Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2005-04-14 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

9,409 words·~43 min read·/register/2005/04/14/05-7554·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4000-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EC05-54-000, et al.] Dynegy, Inc., et al.; Electric Rate and Corporate Filings April 5, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Dynegy Inc. [Docket No. EC05-64-000] Take notice that on March 30, 2005, Dynegy Inc. (Applicant), on behalf of its public utility subsidiaries, submitted an application pursuant to section 203 of the Federal Power Act for authorization of a transfer of indirect control of its jurisdictional facilities, arising from the proposed change in the state of incorporation of Applicant from Illinois to Delaware. *Comment Date:* 5 p.m.
Eastern Time on April 20, 2005. 2. Bear Swamp Power Company LLC [Docket No. EG05-54-000] Take notice that on March 17, 2005, Bear Swamp Power Company LLC
(BSPC)filed an application for a determination of exempt wholesale generator status pursuant to section 32(a)(1) of the Public Utility Holding Company Act of 1935, as amended, 15 U.S.C. 79z-5a, and Part 365 of the Commission's regulations. BSPC states that it is a Delaware limited liability company that will operate and subsequently acquire and operate the Bear Swamp Pumped Storage Hydroelectric Facility and the Fife Brook Hydroelectric Facility. *Comment Date:* 5 p.m. Eastern Time on April 27, 2005. 3. Michigan Electric Transmission Company, LLC [Docket No. ER03-1341-002] Take notice that on March 30, 2005, Michigan Electric Transmission Company, LLC, (Michigan Electric) in compliance with the Commission's order issued November 17, 2003, 105 FERC ¶ 61,214, submitted schedules showing its actual weighted average cost of long-term debt for calendar year 2004. Michigan Electric states that copies of this filing were served on all parties included on the Commission's official service list established in this proceeding. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 4. Public Service Company of New Mexico [Docket No. ER05-741-000] Take notice that on March 30, 2005, Public Service Company of New Mexico
(PNM)tendered for filing a notice of change in rates and the provision for compensation for line losses for firm point-to-point and network integration transmission services under its FERC Electric Tariff, Second Revised Volume No. 4 (OATT), and for firm point-to-point transmission services under non-OATT bilateral contracts between PNM and its firm transmission service customers. PNM requests an effective date of June 1, 2005, for the proposed rate changes. PNM states that copies of the filing have been served on all affected customers, the New Mexico Public Regulation Commission, and the New Mexico Attorney General. Copies of the filing are available for public inspection at PNM's offices in Albuquerque, New Mexico. *Comment Date:* 5 p.m. Eastern Time April 20, 2005. 5. Cambridge Electric Light Company; Commonwealth Electric Company [Docket No. ER05-742-000] Take notice that on March 30, 2005, Cambridge Electric Light Company and Commonwealth Electric Company (collectively, Companies) submitted revisions to Schedule 21-CEL and Schedule 21-CEC of Section II of the Transmission, Markets and Services Tariff of ISO New England Inc., FERC Electric Tariff, No. 3 (ISO-NE Tariff). The Companies request an effective date of June 1, 2005 *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 6. Pacific Summit Energy LLC [Docket No. ER05-743-000] Take notice that on March 30, 2005, Pacific Summit Energy LLC
(PSE)tendered for filing with the Commission, pursuant to 18 CFR 35.13 (2004), a petition to accept for filing its initial market-based rate tariff to sell electric power and ancillary services; waive certain of the Commission's regulations promulgated under the Federal Power Act; and grant certain blanket approvals under other such Commission regulations. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 7. Major Lending, LLC [Docket No. ER05-744-000] Take notice that on March 30, 2005, Major Lending, LLC (Major Lending) petitioned the Commission for acceptance of its Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at market based rates; and waiver of certain Commission regulations. Major Lending states that it intends to engage in wholesale electric power and energy purchases and sales as a marketer. Major Lending further states it is not in the business of generating or transmitting electric power. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 8. Northeast Utilities Company [Docket No. ER05-745-000] Take notice that on March 30, 2005, Northeast Utilities Service Company (NUSCO), on behalf of its operating companies, filed a service agreement with Unitil Energy Systems, Inc. NUSCO requests that the service agreement be made effective June 1, 2005. NUSCO states that copies of the filing were served on the customer and the Connecticut, Massachusetts and New Hampshire state regulatory commissions. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 9. PSI Energy, Inc. [Docket No. ER05-746-000] Take notice that on March 30, 2005, PSI Energy, Inc.,
(PSI)tendered for filing the Transmission and Local Facilities (T&LF) Agreement for Calendar Year 2003 Reconciliation between PSI and Wabash Valley Power Association, Inc., and between PSI and Indiana Municipal Power Agency, designated as PSI's Rate Schedule FERC No. 253. *Comment Date:* 5 p.m. Eastern Time on April 12, 2005. 10. ISO New England Inc. and New England Power Pool [Docket No. ER05-747-000] Take notice that on March 30, 2005, ISO New England Inc., joined by the New England Power Pool (NEPOOL) Participants Committee, filed amendments to Section III of the Transmission, Markets and Services Tariff of ISO New England Inc., FERC Electric Tariff No. 3. NEPOOL states that the amendments make clarifying changes to provisions governing the Forward Reserve Market and partial de-listing of Resources. The ISO and NEPOOL state that paper copies of the filing were sent to the New England state governors and regulatory agencies, and electronic copies were sent to the Governance Participants. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 11. California Independent System Operator Corporation [Docket No. ER05-748-000] Take notice that on March 30, 2005, the California Independent System Operator Corporation (ISO), tendered for filing a Notice of Cancellation of the letter agreement between the ISO and Reliant Energy Services
(RES)and the letter agreement between the ISO and Sempra Energy Resources (SER), both dated and effective as of December 4, 2003. ISO states that the purpose of this filing is to accommodate a planned change in the dynamic scheduling of the El Dorado Energy Merchant Power Plant planned for April 1, 2005. The ISO states that this filing has been served on RES, SER, the California Public Utilities Commission, the California Electricity Oversight Board, and all entities that are on the official service list. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. 12. California Independent System Operator Corporation [Docket No. ER05-749-000] Take notice that on March 30, 2005the California Independent System Operator Corporation (ISO), tendered for filing a Dynamic Scheduling Agreement for Scheduling Coordinators
(DSA)between the ISO and Reliant Energy Services, Inc.
