BILLING CODE 4140-01-M DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [FEMA-2006-0005] RIN 1660-ZA14 NEPA Alternative Arrangements for Critical Physical Infrastructure in New Orleans AGENCY: Federal Emergency Management Agency (FEMA), Department of Homeland Security. ACTION: Notice. SUMMARY: The Department of Homeland Security
(DHS)and the Council on Environmental Quality
(CEQ)have established Alternative Arrangements to meet the requirements of the National Environmental Policy Act
(NEPA)and the CEQ Regulations for Implementing the Procedural Requirements of NEPA (CEQ Regulations) for FEMA Grants to Reconstruct Critical Infrastructure in the New Orleans Metropolitan Area. These Alternative Arrangements are designed to enable timely action on the expected large number of grant applications to restore safe and healthful living conditions in the New Orleans Metropolitan Area (NOMA). These alternative arrangements will enable FEMA, as a component of DHS, to consider the potential for significant impacts to the human environment from its approval to fund the reconstruction of critical physical infrastructure in NOMA through its grant programs. DATES: Comments due on or before May 22, 2006. ADDRESSES: You may submit comments, identified by Docket Number FEMA-2006-0005, by one of the following methods: Federal eRulemaking Portal: *http://www.regulations.gov.* Follow the instructions for submitting comments. E-mail: *FEMA-RULES@dhs.gov.* Include Docket Number FEMA-2006-0005 in the subject line of the message. Fax: 202-646-4536. Mail/Hand Delivery/Courier: Rules Docket Clerk, Office of General Counsel, Federal Emergency Management Agency, Room 406, 500 C Street, SW., Washington, DC 20472. Instructions: All Submissions received must include the agency name and docket number (if available). Regardless of the method used for submitting comments or material, all submissions will be posted, without change, to the Federal eRulemaking Portal at *http://www.regulations.gov,* and will include any personal information you provide. Therefore, submitting this information makes it public. You may wish to read the Privacy Act notice that is available on the Privacy and Use Notice link on the Administration Navigation Bar of *http://www.regulations.gov.* Docket: For access to the docket to read background documents or comments received, go to the Federal eRulemaking Portal at *http://www.regulations.gov.* Submitted comments may also be inspected at FEMA, Office of General Counsel, 500 C Street, SW., Room 406, Washington, DC 20472. FOR FURTHER INFORMATION CONTACT: Brent Paul, Environmental Officer, Federal Emergency Management Agency, 500 C Street SW., Washington, DC 20472, or phone
(202)646-3032. SUPPLEMENTARY INFORMATION: 1. What are NEPA Alternative Arrangements? NEPA Alternative Arrangements are a set of procedures, established in consultation with CEQ, for complying with the requirements of the National Environmental Policy Act and CEQ regulations when emergency circumstances require taking actions with significant environmental impacts and there is not sufficient time to follow the regular Environmental Impact Statement process. These arrangements are limited to actions necessary to control the immediate impacts of the emergency. CEQ and DHS arrived at these alternative arrangements in accordance with 40 CFR 1506.11 on December 6, 2005. 2. What is the nature of the emergency? Damages to the critical physical infrastructure in the New Orleans Metropolitan Area
(NOMA)from the impact of Hurricanes Katrina and Rita have rendered parts of the city inoperable and uninhabitable. Without the restoration of this critical infrastructure the city cannot adequately support a safe and healthy reconstruction and repopulation process. FEMA expects a large number of grant applications which would overwhelm the available personnel and resources to assess each application in an Environmental Impact Statement (EIS). Review and approval of these applications must be accomplished in an expeditious manner to provide safe and healthy conditions for the reconstruction and repopulation of NOMA and will be required in a timeframe that does not allow available staff and resources to complete the EIS process and to issue the individual Record of Decision (ROD). 3. What authority exists for these Alternative Arrangements? These Alternative Arrangements were prepared pursuant to CEQ regulations at 40 CFR 1506.11 and FEMA regulations at 44 CFR 10.13. 