Notices. Notice of license amendment, opportunity to request a hearing, and solicitation of public comments
4,499 words·~20 min read·
/register/2005/06/27/05-12687·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
BILLING CODE 7555-01-M NUCLEAR REGULATORY COMMISSION [Docket No. 40-08838] Notice of Consideration of Amendment Request for an Alternate Decommissioning Schedule for the Department of the Army, U.S. Army Garrison, Rock Island Arsenal, Rock Island, IL, and Opportunity To Request a Hearing AGENCY: Nuclear Regulatory Commission. ACTION: Notice of license amendment, opportunity to request a hearing, and solicitation of public comments. DATES: A request for a hearing must be filed by August 26, 2005.
FOR FURTHER INFORMATION CONTACT: Tom McLaughlin, Project Manager, Decommissioning Directorate, Division of Waste Management and Environmental Protection, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; Telephone:
(301)415-5869; fax number:
(301)415-5398; e-mail: *tgm@nrc.gov.* SUPPLEMENTARY INFORMATION: I. Introduction The Nuclear Regulatory Commission
(NRC)is considering issuance of a license amendment to the Department of the Army (Army as the licensee) to amend its License No. SUB-1435 to authorize an alternate decommissioning schedule pursuant to 10 CFR 40.42(g)(2) for its facility at Jefferson Proving Ground, Madison, Indiana. License No. SUB-1435 authorizes the licensee to possess depleted uranium in the “impact area” of Jefferson Proving Ground. The license amendment request for an alternate decommissioning schedule was submitted by the licensee on May 25, 2005. An NRC administrative review, documented in a letter to the U.S. Army Garrison at Rock Island Arsenal on June 15, 2005, found the license amendment request acceptable to begin a technical review. If the NRC approves the license amendment request, the authorization for an alternate decommissioning schedule will be documented in an amendment to NRC License No. SUB-1435. However, before approving the proposed amendment, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended, and NRC's regulations. These findings will be documented in a Safety Evaluation Report and an Environmental Assessment. II. Opportunity To Request a Hearing The NRC hereby provides notice that this is a proceeding on an application for a license amendment to License No. SUB-1435 to request an alternate decommissioning schedule. In accordance with the general requirements in Subpart C of 10 CFR Part 2, as amended on January 14, 2004 (69 FR 2182), any person whose interest may be affected by this proceeding and who desires to participate as a party must file a written request for a hearing and a specification of the contentions which the person seeks to have litigated in the hearing. In accordance with 10 CFR 2.302 (a), a request for a hearing must be filed with the Commission either by: 1. First class mail addressed to: Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications; 2. Courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852, Attention: Rulemakings and Adjudications Staff, between 7:45 a.m. and 4:15 p.m., Federal work days; 3. E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, *HEARINGDOCKET@NRC.GOV;* or 4. By facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, Attention: Rulemakings and Adjudications Staff, at
(301)415-1101; verification number is
(301)415-1966. In accordance with 10 CFR 2.302 (b), all documents offered for filing must be accompanied by proof of service on all parties to the proceeding or their attorneys of record as required by law or by rule or order of the Commission, including: 1. The applicant, U.S. Army Garrison, 1 Rock Island Arsenal, Rock Island Illinois, 61299, Attention: Alan G. Wilson, Garrison Manager; and 2. The NRC staff, by delivery to the Office of the General Counsel, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852, or by mail addressed to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Hearing requests should also be transmitted to the Office of the General Counsel, either by means of facsimile transmission to
(301)415-3725, or by email to *ogcmailcenter@nrc.gov.* The formal requirements for documents contained in 10 CFR 2.304 (b), (c), (d), and (e), must be met. In accordance with 10 CFR 2.304 (f), a document filed by electronic mail or facsimile transmission need not comply with the formal requirements of 10 CFR 2.304 (b), (c), and (d), as long as an original and two
(2)copies otherwise complying with all of the requirements of 10 CFR 2.304 (b), (c), and
(d)are mailed within two