(RES)for acceptance by the Commission. The ISO requests an effective date of April 1, 2005. The ISO states that this filing has been served on RES, Sempra Energy Resources, the California Public Utilities Commission, and the California Electricity Oversight Board. *Comment Date:* 5 p.m. Eastern Time on April 20, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E5-1753 Filed 4-13-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG05-57-000, et al.] Bellows Falls Power Company, LLC, et al.; Electric Rate and Corporate Filings April 7, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Bellows Falls Power Company, LLC [Docket No. EG05-57-000] Take notice that on April 4, 2005, Bellows Falls Power Company, LLC
(BFPC)filed an application for a determination of exempt wholesale generator status pursuant to section 32(a)(1) of the Public Utility Holding Company Act of 1935, as amended, 15 U.S.C. 79z-5a, and Part 365 of the Commission's Regulations, 18 CFR Part 365. BFPC states that it is a Delaware limited liability company that will lease and operate the Bellows Falls Hydroelectric Project from the Town of Rockingham, Vermont. *Comment Date:* 5 p.m. Eastern Standard Time on April 25, 2005. 2. San Diego Gas & Electric Company, Complainants v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator and the California Power Exchange, Respondents; Investigation of Practices of the California Independent System Operator and the California Power Exchange [Docket Nos. EL00-95-127 and EL00-98-114] On March 21, 2005, the City of Los Angeles Department of Water and Power (LADWP) submitted its compliance filing containing recalculations of emission cost offsets to be included in the financial reruns of the California Independent System Operator Corporation, pursuant to the Commission's Order issued November 23, 2004 in Docket Nos. EL00-95-100 and EL00-98-088, 109 FERC ¶ 61,218 (2004). *Comment Date:* 5 p.m. Eastern Time on April 14, 2005. 3. The Empire District Electric Company [Docket No. ER99-1757-008] Take notice that on March 31, 2005, The Empire District Electric Company (Empire) submitted a compliance filing, pursuant to the Commission's order issued March 3, 2005 in Docket No. ER99-1757-002, 110 FERC ¶ 61,214 (2005). Empire states that copies of the filing have been served on all parties on the official service list in this proceeding. *Comment Date:* 5 p.m. Eastern Time on April 21, 2005. 4. Indeck-Oswego Limited Partnership [Docket No. ER02-1081-002] Take notice that on April 1, 2005, Indeck-Oswego Limited Partnership (Indeck Oswego) submitted an updated market power analysis and an amendment to its market-based rate tariff to incorporate the reporting requirements adopted by the Commission in Order No. 652, *Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority,* 110 FERC ¶ 61,097 (2005). *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 5. Cobb Electric Membership Corp. [Docket No. ER01-1860-002] Take notice that on April 1, 2005, Cobb Electric Membership Corp.
(Cobb)submitted an amendment to its Triennial Updated Market Analysis originally filed on July 12, 2004 in Docket No. ER01-1860-001. In addition, Cobb submitted revised tariff sheets incorporating the market behavior rules adopted by the Commission in *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorizations,* 105 FERC ¶ 61,218 (2003). Cobb's revised tariff sheets also incorporate the reporting requirements adopted by the Commission in Order No. 652, *Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority,* 110 FERC ¶ 61,097
(2005)and includes language indicating that Cobb will not make any sales to affiliates without prior Commission authorization pursuant to section 205 of the Federal Power Act. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 6. Marina Energy, L.L.C. [Docket No. ER03-715-002] Take notice that on April 1, 2005, Marina Energy, L.L.C. submitted an amendment to its market-based rate tariff to incorporate the market behavior rules adopted by the Commission in *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorizations,* 105 FERC ¶ 61,218
(2003)and to incorporate the reporting requirements adopted by the Commission in Order No. 652, *Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority,* 110 FERC ¶ 61,097 (2005). *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 7. New York Independent System Operator, Inc. [Docket No. ER04-1138-002] Take notice that on April 1, 2005, the New York Independent System Operator, Inc. (NYISO) filed a compliance filing pursuant to the Commission's letter order issued March 9, 2005 in Docket No. ER04-1138-001. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 8. North American Electric Reliability Council [Docket No. ER05-580-001] Take notice that on April 1, 2005, the North American Electric Reliability Council submitted a compliance filing pursuant to the Commission's order issued March 30, 2005 in Docket No. ER05-580-000, 110 FERC ¶ 61,388 (2005). *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 9. San Joaquin Cogen, L.L.C. [Docket No. ER05-698-001] Take notice that on April 1, 2005, San Joaquin Cogen, L.L.C. (San Joaquin) filed revisions to sections 6 and 10 of the proposed market-based rate tariff sheets initially filed in Docket No. ER05-698-000 on March 11, 2005. San Joaquin requests an effective date of April 15, 2005. *Comment Date:* 5 p.m. Eastern Time on April 14, 2005. 10. ISO New England Inc. [Docket No. ER05-762-000] Take notice that on April 1, 2005, ISO New England Inc. (the ISO) submitted revised tariff sheets for its Transmission, Markets and Services Tariff, FERC Electric Tariff No. 3 (ISO Tariff). The ISO states that its filing seeks to conform its financial assurance policies (Exhibits IA and IC to Section I of the ISO Tariff) and its Market Rule 1 (Section III of the ISO Tariff) to the provisions filed by the New England Power Pool (NEPOOL) Participants Committee in Docket Nos. ER05-361-000 and ER05-403-000 and accepted by the Commission on February 10, 2005 in *ISO New England Inc.,* 110 FERC ¶ 61,111
(2005)and by letter order issued on February 22, 2005 in *New England Power Pool,* 110 FERC ¶ 61,180 (2005). The ISO states that paper copies of the filing were sent to the New England state governors and regulatory agencies, and electronic copies were sent to the ISO's Governance Participants. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 11. Southern California Edison Company [Docket No. ER05-763-000] Take notice that on April 1, 2005, Southern California Edison Company
(SCE)submitted proposed revisions to SCE's Transmission Owner Tariff, Second Revised Volume No. 6, Appendix VI, to reflect the incurrence by SCE of reliability services costs associated with the California Independent System Operator's M-438 Operating Procedure through contractual means. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 12. Montana Alberta Tie Ltd. [Docket No. ER05-764-000] Take notice that on April 1, 2005, Montana Alberta Tie Ltd.
