that the City must submit evidence on the physical condition of the Line other than information regarding cost of deferred maintenance and needed rehabilitation), 49 CFR 1152.22(d), and 49 CFR 1152.29(e)(2); waivers of and exemptions from the OFA requirements and public use procedures at 49 CFR 1152.27-28 and 49 U.S.C. 10904-05; and waiver of portions of the **Federal Register** notice language requirements at 49 CFR 1152.22(i). A portion of the track is on a Federally issued right-of-way. According to the City, the land underlying the Federal right-of-way in the city limits was deeded to the City by the United States in 1901, subject to the right-of-way grant. The City states that it also owns the land adjacent to the Line and asserts that it has reversionary interests in the Line under state law. Any documentation in the City's possession will be made available promptly to those requesting it. The City states that it filed its entire case for abandonment with its application. The interests of affected railroad employees, if there are any employees on the Line, will be protected by the conditions set forth in *Oregon Short Line R. Co.—Abandonment—Goshen,* 360 I.C.C. 91 (1979). Any interested person may file written comments concerning the proposed abandonment or protests (including the protestant's entire opposition case), by January 31, 2008. The City's reply is due by February 15, 2008. Because this is an adverse abandonment proceeding, OFAs and public use requests are not appropriate and will not be entertained. The Board has not yet had occasion to decide whether the issuance of a certificate of interim trail use in an adverse abandonment would be consistent with the grant of such an application. Accordingly, any request for a trail use condition under 16 U.S.C. 1247(d) (49 CFR 1152.29) must be filed by January 31, 2008, and should address that issue. Each trail use request must be accompanied by a $200 filing fee. *See* 49 CFR 1002.2(f)(27). Persons opposing the proposed abandonment who wish to participate actively and fully in the process should file a protest. Persons who may oppose the abandonment but who do not wish to participate fully in the process by submitting verified statements of witnesses containing detailed evidence should file comments. Persons seeking information concerning the filing of protests should refer to 49 CFR 1152.25. All filings in response to this notice must refer to STB Docket No. AB-1014 and must be sent to:
(1)Surface Transportation Board, 395 E Street, SW., Washington, DC 20423-0001;
(2)Ronald M. Johnson, Akin, Gump, Strauss, Hauer & Feld LLP, 1333 New Hampshire Ave., NW., Washington, DC 20036; and
(3)Clyde Dooley, City Manager, City of Creede, P.O. Box 457, Creede, CO 81130. Filings may be submitted either via the Board's e-filing format or in the traditional paper format. Any person using e-filing should comply with the instructions found on the Board's *http://www.stb.dot.gov* Web site, at the “E-FILING” link. Any person submitting a filing in the traditional paper format should send the original and 10 copies of the filing to the Board with a certificate of service. Except as otherwise set forth in 49 CFR part 1152, every document filed with the Board must be served on all parties to this adverse abandonment proceeding. 49 CFR 1104.12(a). An environmental assessment
(EA)(or environmental impact statement (EIS), if necessary) prepared by the Board's Section of Environmental Analysis
(SEA)will be served upon all parties of record and upon any agencies or other persons who commented during its preparation. Any other persons who would like to obtain a copy of the EA (or EIS) may contact SEA. EAs in these abandonment proceedings normally will be made available within 33 days of the filing of the application. The deadline for submission of comments on the EA will generally be within 30 days of its service. The comments received will be addressed in the Board's decision. A supplemental EA or EIS may be issued where appropriate. Persons seeking further information concerning abandonment procedures may contact the Board's Office of Governmental and Public Affairs at
