Notices. 30 Day Notice of Information Collection Under Review: Extension of a currently approved collection
10,516 words·~48 min read·
/register/2006/08/02/06-6669·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
BILLING CODE 4410-11-M DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Registration By Notice dated March 20, 2006 and published in the **Federal Register** on March 24, 2006, (71 FR 14948), Cerilliant API Services LLC, 811 Paloma Drive, Suite A, Round Rock, Texas 78664, made application to the Drug Enforcement Administration
(DEA)to be registered as a bulk manufacturer of the basic classes of controlled substances listed in Schedule I and II; and by letter to modify its name to Austin Pharma LLC. Subsequent to the publication of the Notice of Application, by letter, the company has also requested to withdraw thirty-five drug codes from their initial application request. Drug Schedule Marihuana
(7360)I Tetrahydrocannabinols
(7370)I Alphamethadol
(9605)I Methadone
(9250)II Methadone intermediate
(9254)II Levo-alphacetylmethadol
(9648)II Alfentanil
(9737)II Remifentanil
(9739)II Sufentanil
(9740)II Fentanyl
(9801)II The company plans to manufacture the listed controlled substances in bulk for distribution to its customers. In reference to drug code 7360 (Marihuana), the company plans to bulk manufacture cannabidiol as a synthetic intermediate. This controlled substance will be further synthesized to bulk manufacture a synthetic THC (7370). No other activity for this drug code is authorized for this registration. No comments or objections have been received. DEA has considered the factors in 21 U.S.C. 823(a) and determined that the registration of Cerilliant API Services LLC to manufacture the listed basic classes of controlled substances is consistent with the public interest at this time. DEA has investigated Cerilliant API Services LLC to ensure that the company's registration is consistent with the public interest. The investigation has included inspection and testing of the company's physical security systems, verification of the company's compliance with state and local laws, and a review of the company's background and history. Therefore, pursuant to 21 U.S.C. 823, and in accordance with 21 CFR 1301.33, the above named company is granted registration as a bulk manufacturer of the basic classes of controlled substances listed. Dated: July 26, 2006. Joseph T. Rannazzisi, Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration. [FR Doc. E6-12478 Filed 8-1-06; 8:45 am] BILLING CODE 4410-09-P DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application Pursuant to Section 1301.33(a) of Title 21 of the Code of Federal Regulations (CFR), this is notice that on June 22, 2006, Clariant LSM (Missouri) Inc., 2460 W. Bennett Street, or (P.O. Box 1246, zip 65801), Springfield, Missouri 65807-1229, made application by renewal to the Drug Enforcement Administration
(DEA)to be registered as a bulk manufacturer of the basic classes of controlled substances listed in Schedules II: Drug Schedule Methylphenidate
(1724)II Phenylacetone
(8501)II Methadone intermediate
(9254)II The company plans to manufacture the listed controlled substance in bulk for sale to its customer. Any other such applicant and any person who is presently registered with DEA to manufacture such a substance may file comments or objections to the issuance of the proposed registration pursuant to 21 CFR 1301.33(a). Any such written comments or objections being sent via regular mail should be addressed, in quintuplicate, to the Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration, Washington, DC. 20537, Attention: DEA **Federal Register** Representative/ODL; or any being sent via express mail should be sent to DEA Headquarters, Attention: DEA **Federal Register** Representative/ODL, 2401 Jefferson-Davis Highway, Alexandria, Virginia 22301; and must be filed no later than October 2, 2006. Dated: July 26, 2006. Joseph T. Rannazzisi, Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration. [FR Doc. E6-12455 Filed 8-1-06; 8:45 am] BILLING CODE 4410-09-P DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application Pursuant to Section 1301.33(a) Title 21 of the Code of Federal Regulations (CFR), this is notice that on June 27, 2006, Noramco Inc., 1440 Olympic Drive, Athens, Georgia 30601, made application by letter to the Drug Enforcement Administration
(DEA)for registration as a bulk manufacturer of basic drug code
(1724)methylphenidate. The company plans to bulk manufacture methylphenidate for a customer to use in the production of a controlled substance product. Any other such applicant and any person who is presently registered with DEA to manufacture such a substance may file comments or objections to the issuance of the proposed registration pursuant to 21 CFR 1301.33(a). Any such written comments or objections being sent via regular mail should be addressed, in quintuplicate, to the Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration, Washington, DC. 20537, Attention: DEA **Federal Register** Representative/ODL; or any being sent via express mail should be sent to DEA Headquarters, Attention: DEA Federal Representative/ODL, 2401 Jefferson-Davis Highway, Alexandria, Virginia 22301; and must be filed no later than October 2, 2006. Dated: July 26, 2006. Joseph T. Rannazzisi, Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration. [FR Doc. E6-12457 Filed 8-1-06; 8:45 am] BILLING CODE 4410-09-P DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application Pursuant to Section 1301.33(a) of Title 21 of the Code of Federal Regulations (CFR), this is notice that on February 19, 2006, Orasure Technologies, Inc., Lehigh University, Seeley G. Mudd-Building 6, Bethlehem, Pennsylvania 18015, made application by renewal, and by letter, to the Drug Enforcement Administration
(DEA)to be registered as a bulk manufacturer of the basic classes of controlled substances listed in Schedule I and II: Drug Schedule Lysergic acid diethylamide
(7315)I 4-Methoxyamphetamine