(2)days thereafter to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff. In accordance with 10 CFR 2.309 (b), a request for a hearing must be filed by August 26, 2005. In addition to meeting other applicable requirements of 10 CFR 2.309, the general requirements involving a request for a hearing filed by a person other than an applicant must state: 1. The name, address, and telephone number of the requester; 2. The nature of the requester's right under the Act to be made a party to the proceeding; 3. The nature and extent of the requester's property, financial or other interest in the proceeding; 4. The possible effect of any decision or order that may be issued in the proceeding on the requester's interest; and 5. The circumstances establishing that the request for a hearing is timely in accordance with 10 CFR 2.309 (b). In accordance with 10 CFR 2.309 (f)(1), a request for hearing or petitions for leave to intervene must set forth with particularity the contentions sought to be raised. For each contention, the request or petition must: 1. Provide a specific statement of the issue of law or fact to be raised or controverted; 2. Provide a brief explanation of the basis for the contention; 3. Demonstrate that the issue raised in the contention is within the scope of the proceeding; 4. Demonstrate that the issue raised in the contention is material to the findings that the NRC must make to support the action that is involved in the proceeding; 5. Provide a concise statement of the alleged facts or expert opinions which support the requester's/petitioner's position on the issue and on which the requester/petitioner intends to rely to support its position on the issue; and 6. Provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. This information must include references to specific portions of the application (including the applicant's environmental report and safety report) that the requester/petitioner disputes and the supporting reasons for each dispute, or, if the requester/petitioner believes the application fails to contain information on a relevant matter as required by law, the identification of each failure and the supporting reasons for the requester's/petitioner's belief. In accordance with 10 CFR 2.309 (g), a request for hearing and/or petition for leave to intervene may also address the selection of the hearing procedures, taking into account the provisions of 10 CFR 2.310. III. Opportunity To Provide Comments In accordance with 10 CFR 20.1405, the NRC is providing notice to individuals in the vicinity of the site that the NRC has received a license amendment request from the Army. The NRC will accept comments concerning this amendment request. Comments with respect to this action should be provided in writing within 30 days of this notice and addressed to Mr. Tom McLaughlin, U.S. NRC, Washington, DC 20555-0001. Comments received after 30 days will be considered if practicable to do so, but only those comments received on or before the due date can be assured consideration. IV. Further Information Documents related to this action, including the application for amendment and supporting documentation, are available electronically at the NRC's Electronic Reading Room at *http://www.nrc.gov/reading-rm/adams.html.* From this site, you can access the NRC's Agency wide Document Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The ADAMS accession number for the document related to this notice is ML051520319. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC Public Document Room PDR Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* These documents may also be viewed electronically on the public computers located at the NRC's PDR, located in O-1 F21, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852. The PDR reproduction contractor will copy documents for a fee. Dated at Rockville, Maryland, this 15th day of June, 2005. For the Nuclear Regulatory Commission. Daniel M. Gillen, Deputy Director, Division of Waste Management and Environment, Office of Nuclear Material Safety and Safeguards. [FR Doc. E5-3319 Filed 6-24-05; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 030-36574] Notice of Availability of Environmental Assessment and Finding of No Significant Impact for License Amendment for the Department of the Army's Facility at Fort Belvoir, VA AGENCY: Nuclear Regulatory Commission. ACTION: Notice of availability. FOR FURTHER INFORMATION CONTACT: Tom McLaughlin, Project Manager, Decommissioning Directorate, Division of Waste Management and Environmental Protection, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; Telephone:
(301)415-5869; fax number:
(301)415-5398; e-mail: *tgm@nrc.gov.* SUPPLEMENTARY INFORMATION: I. Introduction The NRC is considering issuance of a license amendment to the Department of the Army (Army or licensee) for License No. 19-10306-02, to authorize decommissioning for its facility at Fort Belvoir, Virginia. NRC has prepared an Environmental Assessment
