Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2006-01-24 · Nuclear Regulatory Commission · Proposed Rules

Proposed Rules. Proposed rule: Reopening of comment period

654 words·~3 min read·/register/2006/01/24/06-676·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Nuclear Regulatory Commission
Action: Proposed rule: Reopening of comment period
Citation: FR Doc. 06-676 · RIN 3150-AH60 · 10 CFR 73

Summary

On November 7, 2005 (70 FR 67380), the Nuclear Regulatory Commission (NRC) published for public comment a proposed rule consolidating the supplemental requirements established by the April 29, 2003, design basis threat (DBT) orders with the existing DBT requirements in 10 CFR 73.1(a). Specific details of the attributes of the DBT to be protected against, which include both safeguards information (SGI) and classified information, are consolidated in adversary characteristics documents (ACDs) and Regulatory Guides (RGs). The proposed rule would revise the DBT requirements both for radiological sabotage and for theft or diversion of Strategic Special Nuclear Material (SSNM). ACDs and RGs provide guidance to licensees concerning the DBT for radiological sabotage, theft and diversion. They contain the specific details of the attributes of the threat which licensees need to know in order to evaluate what is necessary to comply with the proposed rule. On December 21, 2005, the Nuclear Energy Institute (NEI) requested a 30 day extension to the public comment period. Their request was based on the fact that though the proposed rule was published on November 7, 2005, the RGs and the ACDs were not available at that time. NEI requested copies of these documents. The NRC staff agreed to provide these documents to the properly cleared individuals with a need to know, and NEI received the draft RGs and ACDs for power reactors on December 19, 2005. In view of the delay in providing the documents to the cleared personnel and in the interests of obtaining public comment from the broadest range of stakeholders, the comment period on the proposed rule is being extended for an additional 30 days from the original January 23, 2006, deadline to February 22, 2006.

Dates

The comment period has been extended and now expires on February 22, 2006. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received before this date.

Connectionstraces to 1
Traces to 1 document
1 reference not yet in our index
  • 10 CFR 73
Citation graph
cites case law
Proposed Rules
Proposed rule: Reopening of comment period
Cite10 CFR 73
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.