(7411)I Normorphine
(9313)I Tetrahydrocannabinols
(7370)I Alphamethadol
(9605)I Amphetamine
(1100)II Methamphetamine
(1105)II Cocaine
(9041)II Hydromorphone
(9150)II Benzoylecgonine
(9180)II Hydrocodone
(9193)II Morphine
(9300)II Oxycodone
(9143)II Meperidine
(9230)II Methadone
(9250)II Oxymorphone
(9652)II The company plans to manufacture the listed controlled substances in bulk to manufacture controlled substance derivatives. These derivatives will be used in diagnostic products created specifically for internal use only. Any other such applicant and any person who is presently registered with DEA to manufacture such a substance may file comments or objections to the issuance of the proposed registration pursuant to 21 CFR § 1301.33(a). Any such written comments or objections being sent via regular mail may be addressed, in quintuplicate, to the Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration, Washington, DC. 20537, Attention: DEA **Federal Register** Representative, Liaison and Policy Section (ODL); or any being sent via express mail should be sent to DEA Headquarters, Attention: DEA **Federal Register** Representative/ODL, 2401 Jefferson-Davis Highway, Alexandria, Virginia 22301; and must be filed no later than October 2, 2006. Dated: July 26, 2006. Joseph T. Rannazzisi, Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration. [FR Doc. E6-12459 Filed 8-1-06; 8:45 am] BILLING CODE 4410-09-P DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application Pursuant to Section 1301.33(a) of Title 21 of the Code of Federal Regulations (CFR), this is notice that on January 10, 2006, Siegfried (USA), Inc., Industrial Park Road, Pennsville, New Jersey 08070, made application by renewal to the Drug Enforcement Administration
(DEA)to be registered as a bulk manufacturer of the basic classes of controlled substances listed in Schedule II: Drug Schedule Amphetamine
(1100)II Methylphenidate
(1724)II Amobarbital
(2125)II Pentobarbital
(2270)II Secobarbital
(2315)II Glutethimide
(2550)II Codeine
(9050)II Oxycodone
(9143)II Hydromorphone
(9150)II Hydrocodone
(9193)II Methadone
(9250)II Methadone intermediate
(9254)II Dextropropoxyphene, bulk (non-dosage forms)
(9273)II Morphine
(9300)II The company plans to manufacture the listed controlled substances in bulk for distribution to its customers. Any other such applicant and any person who is presently registered with DEA to manufacture such a substance may file comments or objections to the issuance of the proposed registration pursuant to 21 CFR 1301.33(a). Any such written comments or objections being sent via regular mail may be addressed, in quintuplicate, to the Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration, Washington, DC 20537, Attention: DEA Federal Register Representative, Liaison and Policy Section (ODL); or any being sent via express mail should be sent to DEA Headquarters, Attention: DEA Federal Register Representative/ODL, 2401 Jefferson-Davis Highway, Alexandria, Virginia 22301; and must be filed no later than October 2, 2006. July 26, 2006. Joseph T. Rannazzisi, Deputy Assistant Administrator, Office of Diversion Control, Drug Enforcement Administration. [FR Doc. E6-12475 Filed 8-1-06; 8:45 am] BILLING CODE 4410-09-P DEPARTMENT OF JUSTICE Office of Justice Programs Bureau of Justice Assistance; Agency Information Collection Activities: Extension of a Currently Approved Collection; Comments Requested AGENCY: Office of Justice Programs, Department of Justice. ACTION: 30 Day Notice of Information Collection Under Review: Extension of a currently approved collection. Bureau of Justice Assistance Application Form: *Southwest Border Prosecution Initiative [OMB Number 1121-0270]* . The Department of Justice (DOJ), Office of Justice Programs
(OJP)has submitted the following information collection request to the Office of Management and Budget
(OMB)for review and approval in accordance with the Paperwork Reduction Act of 1995. The proposed collection information is published to obtain comments from the public and affected agencies. This proposed information collection was previously published in the **Federal Register** [Volume 71, Number 104, pages 30962-30963 on May 31, 2006,] allowing for a 60 day comment period. The purpose of this notice is to allow for an additional 30 days for public comment until September 1, 2006. This process is conducted in accordance with 5 CFR 1320.10. Written comments and/or suggestions regarding the item(s) contained in this notice, especially regarding the estimated public burden and associated response time, should be directed to the Office of Management and Budget, Office of Information and Regulatory Affairs, Attention: Department of Justice Desk Officer, Washington, DC 20530. Additionally, comments may be submitted to OMB via facsimile to
(202)395-7285. Comments may also be submitted to the M. Pressley, Bureau of Justice Assistance, Office of Justice Programs, U.S. Department of Justice, 810 7th Street, NW., Washington, DC 20531 via facsimile to
(202)514-1590. Written comments and/or suggestions from the public and affected agencies concerning the proposed collection of information should address one or more of the following four points:
(1)Evaluate whether the proposed collection of information is necessary for the proper performance of the function of the agency, including whether the information will have practical utility;
(2)Evaluate the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used;
(3)Enhance the quality, utility, and clarity of the information to be collected; and
(4)Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, *e.g.* , permitting electronic submission of responses. Overview of this information:
(1)*Type of information collection:* Extension of previously approved collection.
(2)*The title of the form/collection:* Bureau of Justice Assistance Application Form for the Southwest Border Prosecution Initiative.
(3)*The agency form number, if any and the applicable component of the Department sponsoring the collection:* None.