(EA)in support of this action in accordance with the requirements of 10 CFR part 51. Based on the EA, the NRC has concluded that a Finding of No Significant Impact (FONSI) is appropriate. II. EA Summary The purpose of this proposed amendment to License No. 19-10306-02 is to authorize the decommissioning of the licensee's Building 7304 at Fort Belvoir, Virginia, for unrestricted use to allow for license termination. The Army was authorized by the NRC on March 31, 1989, to use radioactive materials for research purposes at the site. On May 17, 2004, the Army requested that NRC approve the decommissioning plan for the facility which when completed would permit the site to be released for unrestricted use. Final approval for release of the site for unrestricted use and license termination would be contingent upon NRC staff's approval of the licensee's final status survey report and making the findings required by the Commission's regulations following completion of the licensee's decommissioning activities. The Army's request for the proposed amendment was previously noticed in the **Federal Register** on December 28, 2004 (69 FR 77779), with a notice of an opportunity to request a hearing. No comments or request for a hearing were received. Following a Characterization Survey, the Army found that there are elevated levels of radioactivity on the floor of Building 7304, in the soil beneath the floor, in the wall storage vaults, and in the floor vaults. These elevated levels indicate the need for the removal of the Building 7304 structure and any soil that is above the soil screening criteria, then transport of the contaminated waste to an authorized disposal facility. The NRC staff determined that all steps in the proposed decommissioning could be accomplished in compliance with the NRC public and occupational dose limits, effluent release limits, and residual radioactive material limits. In addition, the staff concluded that approval of the decommissioning of Building 7304 at Fort Belvoir, Virginia, in accordance with the commitments in NRC License No. 19-10306-02 and the final decommissioning plan, would not result in a significant adverse impact on the environment. If the NRC approves the license amendment, the authorization will be documented in an amendment to NRC License No. 19-10306-02. However, before approving the proposed amendment, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended, and NRC's regulations. These findings will be documented in a Safety Evaluation Report in addition to the EA. III. Finding of No Significant Impact The staff has prepared the EA (summarized above) in support of the Army's proposed decommissioning. The NRC staff has concluded that there will be no adverse environmental impacts associated with approving the Army's license amendment request for decommissioning Building 7304. The radiological environmental impacts from the proposed amendment are bounded by the impacts evaluated by NUREG-1496, Volumes 1-3, “Generic Environmental Impact Statement in Support of Rulemaking on Radiological Criteria for License Termination of NRC-Licensed Facilities” (ML042310492, ML042320379, and ML042330385). The staff has also found that the non-radiological impacts are not significant. On the basis of the EA, the NRC has concluded that the environmental impacts from the action are expected to be insignificant and has determined that an environmental impact statement does not need to be prepared for the action. IV. Further Information Documents related to this action, including the application for amendment and supporting documentation, are available electronically at the NRC's Electronic Reading Room at *http://www.nrc.gov/reading-rm/adams.html.* From this site, you can access the NRC's Agency-wide Document Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The ADAMS accession number for the documents related to this notice are: The Army's package to NRC dated May 17, 2004, ML041490071; EA prepared for this action, ML050810012; and **Federal Register** Notice for Amendment No. 2, ML050960044. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC Public Document Room
(PDR)Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* Any questions should be referred to Thomas McLaughlin, Division of Waste Management and Environmental Protection, U.S. Nuclear Regulatory Commission, Washington DC 20555, Mailstop T-7E18, telephone
(301)415-5869, fax
(301)415-5397. Dated in Rockville, Maryland, this 21st day of June, 2005. For the Nuclear Regulatory Commission. Daniel M. Gillen, Deputy Director, Decommissioning Directorate, Division of Waste Management and Environmental Protection, Office of Nuclear Material Safety and Safeguards. [FR Doc. E5-3321 Filed 6-24-05; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 50-255] Nuclear Management Company, LLC, Palisades Nuclear Plant; Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process Nuclear Management Company, LLC
(NMC)has submitted an application for renewal of Facility Operating License DPR-20 for an additional 20 years of operation at the Palisades Nuclear Plant (Palisades). Palisades is located on the eastern shore of Lake Michigan in Covert Township on the western side of Van Buren County, Michigan, approximately 4.5 miles south of the city limits of South Haven, Michigan. The operating license for Palisades expires on March 24, 2011. The application for renewal was received on March 31, 2005, pursuant to title 10 of the Code of Federal Regulations (10 CFR) part 54. A notice of receipt and availability of the application, which included the environmental report (ER), was published in the **Federal Register** on April 12, 2005 (70 FR 19104). A notice of acceptance for docketing of the application for renewal of the facility operating license was published in the **Federal Register** on June 8, 2005 (70 FR 33533). The purpose of this notice is to inform the public that the U.S. Nuclear Regulatory Commission