4. What types of critical physical infrastructure actions fall under these Alternative Arrangements? Grant applications for the reconstruction of the following categories of critical physical infrastructure would be included under these Alternative Arrangements: • Hospitals and health care facilities. • Utilities and Wastewater Treatment Plants. • Permanent police and fire stations. • Government and court administration buildings. • Detention Centers (jailhouses). • Permanent schools. FEMA is developing a description for each category which it will post on the Web site established per the alternative arrangements ( *http://www.fema.gov/ehp/noma* ). This description will provide criteria for determining whether a grant for a specific proposed project falls within an identified critical infrastructure category and is subject to the alternative arrangements. The description will also describe mitigation measures that will be available to reduce environmental impacts including any impacts to properties eligible for listing or listed on the National Register of Historic Places. 5. Who was consulted during the preparation of these Alternative Arrangements? The Department of Homeland Security and the White House Council on Environmental Quality were heavily involved in the preparation of these Alternative Arrangements to ensure that they were necessary to control the immediate impacts of the emergency. This notice provides the process for engaging other potentially interested parties. 6. How does FEMA plan to consult and involve affected disaster victims, communities, and local governments? FEMA will continue to provide opportunities for stakeholders to become involved in the environmental review process through its regular outreach mechanisms including meetings sponsored by the Long Term Community Recovery Emergency Support Function and Public Assistance meetings with applicants and local officials. Other mechanisms provide special efforts to involve NOMA residents that may have temporarily relocated outside of NOMA, these mechanisms include the development of a FEMA Internet page with environmental related information specific to the proposed actions in NOMA ( *http://www.fema.gov/ehp/noma* ), and linking to other public involvement forums such as State, parish, local group, and committee hearings, and outreach through various groups like faith-based organizations. 7. How can affected disaster victims and the general public submit comments to FEMA on these NEPA Alternative Arrangements? The general public and disaster victims can submit comments regarding this procedure through one of the following methods: Federal eRulemaking Portal: *http://www.regulations.gov.* Follow the instructions for submitting comments. E-mail: *FEMA-RULES@dhs.gov.* Include Docket Number FEMA-2006-0005 in the subject line of the message. Fax: 202-646-4536. Mail/Hand Delivery/Courier: Rules Docket Clerk, Office of General Counsel, Federal Emergency Management Agency, Room 406, 500 C Street, SW., Washington, DC 20472. The general public should submit comments on the content of the website and project specific information to *FEMA-NOMA@dhs.gov.* 8. Why are NEPA Alternative Arrangements needed for the FEMA-funded reconstruction of critical infrastructure in NOMA? The NEPA Alternative Arrangements have been developed for the New Orleans Metropolitan Area because it was a unique situation where the sensitivity of the area, the level of devastation, and the density of reconstruction that will be addressed through FEMA grants warranted the agency to consider all FEMA funding of projects rather than environmentally assessing the impacts of each grant application individually. The combined effects of these numerous actions are highly uncertain, may involve unknown risks, and are expected to result in cumulatively significant environmental impacts. FEMA believes that actions in this small geographic area by one applicant could likely result in an extensive land use change which may be incompatible with existing or planned land use of the surrounding area. In addition, the wind and flood damage from Hurricane Katrina in NOMA was concentrated in largely low-income and minority communities. As a result, reconstruction of the critical infrastructure in these areas and its related environmental effects ( *i.e.* land-use changes, air quality impacts of construction activities, air quality impacts of traffic patterns, water quality impacts, etc.) may disproportionately impact these communities. NOMA contains numerous historic properties, many of which are listed or eligible to be listed in the National Register of Historic Places. These historic properties may be adversely impacted by the reconstruction activities. FEMA also believes that the accumulated effects of FEMA-funded reconstruction actions together with other local, State, and Federal planned actions for the New Orleans Metropolitan Area may result in significant environmental impacts. 9. Will these Alternative Arrangements circumvent the basic concepts of NEPA? The Alternative Arrangements cannot circumvent the National Environmental Policy Act because they are imbedded in the procedures established to comply with the Act. The intent of these arrangements is to implement the basic principles of NEPA as reflected in the CEQ regulations implementing the NEPA section 102(C) requirement for a detailed statement to the extent practical in the time available. The arrangements will provide expedited but effective fulfillment of the public involvement, consideration of alternatives, impacts analyses, and informed decision making objectives of NEPA. CEQ provided its letter concurring with these alternative arrangements on December 6, 2005. 