(MATL)filed an application for authority to sell transmission rights at market-based rates. MATL states that is proposes to develop a 230kV AC power transmission line running from Lethbridge, Alberta, Canada to Great Falls, Montana. MATL requests certain limited waivers of the Commission's regulations. MATL states that the filing has been served on the Alberta Electric System Operator, Alberta Energy and Utilities Board, National Energy Board, NorthWestern Energy and regulators in the State of Montana. MATL also states that the filing has been posted on its Web site at *http://www.matl.ca.* *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 13. New England Power Pool [Docket No. ER05-765-000] Take notice that on April 1, 2005, the New England Power Pool (NEPOOL) Participants Committee filed for acceptance materials to permit NEPOOL
(1)to expand its membership in include Dennis Beverage Company Inc. (Dennis Beverage), Dennis Energy Company (Dennis Energy) and LP&T Energy LLC (LP&T); and
(2)to terminate the membership of Entergy-Koch Trading, LP (Entergy-Koch). The Participants Committee requests an effective date of April 1, 2005 for the NEPOOL membership of Dennis Beverage, Dennis Energy and LP&T Energy and a March 1, 2005 effective date for the termination of Entergy-Koch. The Participants Committee states that copies of the filing were sent to the New England state governors and regulatory commissions and the participants in NEPOOL. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 14. Soyland Power Cooperative, Inc. [Docket No. ER05-766-000] Take notice that on April 1, 2005, Soyland Power Cooperative, Inc. (Soyland) tendered for filing a proposed clarification to its formulary rate—Rate Schedule A. Soyland states that Rate Schedule A is the formulary rate under which Soyland recovers the costs associated with its service to its members pursuant to the wholesale power contract that Soyland has with each member. Soyland requests an effective date of June 1, 2005. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 15. ISO New England Inc.; New England Power Pool Participants Committee [Docket No. ER05-767-000] Take notice that on April 1, 2005, ISO New England Inc. (the ISO) and the New England Power Pool (NEPOOL) Participants Committee submitted an application to revise Market Rule 1 to modify the eligibility criteria for offer-based Reference Levels. The ISO and NEPOOL state that copies of the filing have been served electronically on all NEPOOL Participants, and paper copies have been provided to the Governors and utility regulatory agencies of the New England states. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 16. Central Maine Power Company [Docket No. ER05-768-000] Take notice that on April 1, 2005, Central Maine Power Company
(CMP)submitted an executed Large Generator Interconnection Agreement between CMP and Miller Hydro Group, designated as ISO New England, Inc., FERC Electric Tariff No. 3, Service Agreement No. IA-CMP-3. CMP requests an effective date of March 1, 2005. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 17. Central Maine Power Company [Docket No. ER05-769-000] Take notice that on April 1, 2005, Central Maine Power Company
(CMP)submitted an unexecuted Small Generator Interconnection Agreement between CMP and the City of Lewiston, Maine, designated as ISO New England, Inc., FERC Electric Tariff No. 3, Service Agreement No. IA-CMP-2. CMP has requested an effective date of March 1, 2005. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 18. Central Maine Power Company [Docket No. ER05-770-000] Take notice that on April 1, 2005, Central Maine Power Company
(CMP)submitted an unexecuted Large Generator Interconnection Agreement between CMP and the International Paper Company designated as ISO New England, Inc., FERC Electric Tariff No. 3, Service Agreement No. IA-CMP-1. CMP has requested an effective date of March 1, 2005. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 19. Cinergy Services, Inc. [Docket No. ER05-771-000] Take notice that on April 1, 2005, Cinergy Services, Inc. (Cinergy), acting as agent for and on behalf of The Cincinnati Gas & Electric Company, and Ohio Valley Electric Corporation tendered for filing an amendment to a Facility Agreement by and between The Cincinnati Gas & Electric Company and Ohio Valley Electric Corporation. Cinergy states that copies of the filing have been served on the Indiana Utility Regulatory Commission, Kentucky Public Service Commission, Public Utilities Commission of Ohio, Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, L.L.C. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 20. Reliant Energy Aurora, LP [Docket No. ER05-772-000] Take notice that on April 1, 2005, Reliant Energy Aurora, LP (Aurora) submitted for filing a notice of cancellation of its FERC Electric Rate Schedule No. 1. Aurora requests an effective date of April 1, 2005. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 21. Reliant Energy Shelby County, LP [Docket No. ER05-773-000] Take notice that on April 1, 2005, Reliant Energy Shelby County, LP (Shelby County) submitted for filing a notice of cancellation of its FERC Electric Rate Schedule No. 1. Shelby County requests an effective date of April 1, 2005. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 22. Northwest Regional Transmission Association [Docket No. ER05-774-000] Take notice that on April 1, 2005, Northwest Regional Transmission Association