(4)*Affected public who will be asked or required to respond, as well as a brief abstract:* Primary: State, Local or Tribal government. *Other:* None. *Abstract:* The Southwest Border Prosecutor Initiative was enacted in FY 2002 to reimburse state, county, parish, or municipal governments for the costs associated with the prosecution of criminal cases declined by local U.S. Attorneys. Each year, hundreds of criminal cases resulting from federal arrests are referred to local prosecutors to handle when the cases fall below certain monetary, quantity, or severity thresholds. This places additional burdens on local government resources that are already stretched by the demands of prosecuting violations of local and state laws. This program provides funds to eligible jurisdictions in the four southwest border states, using a uniform payment-per-case basis for qualifying federally initiated and declined-referred criminal cases that were disposed of after October 1, 2001. Up to 220 eligible jurisdictions may apply. This includes county governments and the four state governments in Arizona, California, New Mexico, and Texas.
(5)*An estimate of the total number of respondents and the amount of time estimated for an average respondent to respond/reply:* It is estimated that no more than 220 respondents will apply. Each application takes approximately 60 minutes to complete and is submitted 4 times per year (quarterly).
(6)*An estimate of the total public burden (in hours) associated with the collection:* The total hour burden to complete the applications is 880 hours (880 applications (220 × 4 times a year) × 60 minutes per application = 52,800/60 minutes per hour = 880 burden hours). *If additional information is required contact:* Lynn Bryant, Department Clearance Officer, United States Department of Justice, Policy and Planning Staff, Justice Management Division, 601 D Street, NW., Suite 1600, Washington, DC, 20530, or via phone at 202-514-4304. Dated: July 28, 2006. Lynn Bryant, Department Clearance Officer, Justice Management Division, PRA, United States Department of Justice. [FR Doc. E6-12454 Filed 8-1-06; 8:45 am] BILLING CODE 4410-18-P NUCLEAR REGULATORY COMMISSION Agency Information Collection Activities: Submission for the Office of Management and Budget
(OMB)Review; Comment Request AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Notice of the OMB review of information collection and solicitation of public comment. SUMMARY: The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. 1. *Type of submission, new, revision, or extension:* Revision; 2. *The title of the information collection:* Policy Statement on Cooperation with States at Commercial Nuclear Power Plants and Other Production or Utilization Facilities; 3. *The form number if applicable:* N/A; 4. *How often the collection is required:* On occasion, when a State wishes to observe NRC inspections or perform inspections for NRC; 5. *Who will be required or asked to report:* Those States interested in observing or performing inspections; 6. *An estimate of the number of annual responses:* 154 (50 nuclear facility + 104 materials security licensees); 7. *The estimated number of annual respondents:* 66 (50 nuclear facility + 16 materials security licensees); 8. *An estimate of the total number of hours needed annually to complete the requirement or request:* 1,540 hours (10 hours per response); 9. *An indication of whether Section 3507(d), Pub. L. 104-13 applies:* N/A; 10. *Abstract:* States wishing to enter into an agreement with NRC to observe or participate in NRC inspections at nuclear power facilities or conduct materials security inspections against NRC Orders are requested to provide certain information to the NRC to ensure close cooperation and consistency with the NRC inspection program, as specified by the Commission's Policy of Cooperation with States at Commercial Nuclear Power Plants and Other Nuclear Production or Utilization Facilities and Section 274i of the atomic Energy Act, as amended. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: *http://www.nrc.gov/public-involve/doc-comment/omb/index.html.* The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by September 1, 2006. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. John A. Asalone, Office of Information and Regulatory Affairs (3150-0163), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to *John_A._Asalone@omb.eop.gov* or submitted by telephone at
(202)395-4650. The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233. Dated at Rockville, Maryland, this 25th day of July, 2006. For the Nuclear Regulatory Commission. Brenda Jo Shelton, NRC Clearance Officer, Office of Information Services. [FR Doc. E6-12444 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 50-188] Kansas State University; Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Kansas State University Nuclear Reactor Facility License No. R-88 for an Additional 20-Year Period The Nuclear Regulatory Commission (NRC or the Commission) is considering an application for the renewal of Facility License No. R-88, which authorizes the Kansas State University
(KSU)(the licensee) to operate the TRIGA Mark II Nuclear Reactor Facility at 1,250 kilowatts thermal power. The renewed license would authorize the applicant to operate the KSU Research Reactor for an additional 20 years beyond the period specified in the current license. The current license for the KSU Research Reactor expired on October 16, 2002. On September 12, 2002, as supplemented on December 22, 2004, July 6, 2005, March 20 and March 30, 2006, the Commission's staff received an application from KSU filed pursuant to 10 CFR 50.51(a), to renew Facility License No. R-88 for the KSU Research Reactor. A Notice of Receipt and Availability of the license renewal application, “Notice of License Renewal Application for Facility Operating License; Kansas State University,” was published in the **Federal Register** on October 11, 2002 (67 FR 63457). Because the license renewal application was timely filed under 10 CFR 2.109, the license will not be deemed to have expired until the license renewal application has been finally determined. The Commission's staff has determined that KSU has submitted sufficient information in accordance with 10 CFR 50.33 and 50.34 that the application is acceptable for docketing. The current Docket No. 50-188 for Facility License No. R-88, will be retained. The docketing of the renewal application does not preclude requesting additional information as the review proceeds, nor does it predict whether the Commission will grant or deny the application. Prior to a decision to renew the license, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. Within sixty