(202)245-0230 or refer to the full abandonment/discontinuance regulations at 49 CFR 1152. Questions concerning environmental issues may be directed to SEA at
(202)245-0305. [Assistance for the hearing impaired is available through the Federal Information Relay Service
(FIRS)at 1-800-877-8339.] Board decisions and notices are available on our Web site at *http://www.stb.dot.gov.* Decided: December 28, 2007. By the Board, Joseph H. Dettmar, Acting Director, Office of Proceedings. Vernon A. Williams, Secretary. [FR Doc. E7-25588 Filed 1-3-08; 8:45 am] BILLING CODE 4915-01-P DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 34554 (Sub-No. 8)] Union Pacific Railroad Company—Temporary Trackage Rights Exemption—BNSF Railway Company BNSF Railway Company (BNSF), pursuant to a modified written trackage rights agreement entered into between BNSF and Union Pacific Railroad Company (UP), has agreed to extend the expiration date of the local trackage rights granted to UP 1 over BNSF's line of railroad extending from BNSF milepost 579.3 near Mill Creek, OK, to BNSF milepost 631.1 near Joe Junction, TX, a distance of approximately 51 miles. 2 1 UP submits that the trackage rights being granted here are only temporary rights, but, because they are “local” rather than “overhead” rights, they do not qualify for the Board's class exemption for temporary trackage rights at 49 CFR 1180.2(d)(8). *See Railroad Consolidation Procedures,* 6 S.T.B. 910 (2003). Therefore, UP and BNSF concurrently have filed a petition for partial revocation of this exemption in STB Finance Docket No. 34554 (Sub-No. 9), *Union Pacific Railroad Company—Temporary Trackage Rights Exemption—BNSF Railway Company,* wherein UP, with the support of BNSF, requests that the Board permit the proposed local trackage rights arrangement described in the present proceeding to expire on or about December 31, 2008. That petition will be addressed by the Board in a separate decision. 2 The original trackage rights granted in *Union Pacific Railroad Company—Trackage Rights Exemption—The Burlington Northern and Santa Fe Railway Company,* STB Finance Docket No. 34554 (STB served Oct. 7, 2004), also extended from BNSF milepost 579.3 near Mill Creek, OK, to BNSF milepost 631.1 near Joe Junction, TX. By decisions served on November 24, 2004, in STB Finance Docket No. 34554 (Sub-No. 1), on March 25, 2005, in STB Finance Docket No. 34554 (Sub-No. 3), on March 23, 2006, in STB Finance Docket No. 34554 (Sub-No. 5), and on March 13, 2007, in STB Finance Docket No. 34554 (Sub-No. 7), the Board granted exemptions to permit the trackage rights authorized in STB Finance Docket No. 34554 and extended in STB Finance Docket No. 34554 (Sub-No. 2), served on February 11, 2005, in STB Finance Docket No. 34554 (Sub-No. 4), served on March 3, 2006, and in STB Finance Docket No. 34554 (Sub-No. 6), served on January 12, 2007, to expire. At the time of the last extension, it was anticipated by the parties that the rights would expire on or about December 31, 2007. However, this authority has not yet been exercised. The transaction is scheduled to be consummated on January 20, 2008. The purpose of this transaction is to modify the temporary trackage rights exempted in STB Finance Docket No. 34554 (Sub-No. 6) to further extend the expiration date to on or before December 31, 2008. The modified trackage rights will permit UP to continue to move loaded and empty ballast trains for use in its maintenance-of-way projects. As a condition to this exemption, any employees affected by the trackage rights will be protected by the conditions imposed in *Norfolk and Western Ry. Co.—Trackage Rights—BN* , 354 I.C.C. 605 (1978), as modified in *Mendocino Coast Ry., Inc.