(NRTA)submitted for filing a notice of termination of NRTA. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. 23. Hawi Renewable Development, LLC [Docket No. QF05-88-000] Take notice that on April 1, 2005, Hawi Renewable Development, LLC, 63-655 19th Avenue, P.O. Box 58-1043, North Palm Springs, CA 92258, filed with an application for certification of a facility as a qualifying small power production facility pursuant to 18 CFR 292.207(b) of the Commission's regulations. Applicant seeks Commission certification of a 10.56 MW wind-powered small power production facility (the “Facility”) located near the town of Hawi on the Island of Hawaii in Hawaii. The primary energy source to be used by the Facility is wind. Applicant will interconnect and sell electric energy to Hawaii Electric Light Company, Inc. *Comment Date:* 5 p.m. Eastern Time on April 22, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov* . Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at *http://www.ferc.gov* , using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov* , or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E5-1754 Filed 4-13-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER95-1007-018, et al.] Logan Generating Company, L.P., et al.; Electric Rate and Corporate Filings April 6, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Logan Generating Company, L.P., Madison Windpower, LLC, Plains End, LLC [Docket Nos. ER95-1007-018, ER00-1742-002, ER01-2741-003] Take notice that on March 31, 2005, Logan Generating Company, L.P. (Logan), Madison Windpower, LLC (Madison) and Plains End, LLC (Plains End) (collectively, Applicants) filed a consolidated triennial updated market analysis. Applicants also filed amended market-based rate tariffs that
(1)update the issuing officer as a result of changes in the upstream ownership of Applicants;
(2)incorporate the Commission's reporting requirement for changes in status set forth in Order No. 652, *Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority* , 110 FERC 61,097 (2005); and
(3)with respect to the tariffs of Madison and Plains End, incorporate the market behavior rules adopted by the Commission in *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorizations* , 105 FERC ¶ 61,218 (2003). Further, Madison has requested authorization to resell firm transmission rights and Madison and Plains End have requested termination of the codes of conduct on file as part of the market-based rate tariffs, because they are no longer affiliated with Pacific Gas and Electric Company. Applicants state that copies of the filing were served on the parties on the official service lists in these proceedings. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 2. Snapping Shoals Electric Membership Corp. [Docket No. ER01-1994-002] Take notice that on March 31, 2005, Snapping Shoals Electric Membership Corp. (Snapping Shoals) submitted an amendment to its Triennial Updated Market Analysis originally filed on July 12, 2004, as corrected on July 13, 2004, in Docket No. ER01-1994-002. In addition, Snapping Shoals submitted revised tariff sheets incorporating the market behavior rules adopted by the Commission in *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorizations* , 105 FERC ¶ 61,218 (2003). Snapping Shoals' revised tariff sheets also incorporate the reporting requirements adopted by the Commission in Order No. 652, *Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority* , 110 FERC ¶ 61,097
(2005)and include language indicating that Snapping Shoals will not make any sales to affiliates without prior Commission authorization pursuant to section 205 of the Federal Power Act. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 3. Great Lakes Hydro America, LLC [Docket No. ER02-2397-003] Take notice that on March 30, 2005, Great Lakes Hydro America, LLC
(GLHA)submitted revised tariff sheets to incorporate the change in status reporting requirement adopted by the Commission in Order No. 652, *Reporting Requirement for Changes in Status for Public Utilities with Market-Based Rate Authority* , 110 FERC ¶ 61,097 (2005). GLHA requests an effective date of March 21, 2005. GLHA states that copies of the filing have been served on the parties on the official service list for this proceeding. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 4. Devon Power LLC, Middletown Power LLC, Montville Power LLC, Norwalk Power LLC, NRG Power Marketing Inc. [Docket No. ER04-23-012] Take notice that on March 31, 2005, Devon Power LLC, Middletown Power LLC, Montville Power LLC, and Norwalk Power LLC (collectively NRG) submitted a refund report showing the refunds made to ISO New England as the result of the Commission's Order Approving Uncontested Settlement issued January 27, 2005, in *ISO New England Inc., et al.* , 110 FERC ¶ 61,079 (2005). *Comment Date:* 5 p.m. eastern time on April 21, 2005. 5. Southern California Edison Company [Docket No. ER04-316-005] Take notice that on March 31, 2005, Southern California Edison Company (SCE), on behalf of its affiliate, Mountainview Power Company, LLC, submitted a compliance filing pursuant to the Commission's order issued February 25, 2004, in Docket No. ER04-316-000, 106 FERC ¶ 61,813 (2004). SCE states that copies of the filing were served on the parties on the official service list in this proceeding. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 6. Midwest Independent Transmission, System Operator, Inc., Ameren Services, Company, et al. [Docket Nos. ER05-6-017, EL04-135-019, EL02-111-037, and EL03-212-033] Take notice that on March 31, 2005, the Midwest Independent Transmission Operator, Inc. (Midwest ISO) and Midwest ISO Transmission Owners (collectively, Applicants) jointly submitted a compliance filing pursuant to the Commission's order issued November 18, 2004, in Docket No. ER05-6-000, *et al.* , 109 FERC ¶ 61,168 (2004). Applicants state that copies of the filing were served on parties on the official service lists in these proceedings. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 7. Virginia Electric and Power Company [Docket No. ER05-197-002] Take notice that on March 31, 2005, Virginia Electric and Power Company submitted a compliance filing, pursuant to the Commission's letter order issued March 4, 2005, in Docket Nos. ER05-197-000 and 001. Virginia Electric and Power Company states that copies of the filing have been served on CPV Warren, LLC and the Virginia State Corporation Commission. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 8. Pinelawn Power LLC [Docket No. ER05-305-003] Take notice that on March 31, 2005, Pinelawn Power LLC submitted an amendment to its March 16, 2005, filing in Docket No. ER05-305-002 submitted in compliance with the Commission's order issued February 15, 2005, in Docket Nos. ER05-305-000 and 001, 110 FERC ¶ 61,160 (2005). *Comment Date:* 5 p.m. eastern time on April 21, 2005. 