10. Will alternatives to projects be considered under these Alternative Arrangements? Non-federal applicants may include alternatives in their applications for funding for reconstruction of critical physical infrastructure in NOMA. These Alternative Arrangements allow for, but do not require, the submission or analysis of alternatives for individual projects. However, evaluation of alternatives, such as mitigation alternatives to meet other legal requirements like Floodplain Management and Wetlands Protection regulations or Executive Order 12898 on Environmental Justice, will be considered in the context of the grant applications. For example, the evaluation of alternatives may also be used to assist in the identification of treatment measures for undertakings that may have adverse effects on properties that are eligible for or listed in the National Register of Historic Places. The applicant may provide sector-specific Critical Infrastructure Facility Plans. This plan will provide the needs identified by the applicant for a particular sector and the development plan to meet those needs. These plans may have an evaluation of alternatives for the re-establishment of the sector's critical infrastructure. 11. What is the end date for these NEPA Alternative Arrangements? The NEPA Alternative Arrangements are limited to actions necessary to control the immediate impacts of the emergency. The need for the Alternative Arrangements will continue to exist as long as necessary to process grant applications for the reconstruction of critical infrastructure in NOMA. While there is no clear end date, grant applications are expected to arrive as local, regional, State, and interstate planning efforts conclude. For NOMA, the response time from the receipt of the grant application, to action on the application, and implementation or execution dates of approved grant applications is further limited by public health and safety concerns. It is urgent to restore the critical infrastructure needed to protect the health and safety of the public in the New Orleans Metropolitan Area. 12. How are these NEPA Alternative Arrangements reviewed? DHS and CEQ will review these Alternative Arrangements on a quarterly basis to assess their effectiveness and longevity. This review will include a review of significant comments received during the previous quarter. The review will be made available to the public through the Web site prepared for the Alternative Arrangements ( *www.fema.gov/ehp/noma* ). 13. How is FEMA ensuring that projects comply with other Federal environmental and historic preservation laws? Projects that are subject to the NEPA Alternative Arrangements must comply with other environmental and historic preservation laws and executive orders. Thus, projects subject to the Alternative Arrangements will still be reviewed to ensure compliance with relevant environmental and historic preservation laws and executive orders. The results of this review will be made available to the public through the web site. The Department of Homeland Security and CEQ have established Alternative Arrangements to meet the requirements of NEPA and the CEQ Regulations for Implementing the Procedural Requirements of NEPA for FEMA Grants to Reconstruct Critical Infrastructure in the New Orleans Metropolitan Area. These Alternative Arrangements are designed to enable timely action on the expected large number of grant applications to restore safe and healthful living conditions in the New Orleans Metropolitan Area. These alternative arrangements will enable FEMA to consider the potential for significant impacts to the human environment from its approval to fund the reconstruction of critical physical infrastructure in NOMA through its grant programs. The Alternative Arrangements to Meet National Environmental Policy Act Requirements for the Reconstruction of New Orleans Metropolitan Area Critical Infrastructure Funded by Federal Emergency Management Agency Grant Programs follows: Alternative Arrangements to Meet National Environmental Policy Act Requirements for the Reconstruction of New Orleans Metropolitan Area Critical Infrastructure Funded by Federal Emergency Management Agency Grant Programs I. Scope of the Emergency Hurricanes Katrina and Rita caused sufficient damage in parts of the State of Louisiana to trigger Presidential disaster declarations for these areas. Damage was so severe and wide spread that the impact of Hurricane Katrina was also designated as the first catastrophic incident of national significance under the National Response Plan. Disaster-related damages to the critical physical infrastructure in the New Orleans Metropolitan Area