(NRC)will be preparing an environmental impact statement
(EIS)in support of the review of the license renewal application and to provide the public an opportunity to participate in the environmental scoping process, as defined in 10 CFR 51.29. In addition, as outlined in title 36 of the Code of the Federal Regulations part 800.8, “Coordination with the National Environmental Policy Act,” the NRC plans to coordinate compliance with section 106 of the National Historic Preservation Act in meeting the requirements of the National Environmental Policy Act of 1969 (NEPA). In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, NMC submitted the ER as part of the application. The ER was prepared pursuant to 10 CFR part 51 and is available for public inspection at the NRC's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible at *http://www.nrc.gov/reading-rm/adams.html,* which provides access through the NRC's Public Electronic Reading Room link. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail to *pdr@nrc.gov.* The application may also be viewed on the Internet at *http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html.* In addition, the South Haven Memorial Library (314 Broadway St., South Haven, MI 49090) has made the ER available for public inspection. This notice advises the public that the NRC intends to gather the information necessary to prepare a plant-specific supplement to the Commission's “Generic Environmental Impact Statement [GEIS] for License Renewal of Nuclear Plants,” (NUREG-1437) in support of the review of the application for renewal of the Palisades operating license for an additional 20 years. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC is required by 10 CFR 51.95 to prepare a supplement to the GEIS in connection with the renewal of an operating license. This notice is being published in accordance with NEPA and the NRC's regulations found in 10 CFR part 51. The NRC will first conduct a scoping process for the supplement to the GEIS and, as soon as practicable thereafter, will prepare a draft supplement to the GEIS for public comment. Participation in the scoping process by members of the public and local, State, tribal, and Federal government agencies is encouraged. The scoping process for the supplement to the GEIS will be used to accomplish the following: 1. Define the proposed action which is to be the subject of the supplement to the GEIS. a. Determine the scope of the supplement to the GEIS and identify the significant issues to be analyzed in depth. b. Identify and eliminate from detailed study those issues that are peripheral or that are not significant. c. Identify any environmental assessments and other ElSs that are being or will be prepared that are related to, but are not part of the scope of the supplement to the GEIS being considered. d. Identify other environmental review and consultation requirements related to the proposed action. e. Indicate the relationship between the timing of the preparation of the environmental analyses and the Commission's tentative planning and decision-making schedule. f. Identify any cooperating agencies and, as appropriate, allocate assignments for preparation and schedules for completing the supplement to the GEIS to the NRC and any cooperating agencies. g. Describe how the supplement to the GEIS will be prepared, and include any contractor assistance to be used. The NRC invites the following entities to participate in scoping: a. The applicant, Nuclear Management Company, LLC. b. Any Federal agency that has jurisdiction by law or special expertise with respect to any environmental impact involved, or that is authorized to develop and enforce relevant environmental standards. c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards. d. Any affected Indian tribe. e. Any person who requests or has requested an opportunity to participate in the scoping process. f. Any person who has petitioned or intends to petition for leave to intervene. In accordance with 10 CFR 51.26, the scoping process for an EIS may include a public scoping meeting to help identify significant issues related to a proposed activity and to determine the scope of issues to be addressed in an EIS. The NRC has decided to hold public meetings for the Palisades license renewal supplement to the GEIS. The scoping meetings will be held at Lake Michigan College, 125 Veterans Boulevard, South Haven, Michigan 49090, on Thursday, July 28, 2005. There will be two sessions to accommodate interested parties. The first session will convene at 1:30 p.m. and will continue until 4:30 p.m., as necessary. The second session will convene at 7 p.m. with a repeat of the overview portions of the meeting and will continue until 10 p.m., as necessary. Both meetings will be transcribed and will include:
(1)An overview by the NRC staff of the NEPA environmental review process, the proposed scope of the supplement to the GEIS, and the proposed review schedule; and
(2)the opportunity for interested government agencies, organizations, and individuals to submit comments or suggestions on the environmental issues or the proposed scope of the supplement to the GEIS. Additionally, the NRC staff will host informal discussions one hour before the start of each session at Lake Michigan College. No formal comments on the proposed scope of the supplement to the GEIS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meetings or in writing, as discussed below. Persons may register to attend or present oral comments at the meetings on the scope of the NEPA review by contacting Mr. William Dam by telephone at 1-800-368-5642, extension 4014, or by e-mail to the NRC at *PalisadesEIS@nrc.gov* no later than July 22, 2005. Members of the public may also register to speak at the meeting within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. Members of the public who have not registered may also have an opportunity to speak, if time permits. Public comments will be considered in the scoping process for the supplement to the GEIS. Mr. Dam will need to be contacted no later than July 15, 2005, if special equipment or accommodations are needed to attend or present information at the public meeting, so that the NRC staff can determine whether the request can be accommodated. Members of the public may send written comments on the environmental scope of the Palisades license renewal review to: Chief, Rules and Directives Branch, Division of Administrative Services, Office of Administration, Mailstop T-6D59, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this **Federal Register** notice. Comments may also be delivered to the NRC, Room T-6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. during Federal workdays. To be considered in the scoping process, written comments should be postmarked by August 22, 2005. Electronic comments may be sent by e-mail to the NRC at *PalisadesEIS@nrc.gov* and should be sent no later than August 22, 2005, to be considered in the scoping process. Comments will be available electronically and accessible through ADAMS at *http://www.nrc.gov/reading-rm/adams.html.* Participation in the scoping process for the supplement to the GEIS does not entitle participants to become parties to the proceeding to which the supplement to the GEIS relates. Notice of opportunity for a hearing regarding the renewal application was the subject of the aforementioned **Federal Register** notice (70 FR 33533). Matters related to participation in any hearing are outside the scope of matters to be discussed at this public meeting. At the conclusion of the scoping process, the NRC will prepare a concise summary of the determination and conclusions reached, including the significant issues identified, and will send a copy of the summary to each participant in the scoping process. The summary will also be available for inspection in ADAMS at *http://www.nrc.gov/reading-rm/adams.html.* The staff will then prepare and issue for comment the draft supplement to the GEIS, which will be the subject of separate notices and separate public meetings. Copies will be available for public inspection at the above-mentioned addresses, and one copy per request will be provided free of charge. After receipt and consideration of the comments, the NRC will prepare a final supplement to the GEIS, which will also be available for public inspection. Information about the proposed action, the supplement to the GEIS, and the scoping process may be obtained from Mr. Dam at the aforementioned telephone number or e-mail address. Dated in Rockville, Maryland, this 20th day of June, 2005. For the Nuclear Regulatory Commission. Pao-Tsin Kuo, Program Director, License Renewal and Environmental Impacts Program, Division of Regulatory Improvement Programs, Office of Nuclear Reactor Regulation. [FR Doc. E5-3320 Filed 6-24-05; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION Sunshine Act; Meetings Date: Weeks of June 27, July 4, 11, 18, 25, August 1, 2005. Place: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, Maryland. Status: Public and closed. Matters to be Considered: Week of June 27, 2005 Tuesday, June 28, 2005 9:30 a.m. Briefing on Equal Employment Opportunity
(EEO)Program (Public Meeting) (Contact: Corenthis Kelley, 301-415-7380). This meeting will be webcast live at the Web address— *http://www.nrc.gov.* Wednesday, June 29, 2005 9:25 a.m. Affirmation Session (Public Meeting) (Tentative). a. Yankee Atomic Electric Co. (Yankee Nuclear Power Station), Licensee's and NRC Staff's appeal of LBP-04-27 (Tentative) b.