9. Alabama Power Company [Docket No. ER05-398-001] Take notice that on March 30, 2005, Southern Company Services, Inc. (SCS), as agent for Alabama Power Company (Alabama Power) and Georgia Power Company (Georgia Power), submitted a response to the Commission's deficiency letter issued February 28, 2005, in Docket No. ER05-398-000. The response constitutes an amendment to SCS's December 30, 2004, filing of an executed transmission facilities agreement by and between Alabama Power and Georgia Power. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 10. Savannah Electric and Power Company [Docket No. ER05-399-001] Take notice that on March 30, 2005, Southern Company Services, Inc. (SCS), on behalf of Savannah Electric and Power Company (Savannah Electric) and Georgia Power Company (Georgia Power), submitted a response to the Commission's deficiency letter issued February 28, 2005, in Docket No. ER05-399-000. The response constitutes an amendment to SCS's December 30, 2004, filing of an executed transmission facilities agreement by and between Alabama Power and Georgia Power. SCS states that a copy of the filing was served on the Georgia Public Service Commission. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 11. California Independent System Operator Corporation [Docket No. ER05-405-001] Take notice that on March 30, 2005, the California Independent System Operator Corporation
(ISO)submitted a compliance filing pursuant to the Commission's order issued February 28, 2005, in Docket Nos. ER05-405-000 and ER05-407-000, 110 FERC ¶ 61,196 (2005). The ISO states that this filing has been served on all parties on the official service list in this proceeding. In addition, the ISO states that the filing has been posted on the ISO home page. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 12. California Independent System Operator Corporation [Docket No. ER05-407-001] Take notice that on March 30, 2005, the California Independent System Operator Corporation
(ISO)submitted a compliance filing pursuant to the Commission's order issued February 28, 2005, in Docket Nos. ER05-405-000 and ER05-407-000, 110 FERC ¶ 61,196 (2005). The ISO states that this filing has been served on all parties on the official service list in this proceeding. In addition, the ISO states that the filing has been posted on the ISO home page. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 13. Southern Company Services, Inc. [Docket No. ER05-413-002] Take notice that on March 30, 2005, Southern Company Services, Inc., acting as agent for Alabama Power Company, Georgia Power Company, Gulf Power Company, Mississippi Power Company and Savannah Electric and Power Company (collectively, Southern Companies) submitted a compliance filing, under protest, pursuant to the Commission's order issued February 28, 2005, in Docket No. ER05-413-000, 110 FERC ¶ 61,191 (2005). Southern Companies state that copies of the filing have been served on all parties on the official service list in this proceeding. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 14. Big Swamp Power Company LLC [Docket No. ER05-454-001] Take notice that on March 30, 2005, Bear Swamp Power Company LLC
(BSPC)submitted a compliance filing, pursuant to the Commission's order issued March 3, 2005, in Docket No. ER05-454-000, 110 FERC ¶ 61,208 (2005). BSPC states that copies of the filing have been served on all parties on the official service list in this proceeding. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 15. Bellows Falls Power Company, LLC [Docket No. ER05-455-001] Take notice that on March 30, 2005, Bellows Falls Power Company, LLC
(BFPC)submitted a compliance filing, pursuant to the Commission's order issued March 3, 2005, in Docket No. ER05-455-000, 110 FERC ¶ 61,221 (2005). BFPC states that copies of the filing have been served on all parties on the official service list in this proceeding. *Comment Date:* 5 p.m. eastern time on April 20, 2005. 16. Eastern Desert Power LLC [Docket No. ER05-534-001] Take notice that on March 31, 2005, Eastern Desert Power LLC submitted a compliance filing pursuant to the Commission's letter order issued March 23, 2005 in *Eastern Desert Power LLC* , 110 FERC ¶ 61,311 (2005). *Comment Date:* 5 p.m. eastern time on April 21, 2005. 17. PSI Energy, Inc., Northern Indiana Public Service Company [Docket No. ER05-538-001] Take notice that on March 31, 2005, PSI Energy, Inc.
(PSI)and Northern Indiana Public Service Company (NIPSCO) submitted NIPSCO's First Revised Rate Schedule No. 10 and PSI's First Revised Rate Schedule No. 227, reflecting changes to an Amended and Restated Facilities Agreement originally filed on February 2, 2005, in Docket No. ER05-538-000. PSI and NIPSCO state that copies of the filing were served on the Indiana Utility Regulatory Commission. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 18. American Electric Power Service Corporation [Docket No. ER05-751-000] Take notice that on March 31, 2005, American Electric Power Service Corporation (AEPSC), on behalf of Appalachian Power Company, Columbus Southern Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, and Wheeling Power Company (collectively, AEP), submitted for filing proposed electric transmission rates to be included in the Open Access Transmission Tariff of PJM. AEPSC requested an effective date of June 1, 2005. AEPSC states that copies of the filing were served on the Indiana Utility Regulatory Commission, Kentucky Public Service Commission, Michigan Public Service Commission, Public Utilities Commission of Ohio, Public Service Commission of West Virginia, Tennessee Regulatory Authority and Virginia State Corporation Commission. AEPSC also states that a copy of the transmittal letter was served on AEP's transmission customers and that the filings has been posed on its Web site at *http://www.aep.com/go/oat.* *Comment Date:* 5 p.m. eastern time on April 21, 2005. 19. Midwest Independent Transmission, System Operator, Inc., PJM Interconnection, L.L.C. [Docket No. ER05-752-000] Take notice that on March 31, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) and PJM Interconnection, L.L.C.