(60)days after the date of publication of this Federal Register Notice, the applicant may file a request for a hearing, and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene with respect to the renewal of the license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's “Rules of Practice for Domestic Licensing Proceedings” in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 and is accessible from the Agency Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/doc-collections/cfr.* Persons who do not have access to the NRC Web site or who encounter problems in accessing the documents located in the Electronic Reading Room should contact the NRC's PDR reference staff at 1-800-397-4209, or by e-mail at *pdr@nrc.gov.* If a request for a hearing or a petition for leave to intervene is filed within the 60-day period, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. In the event that no request for a hearing or petition for leave to intervene is filed within the 60-day period, the NRC may, upon completion of its evaluations and upon making the findings required under 10 CFR parts 50 and 51, renew the license without further notice. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with the particular interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition must specifically explain the reasons why intervention should be permitted with particular reference to the following factors:
(1)The nature of the requestor's/petitioner's right under the Atomic Energy Act to be made a party to the proceeding;
(2)the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and
(3)the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases of each contention and a concise statement of the alleged facts or the expert opinion that supports the contention on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the requestor/petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The requestor/petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. 1 Contentions shall be limited to matters within the scope of the action under consideration. The contention must be one that, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. 1 To the extent that the applications contain attachments and supporting documents that are not publicly available because they are asserted to contain safeguards or proprietary information, petitioners desiring access to this information should contact the applicant or applicant's counsel and discuss the need for a protective order. Each contention shall be given a separate numeric or alpha designation within one of the following groups: 1. *Technical* —primarily concerns/issues relating to technical and/or health and safety matters discussed or referenced in the applicant's safety analysis for the KSU Research Reactor license renewal application. 2. *Environmental* —primarily concerns issues relating to matters discussed or referenced in the Environmental Report for the license renewal application. 3. *Miscellaneous* —does not fall into one of the categories outlined above. As specified in 10 CFR 2.309, if two or more requestors/petitioners seek to co-sponsor a contention, the requestors/petitioners shall jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention. If a requestor/petitioner seeks to adopt the contention of another sponsoring requestor/petitioner, the requestor/petitioner who seeks to adopt the contention must either agree that the sponsoring requestor/petitioner shall act as the representative with respect to that contention, or jointly designate with the sponsoring requestor/petitioner a representative who shall have the authority to act for the requestors/petitioners with respect to that contention. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. A request for a hearing or a petition for leave to intervene must be filed by:
(1)First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff;
(2)courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff;
(3)E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, *HEARINGDOCKET@NRC.GOV;* or
(4)facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, Attention: Rulemakings and Adjudications Staff at 301-415-1101, verification number is 301-415-1966. A copy of the request for hearing and petition for leave to intervene must also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by e-mail to *OGCMailCenter@nrc.gov* . A copy of the request for hearing and petition for leave to intervene should also be sent to the licensee. The licensee's contact for this is Mr. P. Michael Whaley, Nuclear Reactor Manager, Kansas State University, 112 Ward Hall, Manhattan, KS 66506-2506. Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition, request and/or contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). Detailed guidance which the NRC uses to review applications for the renewal of non-power reactor licenses can be found in the document NUREG-1537, entitled “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors,” can be obtained from the Commission's PDR. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The detailed review guidance (NUREG-1537) may be accessed through the NRC's Public Electronic Reading Room on the Internet at *http://www.nrc.gov/reading-rm/adams.html* under ADAMS accession number ML042430055 for part one and ML042430048 for part two. Copies of the application to renew the facility license for the KSU Research Reactor are available for public inspection at the Commission's PDR, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, 20855-2738. The initial application also may be accessed through the NRC's Public Electronic Reading Room, at the address mentioned above, under ADAMS accession number ML022630083. The revised application may be accessed under ADAMS accession numbers ML052620181, ML061010264, and ML061640340. Persons who do not have access to ADAMS, or if there are problems in accessing the documents located in ADAMS, may contact the NRC Public Document Room Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov* . Dated at Rockville, Maryland, this 5th day of July, 2006. For the Nuclear Regulatory Commission. Brian E. Thomas, Chief, Research and Test Reactor Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor Regulation. [FR Doc. E6-12465 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 50-150] The Ohio State University Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of the Ohio State University Research Reactor Facility License No. R-75 for an Additional 20-Year Period The Nuclear Regulatory Commission (NRC or the Commission) is considering an application for the renewal of Facility License No. R-75, which authorizes the Ohio State University
(OSU)(the licensee) to operate the Ohio State University Research Reactor (OSURR) at 500 kilowatts thermal power. The renewed license would authorize the applicant to operate the OSURR for an additional 20-years beyond the period specified in the current license. The current license for the OSURR expired on February 3, 2000. On December 15, 1999, and supplemented on August 21, 2002, the Commission's staff received an application from OSU filed pursuant to 10 CFR Part 50.51(a), to renew Facility License No. R-75 for the OSURR. Because the license renewal application was filed in a timely manner in accordance with 10 CFR 2.109, the license will not be deemed to have expired until the license renewal application has been finally determined. The Commission's staff has determined that OSU has submitted sufficient information in accordance with 10 CFR 50.33 and 50.34 that the application is acceptable for docketing. The current Docket No. 50-150 for Facility License No. R-75, will be retained. The docketing of the renewal application does not preclude requesting additional information as the review proceeds, nor does it predict whether the Commission will grant or deny the application. Prior to a decision to renew the license, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. Within thirty