—Lease and Operate,* 360 I.C.C. 653 (1980). This notice is filed under 49 CFR 1180.2(d)(7). If it contains false or misleading information, the exemption is void *ab initio* . Petitions to revoke the exemption under 49 U.S.C. 10502(d) may be filed at any time. The filing of a petition to revoke will not automatically stay the effectiveness of the exemption. Stay petitions must be filed by January 11, 2007 (at least 7 days before the exemption becomes effective). An original and 10 copies of all pleadings, referring to STB Finance Docket No. 34554 (Sub-No. 8), must be filed with the Surface Transportation Board, 395 E Street, SW., Washington, DC 20423-0001. In addition, one copy of each pleading must be served on Gabriel S. Meyer, 1400 Douglas Street, STOP 1580, Omaha, NE 68179. Board decisions and notices are available on our Web site at *http://www.stb.dot.gov* . Decided: December 27, 2007. By the Board, Joseph H. Dettmar, Acting Director, Office of Proceedings. Vernon A. Williams, Secretary. [FR Doc. E7-25529 Filed 1-3-08; 8:45 am] BILLING CODE 4915-01-P DEPARTMENT OF THE TREASURY Fiscal Service Surety Companies Acceptable on Federal Bonds: ULLICO Casualty Company AGENCY: Financial Management Service, Fiscal Service, Department of the Treasury. ACTION: Notice. SUMMARY: This is Supplement No. 5 to the Treasury Department Circular 570, 2007 Revision, published July 2, 2007, at 72 FR 36192. FOR FURTHER INFORMATION CONTACT: Surety Bond Branch at
(202)874-6850. SUPPLEMENTARY INFORMATION: A Certificate of Authority as an acceptable surety on Federal bonds is hereby issued under 31 U.S.C. 9305 to the following company: ULLICO Casualty Company (NAIC # 37893). Business Address: 1625 Eye St., NW., Washington DC 20006. Phone:
(202)682-4992. Underwriting Limitation b/: $5,819,000. Surety Licenses c/: AL, AK, AZ, AR, CA, CO, CT, DE, DC, FL, GA, HI, ID, IL, IN, IA, KS, KY, LA, MD, MA, MI, MN, MS, MO, MT, NE, NV, NJ, NM, NY, NC, ND, OH, OK, OR, PA, PR, SC, SD, TN, TX, UT, VT, VA, VI, WA, WV, WI, WY. Incorporated In: Delaware. Federal bond-approving officers should annotate their reference copies of the Treasury Circular 570 (“Circular”), 2007 Revision, to reflect this addition. Certificates of Authority expire on June 30th each year, unless revoked prior to that date. The Certificates are subject to subsequent annual renewal as long as the companies remain qualified ( *see* 31 CFR part 223). A list of qualified companies is published annually as of July 1 in the Circular, which outlines details as to underwriting limitations, areas in which companies are licensed to transact surety business, and other information. The Circular may be viewed and downloaded through the Internet at *http://www.fms.treas.gov/c570.* Questions concerning this Notice may be directed to the U.S. Department of the Treasury, Financial Management Service, Financial Accounting and Services Division, Surety Bond Branch, 3700 East-West Highway, Room 6F01, Hyattsville, MD 20782. Dated: December 21, 2007. Vivian L. Cooper, Director, Financial Accounting and Services Division. [FR Doc. 07-6278 Filed 1-3-08; 8:45 am]
Connectionstraces to 8
49 references not yet in our index
  • 49 CFR 195.452(h)
  • 49 CFR 195.583
  • 49 CFR 192.111
  • 49 CFR 192.201
  • 49 CFR 192.619
  • 49 CFR 192.505
  • 49 CFR 192.611
  • 49 CFR 1.53
  • 49 USC 11321-26
  • 49 CFR 1180.2(b)
  • 49 CFR 1105.7(e)(5)
  • 49 CFR 1105.6(b)(4)
  • 49 CFR 1106
  • 49 CFR 1180.1(f)(3)
  • 609 F.2d 83
  • 49 CFR 1180
  • 49 CFR 1180.4
  • 711 F.2d 295
  • 40 CFR 1508.4
  • 49 CFR 1105.6(d)
  • 49 CFR 1105.6(c)(2)(i)
  • 49 CFR 1105.8
  • 49 CFR 1105.7(e)(5)(i)
  • 49 CFR 1105.7(e)(5)(ii)
  • 345 F.3d 520
  • 472 F.3d 545
  • 49 CFR 1106.4(a)
  • 49 CFR 1106.4(b)
  • 49 CFR 1106.4(b)(4)
  • 49 CFR 1106.4(c)
  • 49 CFR 1180.4(a)(3)
  • 49 CFR 1152
  • 49 CFR 1152.20(a)(2)
  • 49 CFR 1152.20(a)(3)
  • 49 CFR 1152.21
  • 49 CFR 1152.22(a)(5)
  • 49 CFR 1152.22(b)
  • 49 CFR 1152.22(d)
  • 49 CFR 1152.29(e)(2)
  • 49 CFR 1152.27-28
+ 9 more
Citation graph
cites case law
Notices
Notice
F. App'x609 F.2d 83
F. App'x711 F.2d 295
F. App'x345 F.3d 520
F. App'x472 F.3d 545
Cites 57 · showing 12Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.