(PJM)submitted revisions to the Joint Operating Agreement
(JOA)between Midwest ISO and PJM. PJM and the Midwest ISO state that the filed sheets revise the Congestion Management Process
(CMP)in Attachment 2 to the JOA to:
(1)Clarify the term “market area” as used in CMP's market flow determination;
(2)change the treatment of capacity benefit margin
(CBM)in the CMP's calculation of firm allocation; and
(3)amend the freeze date used for purposes of calculating historic firm flow. The Midwest ISO and PJM request that the clarification concerning the “market area” become effective April 1, 2005, and that the changes concerning CBM and the freeze date become effective on August 1, 2005. The Midwest ISO and PJM state that the filing was served electronically on all PJM members and each state electric utility regulatory commission in the PJM region, and on all Midwest ISO members and other stakeholders. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 20. Oklahoma Gas and Electric Company [Docket No. ER05-753-000] Take notice that on March 31, 2005, Oklahoma Gas and Electric Company (OG&E) submitted five agreements with Oklahoma Municipal Power Authority and a certificate of concurrence. OG&E states that copies of the filing were served on Oklahoma Municipal Authority, the Arkansas Public Utility Commission and the Oklahoma Corporation Commission. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 21. ISO New England Inc., IRH Management Committee, New England Hydro-Transmission, Electric Company, Inc., New England Hydro-Transmission Corporation, New England Electric Transmission Corporation, Vermont Electric Transmission Company, Bangor Hydro-Electric Company, Central Maine Power Company, NSTAR Electric & Gas Corporation, on behalf of its affiliates Boston Edison Company, Commonwealth Electric Company, Cambridge Electric Light Company, and Canal Electric Company, New England Power Company, Northeast Utilities Service Company, on behalf of its operating company affiliates, The Connecticut Light and Power Company, Western Massachusetts Electric Company, Public Service Company of New Hampshire, and Holyoke Water Power Company, The United Illuminating Company, Vermont Electric Power Company, Central Vermont Public Service Corporation, Green Mountain Power Corporation, Vermont Electric Cooperative [Docket No. ER05-754-000] Take notice that on March 31, 2005, ISO New England Inc. (ISO-NE) and the companies listed in the caption (collectively, Filing Parties) tendered for filing a complete package of new contractual and tariff rate schedule arrangements for the United States portion of the 2000 MW (nominal) high-voltage direct-current transmission facilities interconnecting the transmission systems operated by ISO-NE and Hydro-Que bec TransE nergie (the “PhaseI/II HVDC-TF”), including proposed conforming changes to the ISO-NE FERC Electric Transmission, Markets and Services Tariff No. 3. The Filing Parties state that copies of the filing were sent to the New England state governors and regulatory commissions and all Participants and Indirect Participants. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 22. Oklahoma Gas and Electric Company [Docket No. ER05-755-000] Take notice that on March 31, 2005, Oklahoma Gas and Electric Company (OG&E) submitted an agreement for scheduling exchange service with Oklahoma Municipal Power Authority. OG&E states that copies of the filing were served on Oklahoma Municipal Authority, the Arkansas Public Utility Commission and the Oklahoma Corporation Commission. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 23. Dayton Power and Light Company [Docket No. ER05-756-000] Take notice that on March 31, 2005, Dayton Power and Light Company (DP&L) submitted a Notice of Cancellation of DP&L's FERC Electric Rate Schedule No. 48 with the City of Celina, Ohio. DP&L requested an effective date of May 31, 2005. DP&L states that the filing was served on the City of Celina, Ohio and the Public Utilities Commission of Ohio. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 24. Victoria International LTD [Docket No. ER05-757-000] Take notice that on March 31, 2005, Victoria International LTD.
(VIL)petitioned the Commission for acceptance of its Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at market-based rates; and the waiver of certain Commission regulations. VIL states that it intends to engage in wholesale electric power and energy purchases and sales as a marketer. VIL further states that it is not in the business of generating or transmitting electric power. VIL states that it is a Washington, DC corporation, which, through its affiliates, engages in wholesale natural gas marketing and energy transactions as a marketer. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 25. American Electric Power Service Corporation [Docket No. ER05-758-000] Take notice that on March 31, 2005, American Electric Power Service Corporation (AEPSC) tendered for filing an Interconnection and Local Delivery Service Agreement No. 1253 for Hoosier Energy Rural Electric Cooperative, Inc. and a Facilities, Operations, Maintenance and Repair Agreement No. 1254, for the establishment of a new Deliver Point between the City of Columbus, Ohio and AEP. AEPSC request an effective date of March 1, 2005, for Agreement No. 1253 and August 1, 2004, for Agreement No. 1254. AEPSC states that a copy of the filing was served on the parties and the Indiana and Ohio Public Service Commission. