Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2005-07-05 · Pipeline and Hazardous Materials Safety Administration, DOT · Notices

Notices. List of applications delayed more than 180 days

570 words·~3 min read·/register/2005/07/05/05-13125·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4710-24-P DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Office of Hazardous Material Safety; Notice of Delays in Processing of Exemption Applications AGENCY: Pipeline and Hazardous Materials Safety Administration, DOT. ACTION: List of applications delayed more than 180 days. SUMMARY: In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of exemption applications that have been in process for 180 days or more.
The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application. FOR FURTHER INFORMATION CONTACT: Delmer Billings, Office of Hazardous Materials Exemptions and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, 400 Seventh Street, SW., Washington, DC 20590-0001,
(202)366-4535. Key to “Reason for Delay” 1. Awaiting additional information from applicant. 2. Extensive public comment under review. 3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis. 4. Staff review delayed by other priority issues or volume of exemption applications. Meaning of Application Number Suffixes N—New application. M—Modification request. X—Renewal. PM—Party to application with modification request. Issued in Washington, DC, on June 28, 2005. R. Ryan Posten, Exemptions Program Officer, Office of Hazardous Materials Safety Exemptions & Approvals. New Exemption Applications Application No. Applicant Reason for delay Estimated date of completion 13183-N Becton Dickinson, Sandy, UT 4 08/31/2005 13281-N The Dow Chemical Company, Midland, MI 4 08/31/2005 13266-N Luxfer Gas Cylinders, Riverside, CA 4 07/31/2005 13302-N FIBA Technologies, Inc., Westboro, MA 4 07/31/2005 13341-N National Propane Gas Association, Washington, DC 3 07/31/2005 13314-N Sunoco Inc., Philadelphia, PA 4 08/31/2005 13309-N OPW Engineered Systems, Lebanon, OH 4 08/31/2005 13347-N ShipMate, Inc., Torrance, CA 4 08/31/2005 13346-N Stand-By-Systems, Inc., Dallas, TX 1 07/31/2005 14037-N Air Products & Chemicals, Inc., Allentown, PA 4 08/31/2005 14038-N Dow Chemical Company, Midland, MI 1 08/31/2005 14010-N Varsal, LLC, Warminster, PA 4 08/31/2005 13999-N Kompozit-Praha s.r.o., Dysina u Plzne, Czech Republic, CZ 4 07/31/2005 13958-N Department of Defense, Fort Eustis, VA 1 08/31/2005 13957-N T.L.C.C.I, Inc., Franklin, TN 4 08/31/2005 13858-N US Ecology Idaho, Inc. (USEI), Grand View, ID 1 08/31/2005 13582-N Linde Gas LLC (Linde), Independence, OH 4 07/31/2005 13563-N Applied Companies, Valencia, CA 4 08/31/2005 13547-N CP Industries, McKeesport, PA 4 07/31/2005 Modification to Exemptions Application No. Applicant Reason for delay Estimated date of completion 7277-M Structural Composites Industries, Pomona, CA 4 08/31/2005 10019-M Structural Composites Industries, Pomona, CA 4 08/31/2005 10915-M Luxfer Gas Cylinders (Composite Cylinder Division), Riverside, CA 1 07/31/2005 10319-M Amtrol, Inc., West Warwick, RI 4 07/31/2005 13327-M Hawk FRP LLC, Ardmore, OK 1 07/31/2005 7774-M Pipe Recovery Systems, Inc., Houston, TX 4 08/31/2005 13488-M FABER INDUSTRIES SPA, (U.S. Agent: Kaplan Industries, Maple Shade, NJ) 4 08/31/2005 12988-M Air Products & Chemicals, Inc., Allentown, PA 4 08/31/2005 12284-M The American Traffic Safety Services Assn. (ATSSA), Fredericksburg, VA 1 07/31/2005 6263-M Amtrol, Inc., West Warwick, RI 4 08/31/2005 11579-M Dyno Nobel, Inc., Salt Lake City, UT 4 07/31/2005 11241-M Rohm and Haas Co., Philadelphia, PA 1 07/31/2005 7280-M Department of Defense, Ft. Eustis, VA 4 07/31/2005 10878-M Tankcon FRP Inc., Boisbriand, Qc 1, 3 08/31/2005 8162-M Structural Composites Industries, Pomona, CA 4 08/31/2005 8718-M Structural Composites Industries, Pomona, CA 4 08/31/2005 New Exemption Applications Application No. Applicant Reason for delay Estimated date of completion 9649-X U.S. Department of Defense, Fort Eustis, VA 1, 3 07/31/2005 [FR Doc. 05-13125 Filed 7-1-05; 8:45 am]
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
Notices
List of applications delayed more than 180 days
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.