(1)Exelon Generation Company, LLC (Early Site Permit for Clinton ESP Site), Docket No. 52-007-ESP;
(2)Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), Docket No. 52-008-ESP;
(3)System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), Docket No. 52-009-ESP;
(4)Louisiana Energy Services, L.P. (National Enrichment Facility), Docket No. 70-3103-ML;
(5)USEC Inc. (American Centrifuge Plant), Docket No. 70-7004, Guidance on Mandatory Hearings (Tentative). 9:30 a.m. Discussion of Security Issues (Closed—Ex. 1) Week of July 4, 2005 - Tentative There are no meetings scheduled for the week of July 4, 2005. Week of July 11, 2005 - Tentative There are no meetings scheduled for the week of July 11, 2005. Week of July 18, 2005 - Tentative There are no meetings scheduled for the week of July 18, 2005. Week of July 25, 2005 - Tentative There are no meetings scheduled for the week of July 25, 2005. Week of August 1, 2005 - Tentative There are no meetings scheduled for the week of August 1, 2005. *The Schedule for Commission meetings is subject to change on short notice. To verify the status of meetings call (recording)—(301) 415-1292. Contact person for more information: Michelle Schroll,
(301)415-1662. The NRC Commission Meeting Schedule can be found on the Internet at: *http://www.nrc.gov/what-we-do/policy-making/schedule.html* . The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format ( *e.g.* braille, large print), please notify the NRC's Disability Program Coordinator, August Spector, at 301-415-7080, TDD: 301-415-2100, or by e-mail at *aks@nrc.gov.* Determinations on requests for reasonable accommodation will be made on a case-by-case basis. This notice is distributed by mail to several hundred subscribers; if you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301-415-1969). In addition, distribution of this meeting notice over the Internet system is available. If you are interested in receiving this Commission meeting schedule electronically, please send an electronic message to *dkw@nrc.gov.* Dated: June 22, 2005. R. Michelle Schroll Office of the Secretary [FR Doc. 05-12687 Filed 6-23-05; 8:45 am]
Connectionstraces to 11
Traces to 11 documents
CFR
- Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas.§ 40.42
- Filing of documents.§ 2.302
- Formal requirements for documents; signatures; acceptance for filing.§ 2.304
- Hearing requests, petitions to intervene, requirements for standing, and contentions.§ 2.309
- Selection of hearing procedures.§ 2.310
- Public notification and public participation.§ 20.1405
- Scoping-environmental impact statement and supplement to environmental impact statement.§ 51.29
- Postconstruction environmental reports.§ 51.53
- Contents of application—environmental information.§ 54.23
- Postconstruction environmental impact statements.§ 51.95
- Requirement to publish notice of intent and conduct scoping process.§ 51.26
2 references not yet in our index
- 10 CFR 2
- 10 CFR 51
Citation graph
cites case law
Notices
Notice of license amendment, opportunity to request a hearing, and solicitation of public comments
Cite10 CFR 2
Cite10 CFR 51
Cites 13 · showing 11Cited by 0 across 0 sources