(30)days after the date of publication of this **Federal Register** Notice, the applicant may file a request for a hearing, and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene with respect to the renewal of the license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's “Rules of Practice for Domestic Licensing Proceedings” in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 and is accessible from the Agency Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/doc-collections/cfr* . Persons who do not have access to the NRC web site or who encounter problems in accessing the documents located in the Electronic Reading Room should contact the NRC's PDR reference staff at 1-800-397-4209, or by email at *pdr@nrc.gov* . If a request for a hearing or a petition for leave to intervene is filed within the 30-day period, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. In the event that no request for a hearing or petition for leave to intervene is filed within the 30-day period, the NRC may, upon completion of its evaluations and upon making the findings required under 10 CFR Parts 50 and 51, renew the license without further notice. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with the particular interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition must specifically explain the reasons why intervention should be permitted with particular reference to the following factors:
(1)The nature of the requestor's/petitioner's right under the Atomic Energy Act to be made a party to the proceeding;
(2)the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and
(3)the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases of each contention and a concise statement of the alleged facts or the expert opinion that supports the contention on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the requestor/petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The requestor/petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. 1 Contentions shall be limited to matters within the scope of the action under consideration. The contention must be one that, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. 1 To the extent that the applications contain attachments and supporting documents that are not publicly available because they are asserted to contain safeguards or proprietary information, petitioners desiring access to this information should contact the applicant or applicant's counsel and discuss the need for a protective order. Each contention shall be given a separate numeric or alpha designation within one of the following groups: 1. Technical—primarily concerns/issues relating to technical and/or health and safety matters discussed or referenced in the applicant's safety analysis for the OSURR license renewal application. 2. Environmental—primarily concerns issues relating to matters discussed or referenced in the Environmental Report for the license renewal application. 3. Miscellaneous—does not fall into one of the categories outlined above. As specified in 10 CFR 2.309, if two or more requestors/petitioners seek to co-sponsor a contention, the requestors/petitioners shall jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention. If a requestor/petitioner seeks to adopt the contention of another sponsoring requestor/petitioner, the requestor/petitioner who seeks to adopt the contention must either agree that the sponsoring requestor/petitioner shall act as the representative with respect to that contention, or jointly designate with the sponsoring requestor/petitioner a representative who shall have the authority to act for the requestors/petitioners with respect to that contention. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. A request for a hearing or a petition for leave to intervene must be filed by:
(1)First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff;
(2)courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff;
(3)E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, *HEARINGDOCKET@NRC.GOV* ; or
(4)facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, Attention: Rulemakings and Adjudications Staff at 301-415-1101, verification number is 301-415-1966. A copy of the request for hearing and petition for leave to intervene must also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by e-mail to *OGCMailCenter@nrc.gov.* A copy of the request for hearing and petition for leave to intervene should also be sent to the licensee. The licensee's contact for this is Dr. William A. Baeslack, III, Dean, College of Engineering, 142A Hitchcock Hall, The Ohio State University, 2070 Neil Avenue, Columbus, OH 43210. Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition, request and/or contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). Detailed guidance which the NRC uses to review applications for the renewal of non-power reactor licenses can be found in the document NUREG-1537, entitled “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors,” can be obtained from the Commission?s PDR. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The detailed review guidance (NUREG-1537) may be accessed through the NRC's Public Electronic Reading Room on the Internet at *http://www.nrc.gov/reading-rm/adams.html* under ADAMS accession number ML042430055 for part one and ML042430048 for part two. Copies of the application to renew the facility license for the OSURR are available for public inspection at the Commission?s PDR, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, 20855-2738. The initial application also may be accessed through the NRC's Public Electronic Reading Room, at the address mentioned above, under ADAMS accession number ML053400287 (Redacted Version). Persons who do not have access to ADAMS, or if there are problems in accessing the documents located in ADAMS, may contact the NRC Public Document Room Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* Dated at Rockville, Maryland, this 5th day of June 2006. For the Nuclear Regulatory Commission. Brian E. Thomas, Branch Chief, Research and Test Reactors Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor Regulation. [FR Doc. E6-12439 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-272 and 50-311] PSEG Nuclear LLC; Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of amendments to Facility Operating License Nos. DPR-70 and DPR-75 issued to PSEG Nuclear LLC (the licensee) for operation of the Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, located in Salem County, NJ. The proposed amendments would revise the Technical Specifications
(TSs)to delete Surveillance Requirement
(SR)4.9.2.b, which requires performance of a channel functional test
