Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2005-06-16 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

487 words·~2 min read·/register/2005/06/16/05-11849·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 05-11849 · CGD08-05-039 · 33 CFR 117

Summary

The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Tule Lake Vertical Lift Span Highway and Railroad Bridge across the Corpus Christi—Port Aransas Channel, mile 14.0, at Corpus Christi, Nueces County, TX. This deviation allows the bridge to remain closed to navigation for six hours each day for three consecutive days. This temporary deviation is necessary for the repair of the haul rope anchors of the drawbridge.

Dates

This deviation is effective from 8:30 a.m. on Tuesday, July 12, 2005, through 2:30 p.m. on Thursday, July 14, 2005.

Supplementary Information

The Port of Corpus Christi Authority has requested a temporary deviation in order to repair the haul rope anchors of the Tule Lake vertical lift span bridge across Corpus Christi—Port Aransas Channel, mile 14.0 at Corpus Christi, Nueces County, Texas. This temporary deviation will allow the bridge to remain in the closed-to-navigation position from 8:30 a.m. to 2:30 p.m. on Tuesday, July 12, on Wednesday, July 13, and on Thursday, July 14, 2005. The bridge has a vertical clearance of 9.0 feet above mean high water, elevation 1.0 foot Mean Sea Level and 11.0 feet above mean low water, elevation −1.0 foot Mean Sea Level in the closed-to-navigation position. Navigation at the site of the bridge consists mainly of oil tankers and tows with barges. Recreational vessels do not generally transit this segment of the waterway. Due to prior experience, as well as coordination with waterway users, it has been determined that this three-day partial closure will not have a significant effect on these vessels. The bridge normally opens to pass navigation an average of 850 times per month. The bridge opens on signal as required by 33 CFR 117.5. The bridge may not be able to open for emergencies during the closure period. Alternate routes are not available. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 9, 2005. Marcus Redford, Bridge Administrator. [FR Doc. 05-11849 Filed 6-15-05; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.