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 26. Wisconsin Electric Power Company [Docket No. ER05-759-000] Take notice that on March 31, 2005, Wisconsin Electric Power Company (Wisconsin Electric) tendered for filing an amended and restated Dynamic Interconnection Operations Coordination Agreement, designated as FERC Electric Rate Schedule No. 111, between Wisconsin Electric and the Board of Light and Power, City of Marquette. Wisconsin Electric requested an effective date of April 1, 2005. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 27. Wisconsin Electric Power Company [Docket No. ER05-760-000] Take notice that on March 31, 2005, Wisconsin Electric Power Company (Wisconsin Electric) tendered for filing Amendment No. 2 to the Joint Operating Agreement between Wisconsin Electric and Edison Sault Electric Company. Wisconsin Electric requested an effective date of April 1, 2005. *Comment Date:* 5 p.m. eastern time on April 21, 2005. 28. Oklahoma Gas and Electric Company [Docket No. ER05-761-000] Take notice that on March 31, 2005, Oklahoma Gas and Electric Company (OG&E) submitted a proposed revision to its Open Access Transmission Tariff
(OATT)to add a standard form of service agreement for customers to secure ancillary services under the OG&E OATT or to self-supply such services in conjunction with transmission service taken under the OATT of the Southwest Power Pool. OG&E states that copies of the filing were served on all customers under OG&E's OATT , the Oklahoma Corporation Commission, the Arkansas Public Service Commission and the Southwest Power Pool. *Comment Date:* 5 p.m. eastern time on April 21, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov* . Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E5-1755 Filed 4-13-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Notice April 6, 2005. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: April 13, 2005. 10 a.m. PLACE: Room 2C, 888 First Street NE., Washington DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. * **Note** —Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Magalie R. Salas, Secretary, Telephone
(202)502-8400. For a recorded listing of items stricken from or added to the meeting, call
(202)502-8627. This is a list of matters to be considered by the Commission. It does not include a listing of all papers relevant to the items on the agenda; however, all public documents may be examined in the Public Reference Room. 886th—Meeting; April 13, 2005; Regular Meeting; 10 a.m. Administrative Agenda A-1. Docket# AD02-1-000, Agency Administrative Matters A-2. Docket# AD02-7-000, Customer Matters, Reliability, Security and Market Operations A-3. M005-2-000, State of Market Presentations A-4. Long Term Transmission Rights in Organized Electricity Markets A-5. Report on Information Technology Guidelines for Power System Operations Organizations Markets, Tariffs, and Rates—Electric E-1. Omitted E-2. Omitted E-3. Omitted E-4. Docket# RM05-10-000, Imbalance Provisions for Intermittent Resources Docket# AD04-13-000, Assessing the State of Wind Energy in Wholesale Electricity Markets E-5. Docket# TX05-1-001, TX05-1-002, TX05-1-000, East Kentucky Power Cooperative, Inc. E-6. Docket# ER03-753-000, ER03-753-003, Entergy Services, Inc E-7. Docket# ER02-2458-002, Midwest Independent Transmission System Operator, Inc. E-8. Omitted E-9. Docket# EL00-95-000, *et al., San Diego Gas and Electric Company* v. *Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange* Docket# EL00-98-000, *et al.,* Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange Docket# ER01-889-000, ER01-3013-000, ER03-746-000, California Independent System Operator Corporation Docket# ER01-1455-000, Mirant California, LLC, Mirant Delta, LLC and Mirant Potrero, LLC Docket# EL02-60-000, *Public Utilities Commission of the State of California* v. *Sellers of Long Term Contracts to the California Department of Water Resources* Docket# EL02-62-000, *California Electricity Oversight Board* v. *Sellers of Energy and Capacity Under Long-Term Contracts with the California Department of Water Resources* Docket# EL03-158-000, Mirant Americas Energy Marketing, LP, Mirant California, LLC, Mirant Delta, LLC and Mirant Potrero, LLC Docket# EL03-180-000, Enron Power Marketing, Inc., and Enron Energy Services Inc., *et al.* Docket# ER98-495-000, ER98-1614-000, ER98-2145-000, ER99-3603-000, Pacific Gas and Electric Company Docket# ER03-215-000, ER04-227-000, ER05-343-000, Mirant Delta, LLC and Mirant Potrero, LLC Docket# ER07-4166-000, Southern Company Energy Marketing, Inc., and Southern Company Services, Inc. Docket# ER99-1841-000, Southern Energy California, L.L.C. Docket# ER99-1842-000, Southern Energy Delta, L.L.C. Docket# ER99-1833-000, Southern Energy Potrero, L.L.C. Docket# ER01-1265-000, Mirant Americas Energy Marketing, LP Docket# ER01-1267-000, Mirant California, LLC Docket# ER01-1270-000, Mirant Delta, LLC Docket# ER01-1278-000, Mirant Potrero, LLC Docket# EL02-71-000, State of California *ex rel.* Bill Lockyer, *Attorney General of the State of California* v. *British Columbia Power Exchange Corp., Coral Power, LLC, Dynegy Power Marketing, Inc., Enron Power Marketing, Inc., Mirant Americas Energy Marketing, Inc., Reliant Energy Services, Inc., Williams Energy Marketing & Trading Co.