(CFT)of each source range neutron flux monitor within 8 hours prior to the initial start of core alterations. An associated administrative change would renumber current SR 4.9.2.c as SR 4.9.2.b. The amendments would also eliminate the restriction in SRs 4.10.3.2 and 4.10.4.2 that the CFTs of the intermediate and power range monitors be performed within 12 hours prior to initiating physics tests. The amendments would also make changes to TS Table 4.3-1 to make the SRs on the above instruments better aligned with NUREG-1431, “Standard Technical Specifications, Westinghouse Plants,” and with Technical Specification Task Force Traveler 108, “Eliminate the 12 hour [Channel Operational Test] on power range and intermediate range channels for Physics Test Exceptions.” Specifically, the frequency of the CFTs for the intermediate range, source range, and power range monitors would be changed to be more consistent with NUREG-1431. Before issuance of the proposed license amendments, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made a proposed determination that the amendment request involves no significant hazards consideration. Under the Commission's regulations in Title 10 of the Code of Federal Regulations (10 CFR), Section 50.92, this means that operation of the facility in accordance with the proposed amendments would not
(1)Involve a significant increase in the probability or consequences of an accident previously evaluated;
(2)create the possibility of a new or different kind of accident from any accident previously evaluated; or
(3)involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No The proposed changes do not affect the design, operational characteristics, function, or reliability of the source range, intermediate range, or power range monitors. A *channel functional test* for the source range, intermediate range, or power range monitors will continue to be performed at a frequency that has been determined to be sufficient for verification that the monitors are properly functioning. The proposed changes eliminate extraneous and unnecessary performance of a *channel functional test* for the source range, intermediate range, or power range monitors. A *channel functional test* for the source range, intermediate range, or power range monitors is not a precursor to, or assumed to be an initiator of any analyzed accident. Therefore, these proposed changes do not involve a significant increase in the probability of an accident. The consequences of accidents previously evaluated in the Updated Final Safety Analysis Report are unaffected by the proposed changes because no change to any equipment response or accident mitigation scenario has resulted. The proposed changes will have no adverse effect on the availability, operability, or performance of the safety-related systems and components assumed to actuate in the event of a design basis accident or transient. Because the source range, intermediate range, and power range monitors will remain capable of performing their design function, the proposed changes do not involve a significant increase in the consequences of an accident previously evaluated. Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated in the Updated Final Safety Analysis Report. No new accident scenarios, failure mechanisms, or limiting single failures are introduced as a result of the proposed changes. Specifically, no new hardware is being added to the plant as part of the proposed change, no existing equipment design or function is being modified, and no significant changes in operations are being introduced. No new equipment performance burdens are imposed. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Does the proposed change involve a significant reduction in a margin of safety? Response: No. The proposed changes will not alter any assumptions, initial conditions, or results of any accident analyses. The ability of operators to monitor the reactor power level during all operating conditions and modes of operation with the source range, intermediate range, or power range monitors is unchanged by these proposed changes. Therefore, the proposed changes do not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the **Federal Register** a notice of issuance. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. Written comments may be submitted by mail to the Chief, Rules and Directives Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this **Federal Register** notice. Written comments may also be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. The filing of requests for hearing and petitions for leave to intervene is discussed below. Within 60 days after the date of publication of this notice, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's “Rules of Practice for Domestic Licensing Proceedings” in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's PDR, located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly-available records will be accessible from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/doc-collections/cfr/.* If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements:
(1)The name, address and telephone number of the requestor or petitioner;
(2)the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding;
(3)the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and
(4)the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also identify the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner/requestor shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner/requestor must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner/requestor who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. If a hearing is requested, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment. Nontimely requests and/or petitions and contentions will not be entertained absent a determination by the Commission or the presiding officer of the Atomic Safety and Licensing Board that the petition, request and/or the contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). A request for a hearing or a petition for leave to intervene must be filed by:
(1)First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff;
(2)courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff;
(3)E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, *hearingdocket@nrc.gov;* or
(4)facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, Attention: Rulemakings and Adjudications Staff at
(301)415-1101, verification number is
(301)415-1966. A copy of the request for hearing and petition for leave to intervene should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by email to *ogcmailcenter@nrc.gov.* A copy of the request for hearing and petition for leave to intervene should also be sent to Jeffrie J. Keenan, Esquire, Nuclear Business Unit—N21, P.O. Box 236, Hancocks Bridge, NJ 08038, attorney for the licensee. For further details with respect to this action, see the application for amendment dated December 7, 2005, and the supplement dated July 20, 2006, which are available for public inspection at the Commission's PDR, located at One White Flint North, File Public Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly-available records will be accessible from the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html.* Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to *pdr@nrc.gov.* Dated at Rockville, Maryland, this 26th day of July 2006. For the Nuclear Regulatory Commission. Stewart N. Bailey, Senior Project Manager, Plant Licensing Branch 1-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E6-12442 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 50-2] Notice of Issuance of Decommissioning Amendment for University of Michigan Ford Nuclear Reactor The U.S. Nuclear Regulatory Commission