(NOMA)have rendered parts of the city inoperable and uninhabitable. Without this critical infrastructure the city cannot adequately support a safe and healthful reconstruction and repopulation process. The Department of Homeland Security's Federal Emergency Management Agency
(FEMA)expects numerous grant applications requiring agency action in a timeframe 1 that would not allow for completion of an Environmental Impact Statement
(EIS)and a Record of Decision (ROD). This constitutes an emergency situation. 1 This limited timeframe is the time from the receipt of the grant application to the approval and execution of the proposed action. The Department of Homeland Security and the Council on Environmental Quality
(CEQ)established these alternative arrangements to enable timely action on grant applications to restore safe and healthful living conditions in NOMA while observing the requirements and objectives of the National Environmental Policy Act (NEPA). These alternative arrangements will enable FEMA to consider the potential for significant impacts to the human environment from its funding the reconstruction of critical physical infrastructure in NOMA through its grant programs. These alternative arrangements have been developed in consultation with CEQ pursuant to NEPA regulations found in 40 CFR 1506.11 and 44 CFR 10.13. II. Actions Needed to Control the Immediate Impacts of the Emergency FEMA currently administers grant programs to fund the repair, restoration, and replacement of eligible infrastructure that has been damaged or destroyed in areas that have been included in a Presidential disaster declaration. Although the restoration of eligible infrastructure substantially to its pre-disaster conditions is excluded from NEPA by section 316 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5159) FEMA anticipates that the applications from the State of Louisiana for NOMA will more strongly reflect future demands than returning to pre-disaster conditions. Proposed projects will not necessarily be the same size, nature, or location; will use current building codes, and construction methods; and take advantage of current community and urban planning principles, and hazard mitigation opportunities. In such situations NEPA does apply. The following types of critical physical infrastructure 2 projects in NOMA that may qualify for FEMA grant funding are addressed by these alternate arrangements: 2 While levees are considered critical infrastructure, their restoration is not an eligible FEMA activity because they fall under the purview of the U.S. Army Corps of Engineers. • Hospitals and health care facilities. • Utilities and Wastewater Treatment Plants. • Permanent police and fire stations. • Government and court administration buildings. • Detention Centers (jailhouses). • Permanent schools. III. Potential Significant Effects of the Proposed Action Both the Department of Homeland Security and FEMA consider this a unique situation where the sensitivity of the area and the level of devastation and the density of reconstruction warrant the agency to consider the FEMA funded projects together rather than individually. The combined effects of these numerous actions are highly uncertain and may involve unknown risks. However, FEMA believes the following factors that could trigger the need for an EIS may be present: • Actions will likely result in an extensive change in land use; • Actions could result in a land use change which is incompatible with existing or planned land use of the surrounding area; • Many people, including low income and minority communities, will be affected by these actions; • The environmental impacts of these actions will likely be controversial; • Actions could adversely affect a significant amount of properties listed or eligible to be listed in the National Register of Historic Places; and • Actions are likely to be either a part of or closely related to other actions underway or planned for NOMA and the cumulative nature of these projects could cause significant environmental impacts. IV. Components of the NEPA Process that Add Value and Will Be Used a. Public Involvement FEMA will continue to provide opportunities for stakeholders to become involved in the environmental review process through regular outreach mechanisms. An example of these mechanisms is meetings with the applicant and local officials to explain the Public Assistance Program requirements, including those environmental and historic preservation compliance requirements and related environmental, social, economic, cultural, and historic consequences. Other existing venues for the involvement of stakeholders will be identified and utilized to the extent practical. Public input will be used to further develop appropriate outreach mechanisms best suited to assist in assessing the potential for impact to the human environment from the reconstruction of critical physical