(NRC)is noticing the approval of the University of Michigan decommissioning plan
(DP)by amendment to the Facility Operating License for the Ford Nuclear Reactor (FNR). The FNR is located in the Phoenix Memorial Laboratory on the North Campus of the University in Ann Arbor, Michigan. The reactor was licensed to operate at 2 Megawatt thermal power. After the initial startup of the FNR in 1957, the reactor ceased operations on July 3, 2003. The licensee submitted the FNR DP to the NRC for review and approval in a letter dated June 8, 2004, as supplemented on June 23, 2004, January 5, 2006 and January 10, 2006. The NRC approved the DP by Amendment No. 50 to the FNR Operating License No. R-28 on June 22, 2006. A “Notice and Solicitation of Comments Pursuant to 10 CFR 20.1405 and 10 CFR 50.82(b)(5) Concerning Proposed Action to Decommission the University of Michigan Ford Nuclear Reactor” was published in the **Federal Register** on September 8, 2004 (69 FR 54326-54327) and in The Ann Arbor News on September 9, 2004. On June 7, 2006, the NRC staff consulted with the Environmental Coordinator for the City of Ann Arbor, Michigan. No comments were received. A copy of the license amendment approving the University of Michigan's proposed decommissioning plan is available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, 20855-2738. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The amendment may be accessed electronically from the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html* under ADAMS accession number ML061220260. Persons who do not have access to ADAMS, or have problems in accessing the documents located in ADAMS, may contact the NRC PDR Reference staff by phone at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* Dated at Rockville, Maryland, this June 30, 2006. For the Nuclear Regulatory Commission. Brian E. Thomas, Branch Chief, Research and Test Reactors Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor Regulation. [FR Doc. E6-12441 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-157 and 50-97] Notice of Issuance of Decommissioning Amendments for Cornell University Triga Research Reactor (TRIGA) and Cornell University Zero Power Reactor
(ZPR)The Nuclear Regulatory Commission
(NRC)has approved the Cornell University Ward Center for Nuclear Studies
(WCNS)decommissioning plan
(DP)by amendments to the Facility Operating Licenses for the TRIGA Research Reactor and the Zero Power Reactor (ZPR). The WCNS is located on the Cornell University campus in Ithaca, New York. The WCNS was constructed between 1959 and 1962 to house the TRIGA, the ZPR, and supporting systems. The TRIGA Reactor ceased operations on April 21, 2003. The ZPR ceased operations in 1996. The licensee submitted the WCNS DP to the NRC for review and approval in a letter dated August 22, 2003, as supplemented on May 13, September 27, October 26 and December 13, 2005, and February 13, 2006. The NRC approved the DP by Amendment No. 14 to the TRIGA Facility Operating License No. R-80 on June 15, 2006 and Amendment No. 8 to the ZPR Facility Operating License No. R-89 on June 6, 2006. A “Notice and Solicitation of Comments Pursuant to 10 CFR 20.1405 and 10 CFR 50.82(b)(5) Concerning Proposed Action To Decommission WCNS at Cornell University Reactor Facility” was published in the **Federal Register** on August 10, 2005 (70 FR 46549). No comments were received. Copies of the license amendments approving Cornell University's proposed decommissioning plan are available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, 20855-2738. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The amendments may be accessed electronically from the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html* under ADAMS accession number ML061030501 and ML061030405. Persons who do not have access to ADAMS, or have problems in accessing the documents located in ADAMS, may contact the NRC PDR Reference staff by phone at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* Dated at Rockville, Maryland, this 15 day of June, 2006. For the Nuclear Regulatory Commission. Brian E. Thomas, Branch Chief, Research and Test Reactors Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor Regulation. [FR Doc. E6-12462 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 40-8907] Notice of Availability of Environmental Assessment and Finding of No Significant Impact for License Amendment for United Nuclear Corporation, Church Rock, NM AGENCY: Nuclear Regulatory Commission. ACTION: Notice of availability. FOR FURTHER INFORMATION CONTACT: Paul Michalak, Project Manager, Fuel Cycle Facilities Branch, Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC, 20555. Telephone:
(301)415-7612; fax number:
(301)415-5955; e-mail: *pxm2@nrc.gov.* SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission
(NRC)proposes to issue a license amendment for License Condition 35 (ground water protection standards), to Materials License SUA-1475, for the United Nuclear Corporation (UNC), Church Rock, New Mexico uranium mill site (the Site). The purpose of this amendment is to revise the current chloroform ground water protection standard of 0.001 milligrams per liter (mg/L) to 0.08 mg/L for total trihalomethanes (THMs), and revise the current combined radium-226 and -228 GWPS from 5 pCi/L to 5.2 pCi/L in the Southwest Alluvium and from 5 pci/L to 9.4 pCi/L in Zone 1. II. EA Summary The staff has prepared an environmental assessment
(EA)in support of the proposed license amendment. Since this action relates to ground water, the primary focus of the evaluation of potential environmental impacts relates to ground water. Ground water is not used as a potable source at, or in, the immediate vicinity of the Site. The closest down-gradient public-use well is about 2,700 meters (8,860 feet) to the northeast. With the exception of the historical mill and mine activity, land use is primarily grazing for sheep, cattle and horses. The area around the Site is sparsely populated and includes Indian Tribal Land as well as UNC-owned property. The primary use of the Indian Tribal Land is grazing. The proposed total THMs ground water protection standard of 0.08 mg/L is one established by the U.S. Environmental Protection Agency