infrastructure projects required to restore safe and healthful conditions for the repopulation of NOMA. Special effort will be taken to involve the general public and NOMA residents, including those that have temporarily relocated outside of NOMA. FEMA will develop an internet page for environmentally related public notices and environmentally related information specific to the proposed actions in NOMA. This page would also track other projects in NOMA in order to provide the public with information on the individual and the cumulative nature of impacts of the FEMA funded actions. Efforts would be made to link to other public involvement forums such as State, parish, local group, and committee hearings and make this information available via electronic and non-electronic modes of outreach to assure availability to all those potentially affected. For each project type, such as those identified above, FEMA will develop public involvement strategies that take into consideration the nature of that project type and the likely stakeholders that would have an interest in or be affected by those projects. Such strategies will include addressing national, State and local media, notifying groups linked to the various types of infrastructure, involving various civic, ethic, and religious groups, etc. When an action also requires public involvement to satisfy requirements under other Federal laws, regulations, or Executive Orders, including the National Historic Preservation Act and Executive Order 11988, Floodplains, FEMA will work to integrate those public involvement requirements into the alternate arrangements public involvement process. b. Alternatives and Mitigation Measures FEMA has developed the list of types of critical infrastructure projects (section II) that would be addressed by these alternative arrangements when applications are received from the State of Louisiana. Grant applications are project specific and provide the proposed sites or alternative sites. Potential alternatives also include whether to approve or condition the grant. FEMA will establish criteria that will be followed for each type of critical physical infrastructure reconstruction project to mitigate or avoid significant environmental impacts whenever possible. Public input and consultation with the appropriate Federal, tribal, and State resource agencies will be used to help identify appropriate measures to minimize the potential for adverse environmental impacts associated with the reconstruction of each type of critical infrastructure. As these environmental impact evaluations are completed and mitigation measures are developed, FEMA will post available and relevant documents on the internet site and make copies available to interested groups and members of the public upon request. Given the urgency of the reconstruction effort, it is likely that some environmental impact analyses will need to proceed with incomplete or unavailable information. When information on the environmental effects of a type of critical physical infrastructure reconstruction is limited by incomplete or unavailable information, FEMA will use the direction in the Council on Environmental Quality regulations at 40 CFR 1502.22. c. Environmental (including related social, cultural, historic, and economic) Impacts and Incorporation of Other Environmental/Historic Preservation Documentation and Processes FEMA will post on the internet site prepared for NOMA and use the public outreach described above to provide the projects and associated environmental reviews. This will allow the public and environmental reviewers an opportunity to track all the projects and associated impacts in a given area in NOMA. FEMA will refer to and incorporate other available environmental and planning documents and data prepared for the NOMA area that provide useful information. The agency also intends to incorporate and utilize, to the extent feasible and practical, the environmental documentation or information prepared or gathered by other agencies before this event and those that will be prepared during the reconstruction and rebuilding efforts in NOMA. Examples of documents incorporated by reference include: • New Orleans International Airport EIS. • New Orleans Regional Transit Authority EIS for city's streetcar system. • East-West Corridor Environmental Impact Study. • New Orleans Riverfront Redevelopment Master Plan. FEMA will also document and incorporate its ongoing consultation efforts with other regulatory and environmental agencies including the State Historic Preservation Offices and the Advisory Council on Historic Preservation. V. Duration of the Emergency The emergency identified above started at the moment of the Presidential disaster declaration and will continue until critical infrastructure in NOMA that is immediately necessary to protect the health and safety of the public is fully restored. Although the submission of some project applications may be contingent upon the occurrence of an independent event ( *i.e.* reconstruction of levees, development of local plans, etc.), the need for the alternative arrangements would continue to exist so long as the amount of time (from the submission of the application to the date agency action on the application is necessary to allow timely implementation or execution of the action) is limited. FEMA and DHS will review these alternative arrangements with the Council on Environmental Quality on a quarterly basis to assess their effectiveness and longevity. VI. Documentation Documentation of the analysis of the proposed actions on grant applications and the potential for significant impacts to the human environment will consist of these alternative arrangements and the evolving website and available documents incorporated by reference, with updates as new information becomes available, and the posting of agency actions (receiving, approving, conditioning, or denying) on critical infrastructure grant applications as well as notices of other actions being taking in the NOMA. Dated: March 20, 2006. David Paulison, Acting Director, Federal Emergency Management Agency, Department of Homeland Security. [FR Doc. E6-4191 Filed 3-22-06; 8:45 am] BILLING CODE 9110-41-P DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5037-N-13] Notice of Submission of Proposed Information Collection to OMB; Public Housing Assessment System (PHAS): Management Operations Certification AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The proposed information collection requirement described below has been submitted to the Office of Management and Budget
(OMB)for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. PHA's (or Resident Management Corporations) submit management information for evaluation of all major areas of a participant's management operations. The information is used to assess the management performance of PHAs. DATES: *Comments Due Date:* April 24, 2006. ADDRESSES: Interested persons are invited to submit comments regarding this proposal. Comments should refer to the proposal by name and/or OMB approval Number (2535-0106) and should be sent to: HUD Desk Officer, Office of Management and Budget, New Executive Office Building, Washington, DC 20503; fax: 202-395-6974. FOR FURTHER INFORMATION CONTACT: Lillian Deitzer, Reports Management Officer, AYO, Department of Housing and Urban Development, 451 Seventh Street, SW., Washington, DC 20410; e-mail Lillian Deitzer at *Lillian_L_Deitzer@HUD.gov* or telephone
(202)708-2374. This is not a toll-free number. Copies of available documents submitted to OMB may be obtained from Ms. Deitzer. SUPPLEMENTARY INFORMATION: This notice informs the public that the Department of Housing and Urban Development has submitted to OMB a request for approval of the information collection described below. This notice is soliciting comments from members of the public and affecting agencies concerning the proposed collection of information to:
(1)Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility;
(2)Evaluate the accuracy of the agency's estimate of the burden of the proposed collection of information;
(3)Enhance the quality, utility, and clarity of the information to be collected; and
(4)Minimize the burden of the collection of information on those who are to respond; including through the use of appropriate automated collection techniques or other forms of information technology, *e.g.* , permitting electronic submission of responses. This notice also lists the following information: *Title of Proposal:* Public Housing Assessment System (PHAS): Management Operations Certification. *OMB Approval Number:* 2535-0106. *Form Numbers:* HUD-50072. *Description of the Need for the Information and Its Proposed Use:* PHAs (or Resident Management Corporations) submit management information for evaluation of all major areas of a participant's management operations. The information is used to assess the management performance of PHAs. *Frequency of Submission:* Annually. Number of respondents × Annual responses × Hours per response = Burden hours Reporting burden 3,174 1 1,150 3,643 *Total Estimated Burden Hours:* 3,643. *Status:* Extension of a currently approved collection. Authority: Section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 35, as amended. Dated: March 16, 2006. Lillian L. Deitzer, Departmental Paperwork Reduction Act Officer, Office of the Chief Information Officer. [FR Doc. E6-4167 Filed 3-22-06; 8:45 am] BILLING CODE 4210-67-P DEPARTMENT OF THE INTERIOR Bureau of Land Management [NV-056-5853-ES; N-79979] Notice of Realty Action; Recreation and Public Purposes Act Classification; Nevada AGENCY: Bureau of Land Management, Interior. ACTION: Notice of realty action. SUMMARY: The Bureau of Land Management