(EPA)under the Safe Drinking Water Act, and it represents a thoroughly examined and evaluated maximum allowable drinking water concentration that is considered to be safe by the EPA. With respect to the proposed combined radium-226 and 228 standards, both the proposed standard of 5.2 pCi/L in the Southwest Alluvium and 9.4 pCi/L in Zone 1 represent the 95th percentile background concentrations in their respective saturated units. They were both derived from a large data set collected over a 16 year period and are both below the New Mexico Ground Water Protection Standard of 30 pCi/L. III. Finding of No Significant Impact On the basis of the EA, NRC has concluded that there are no significant environmental impacts from the proposed amendment and has determined not to prepare an environmental impact statement. IV. Further Information Documents related to this action, including the application for amendment and supporting documentation, are available electronically at the NRC's Electronic Reading Room at *http://www.nrc.gov/reading-rm/adams.html.* From this site, you can access the NRC's Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The ADAMS accession numbers for the documents related to this notice are as follows: Document ADAMS accession No. Date License Amendment Request for Changing the Chloroform Ground Water Protection Standard in Source Materials License SUA-1475 ML052310151 May 26, 2005. Revised License Amendment Request for Changing the Chloroform Ground Water Protection Standard in Source Materials License SUA-1475 ML052100367 July 14, 2005. License Amendment Request for Changing the Method of Determining Exceedances of the Combined Radium Groundwater Protection Standard in Source Materials License No. SUA-1475 ML053010019 September 30, 2005. Summary of January 18, 2006 public meeting between NRC and UNC ML060200298 January 23, 2006. Revised License Amendment Request for Changing the Method of Determining Exceedances of the Combined Radium Groundwater Protection Standard in Source Materials License SUA-1475 ML060730043 February 22, 2006. Revised License Amendment Request for Changing the Method of Determining Exceedances of the Combined Radium Groundwater Protection Standard in Source Materials License SUA-1475 ML061220286 April 7, 2006. Environmental Assessment of License Amendment Request for Changing Ground Water Protection Standards in Source Materials License SUA-1475 ML061870630 July 21, 2006. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC's Public Document Room
(PDR)Reference staff at 800-397-4209, 301-415-4737, or by e-mail, to *pdr@nrc.gov.* These documents may also be viewed electronically on the public computers located at the NRC's PDR, O1 F21, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852. The PDR reproduction contractor will copy documents for a fee. Dated at Rockville, Maryland this 26th day of July, 2006. For The Nuclear Regulatory Commission. Paul Michalak, Project Manager, Fuel Cycle Facilities Branch, Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards. [FR Doc. E6-12445 Filed 8-1-06; 8:45 am] BILLING CODE 7590-01-P RAILROAD RETIREMENT BOARD Proposed Collection; Comment Request SUMMARY: In accordance with the requirement of Section 3506 (c)(2)(A) of the Paperwork Reduction Act of 1995 which provides opportunity for public comment on new or revised data collections, the Railroad Retirement Board
(RRB)will publish periodic summaries of proposed data collections. *Comments are invited on:*
(a)Whether the proposed information collection is necessary for the proper performance of the functions of the agency, including whether the information has practical utility;
(b)the accuracy of the RRB's estimate of the burden of the collection of the information;
(c)ways to enhance the quality, utility, and clarity of the information to be collected; and
(d)ways to minimize the burden related to the collection of information on respondents, including the use of automated collection techniques or other forms of information technology. *Title and purpose of information collection:* Vocational Report; OMB 3220-0141. Section 2 of the Railroad Retirement Act
(RRA)provides for payment of disability annuities to qualified employees and widow(ers). The establishment of permanent disability for work in the applicants “regular occupation” or for work in any regular employment is prescribed in 20 CFR 220.12 and 220.13 respectively. The RRB utilizes Form G-251, *Vocational Report* , to obtain an applicant's work history. This information is used by the RRB to determine the effect of a disability on an applicant's ability to work. Form G-251 is designed for use with the RRB's disability benefit application forms and is provided to all applicants for employee disability annuities and to those applicants for a widow(er)'s disability annuity who indicate that they have been employed at some time. Completion is required to obtain or retain a benefit. One response is requested of each respondent. The RRB proposes no changes to Form G-251. The completion time for Form G-251 is estimated at between 30 and 40 minutes per response. The RRB estimates that approximately 6,000 Form G-251's are completed annually. *Additional Information or Comments:* To request more information or to obtain a copy of the information collection justification, forms, and/or supporting material, please call the RRB Clearance Officer at
(312)751-3363 or send an e-mail request to *Charles.Mierzwa@RRB.GOV* . Comments regarding the information collection should be addressed to Ronald J. Hodapp, Railroad Retirement Board, 844 North Rush Street, Chicago, Illinois 60611-2092 or send an e-mail to *Ronald.Hodapp@RRB.GOV* . Written comments should be received within 60 days of this notice. Charles Mierzwa, Clearance Officer. [FR Doc. E6-12431 Filed 8-1-06; 8:45 am] BILLING CODE 7905-01-P SECURITIES AND EXCHANGE COMMISSION Sunshine Act Meeting Federal Register Citation of Previous Announcement: 71 FR 42888, July 28, 2006. Status: Closed Meeting. Place: 100 F Street, NE., Washington, DC. Date and Time of Previously Announced Meeting: August 1, 2006 at 2 p.m. change in the Meetings: Date and Time Change. The Closed Meeting scheduled for Tuesday, August 1, 2006 at 2 p.m., has been changed to Friday, August 4, 2006 at 2 p.m. At times, changes in Commission priorities require alterations in the scheduling of meeting items. For further information and to ascertain what, if any, matters have been added, deleted or postponed, please contact: The Office of the Secretary at
(202)551-5400. Dated: July 31, 2006. Jill M. Peterson, Assistant Secretary. [FR Doc. 06-6669 Filed 7-31-06; 3:52 pm]
Connectionstraces to 11
Traces to 11 documents
U.S. Code
CFR
- Application for bulk manufacture of Schedule I and II substances.§ 1301.33
- Continuation of license.§ 50.51
- Effect of timely renewal application.§ 2.109
- Contents of applications; general information.§ 50.33
- Hearing requests, petitions to intervene, requirements for standing, and contentions.§ 2.309
- Notice for public comment; State consultation.§ 50.91
- Issuance of amendment.§ 50.92
- Public notification and public participation.§ 20.1405
- Termination of license.§ 50.82
- Evidence considered.§ 220.12
3 references not yet in our index
- 5 CFR 1320.10
- Pub. L. 104-13
- 10 CFR 2
Citation graph
cites case law
Notices
30 Day Notice of Information Collection Under Review: Extension of a currently approved collection
Cite5 CFR 1320.10
Pub. L.Pub. L. 104-13
Cite10 CFR 2
Cites 14 · showing 12Cited by 0 across 0 sources