(BLM)has examined and found suitable for conveyance under the provisions of the Recreation and Public Purposes (R&PP) Act, as amended, 60 acres of public land in Las Vegas, Clark County, Nevada. Clark County School District proposes to use the land for development of a high school. DATES: For a period until May 8, 2006, interested parties may submit comments to the Field Manager, BLM Las Vegas Field Office. ADDRESSES: Please submit your comments to the Las Vegas Field Office, Bureau of Land Management, 4701 N. Torrey Pines Drive, Las Vegas, NV 89130. FOR FURTHER INFORMATION CONTACT: Brenda Warner, BLM Realty Specialist,
(702)515-5084. SUPPLEMENTARY INFORMATION: The following described public land in the Las Vegas Valley, Clark County, Nevada, has been examined and found suitable for conveyance for recreational or public purposes under the provisions of the R&PP Act, as amended (43 U.S.C. 869 *et seq.* ). The Clark County School District proposes to use the land for a high school site (N-79979). Mount Diablo Meridian, Nevada T. 22 S., R. 60 E. Sec. 35, E 1/2 NW 1/4 SW 1/4 NW 1/4 , E 1/2 SW 1/4 NW 1/4 , W 1/2 SE 1/4 NW 1/4 , W 1/2 E 1/2 SE 1/4 NW 1/4 , E 1/2 NE 1/4 SE 1/4 NW 1/4 —general location: west of Torrey Pines Drive, south of Levi Ave. and north of Erie Ave. The area described contains approximately 60 acres in Clark County. The land is not required for any Federal purpose. Conveyance is consistent with the Las Vegas Resource Management Plan dated October 5, 1998, and would be in the public interest. The conveyance, when issued, will be subject to the provisions of the R&PP Act and applicable regulations of the Secretary of the Interior and will contain the following reservations to the United States: 1. A right-of-way thereon for ditches and canals constructed by the authority of the United States, Act of August 30, 1890 (43 U.S.C. 945). 2. All minerals shall be reserved to the United States, together with the right to prospect for, mine and remove such deposits from the same under applicable law and such regulations as the Secretary of the Interior may prescribe. And will be subject to: 1. Valid and existing rights; 2. A right-of-way for railroad purposes granted to the San Pedro, Los Angeles, and Salt Lake Railroad Company, its successors or assigns, by right-of-way CC-00360, pursuant to the Act of March 3, 1875, (43 U.S.C. 934-939); Detailed information concerning this action is available for review at the office of the Bureau of Land Management, Las Vegas Field Office, 4701 N. Torrey Pines Drive, Las Vegas, Nevada 89130. Upon publication of this notice in the **Federal Register** , the above described land is segregated from all other forms of appropriation under the public land laws, including the general mining laws, except for conveyance under the R&PP Act, leasing under the mineral leasing laws, and disposal under the mineral material disposal laws. *Classification Comments:* Interested parties may submit comments involving the suitability of the land for a high school site. Comments on the classification are restricted to whether the land is physically suited for the proposal, whether the use will maximize the future use or uses of the land, whether the use is consistent with local planning and zoning, or if the use is consistent with State and Federal programs. *Application Comments:* Interested parties may submit comments regarding the specific use proposed in the application and plan of development, whether the BLM followed proper administrative procedures in reaching the decision, or any other factor not directly related to the suitability of the lands for a high school site. All submissions from organizations or businesses will be made available for public inspection in their entirety. Individuals may request confidentiality with respect to their name, address, and phone number. If you wish to have your name or street address withheld from public review, or from disclosure under the Freedom of Information Act, the first line of the comment should start with the words “CONFIDENTIALITY REQUEST” in uppercase letters in order for BLM to comply with your request. Such requests will be honored to the extent allowed by law. Comment contents will not be kept confidential. Any adverse comments will be reviewed by the State Director who may sustain, vacate, or modify this realty action. In the absence of any adverse comments, the classification will become effective on May 22, 2006. The lands will not be offered for conveyance until after the classification becomes effective. (Authority: 43 CFR 2741.5). Dated: February 24, 2006. Sharon DiPinto, Assistant Field Manager, Division of Lands, Las Vegas, NV. [FR Doc. 06-2891 Filed 3-21-06; 2:00 pm]
Connectionstraces to 5
6 references not yet in our index
  • 40 CFR 1506.11
  • 44 CFR 10.13
  • 40 CFR 1502.22
  • 44 USC 35
  • 43 USC 934-939
  • 43 CFR 2741.5
Citation graph
cites case law
Notices
Notice
Cite40 CFR 1506.11
Cite44 CFR 10.13
Cite40 CFR 1502.22
Cite44 USC 35
Cite43 USC 934-939
Cites 11 · showing 10Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.