* Docket# EL01-10-000, *Puget Sound Energy, Inc.,* v. * All Jurisdictional Sellers of Energy and/or Capacity in the Pacific Northwest* Docket# PA02-2-000, Fact-Finding Investigation of Potential Manipulation of Electric and Natural Gas Prices Docket# PA03-8-000, Mirant Americas Energy Marketing, Inc. Docket# IN03-10-000, Investigation of Anomalous Bidding Behavior and Practices in the Western Markets E-10. Docket# ER05-572-000, Niagara Mohawk Power Corporation Docket# EL05-84-000, New York Independent System Operator, Inc. E-11. Docket# ER05-598-000, Dartmouth PPA Holdings LLC Docket# ER05-599-000, Dartmouth Power Associates L.P. E-12. Docket# ER05-595-000, California Independent System Operator Corporation E-13. Docket# ER05-597-000, Wayne-White Counties Electric Cooperative E-14. Omitted E-15. Docket# ER05-617-000, El Segundo Power, LLC E-16. Docket# ER05-416-000, ER05-416-001, ER05-416-002, ER05-416-003, California Independent System Operator Corporation E-17. Docket# ER02-600-003, Delta Energy Center, LLC E-18. Omitted E-19. Docket# ER05-613-000, Southern Company Services, Inc. E-20. Docket# ER05-581-000, ER05-581-001, Virginia Electric and Power Company E-21. Docket# ER01-174-002, ER05-655-000, Lighthouse Energy Trading Company, Inc. E-22. Docket# ER01-2636-002, ER01-2636-001, ALLETE, Inc., dba Minnesota Power Docket# ER00-2177-001, Rainy River Energy Corporation E-23. Docket# ER01-2262-005, Frederickson Power L.P. Docket# ER02-783-003, EPCOR Merchant and Capital
(US)Inc. Docket# ER02-852-003, EPCOR Power Development, Inc. Docket# ER02-855-003, EPDC, Inc. E-24. Docket# ER01-1403-002, FirstEnergy Operating Companies Docket# ER01-2968-003, ER01-2968-002, FirstEnergy Solutions Corporation Docket# ER01-845-002, ER01-845-001, FirstEnergy Generation Corporation Docket# ER04-366-002, Jersey Central Power & Light Company Docket# ER04-372-002, Metropolitan Edison Company and Pennsylvania Electric Company Docket# ER99-2330-001, ER99-2330-002, ER99-2330-004, FirstEnergy Corporation E-25. Omitted E-26. Docket# ER97-324-007, ER97-324-004, ER97-324-008, Detroit Edison Company. Docket# ER97-3834-010, ER97-3834-012, ER97-3834-013, ER97-3834-014, DTE Energy Trading, Inc. Docket# ER98-3026-007, ER98-3026-008, ER98-3026-009, DTE Edison America, Inc. Docket# ER99-3368-004, ER99-3368-003, ER99-3368-005, DTE Energy Marketing, Inc. Docket# ER00-1746-001, ER00-1746-002, ER00-1746-003, DTE Georgetown, L.P. Docket# ER00-1816-002, ER00-1816-003, ER00-1816-004, DTE River Rouge No. 1, L.L.C. Docket# ER02-963-002, ER02-963-004, ER02-963-005, Crete Energy Venture, L.L.C. E-27. Docket# ER01-1302-004, American Ref-Fuel Company of Niagara, L.P. E-28. Docket# ER00-2173-003, ER00-2173-002, ER00-2173-004, Northern Indiana Public Service Company Docket# ER00-3219-003, ER00-3219-002, ER00-3219-004, EnergyUSA—TPC Corporation Docket# ER01-1300-004, ER01-1300-003, ER01-1300-005, Whiting Clean Energy, Inc. E-29. Omitted E-30. Docket# ER04-1255-001, New England Power Pool and ISO New England Inc. E-31. Docket# ER04-539-005, ER04-539-006, ER04-539-007, EL04-121-001, EL04-121-002, EL04-121-000, PJM Interconnection, L.L.C. E-32. Omitted E-33. Docket# ER02-2595-006, ER02-2595-007, Midwest Independent Transmission System Operator, Inc. E-34. Docket# ER02-237-002, ER02-237-003, J. Aron & Company Docket# ER95-1739-022, Cogentrix Energy Power Marketing, Inc. Docket# ER03-1151-002, ER03-1151-003, Power Receivable Finance, LLC Docket# ER01-1819-003, ER01-1819-004, ER05-630-000, Cogentrix Lawrence County, LLC Docket# ER99-2984-004, Green Country Energy, LLC Docket# ER02-2026-002, Quachita Power, LLC Docket# ER99-3320-002, Rathdrum Power, LLC Docket# ER03-922-003, Southaven Power, LLC E-35. Docket# ER04-106-005, Midwest Independent Transmission System Operator, Inc. E-36. Docket# ER03-1079-002, ER03-1079-003, Aquila, Inc. Docket# ER02-47-003, Aquila Long Term, Inc. Docket# ER95-216-021, ER95-216-022, ER95-216-023, Aquila Merchant Services, Inc. Docket# ER03-725-003, Aquila Piatt County L.L.C. Docket# ER02-309-003, MEP Clarksdale Power, LLC Docket# ER02-1016-001, MEP Flora Power, LLC ER99-2322-001, ER99-2322-002, ER99-2322-003, MEP Investments, LLC Docket# ER01-905-001, ER01-905-002, ER01-905-003, MEP Pleasant Hill Operating, LLC Docket# ER00-1851-001, ER00-1851-002, ER00-1851-003, Pleasant Hill Marketing, LLC Docket# EL05-83-000 Aquila, Inc., Aquila Long Term, Inc., Aquila Merchant Services, Inc., Aquila Piatt County L.L.C., MEP Clarksdale Power, LLC, MEP Flora Power, LLC, MEP Investments, LLC, MEP Pleasant Hill Operating, LLC, and Pleasant Hill Marketing, LLC E-37. Docket# ER99-3693-002, ER99-3693-001, Midwest Generation, LLC Docket# ER99-666-003, ER99-666-002, EME Homer City Generation, L.P. Docket# ER99-852-007, ER99-852-006, Edison Mission Marketing & Trading, Inc. Docket# ER03-30-001, Midwest Generation Energy Services, LLC Docket# ER99-893-008, ER99-893-007, CP Power Sales Twelve, L.L.C. Docket# ER99-4229-006, ER99-4229-005, CP Power Sales Seventeen, L.L.C. Docket# ER99-4228-006, ER99-4228-005, CP Power Sales Nineteen, L.L.C Docket# ER99-4231-005, ER99-4231-004, CP Power Sales Twenty, L.L.C. E-38. Docket# ER98-1150-003, ER98-1150-002, EL05-87-000, Tucson Electric Power Company E-39. Docket# ER98-2184-007, AES Huntington Beach, LLC Docket# ER98-2185-007, AES Alamitos, LLC Docket# ER98-2186-007, AES Redondo Beach, LLC Docket# ER00-33-005, AES Placerita, Inc. Docket# ER00-1026-008, ER00-1026-006, ER00-1026-010, Indianapolis Power & Light Company Docket# ER02-305-004, Condon Wind Power, LLC Docket# ER01-2401-002, AES Red Oak, L.L.C. E-40. Docket# ER99-830-009, Merrill Lynch Capital Services, Inc. E-41. Docket# ER99-845-008 ER99-845-007, ER99-845-006, ER99-845-005, ER99-845-004, EL05-37-001, EL05-37-000, Puget Sound Energy, Inc. E-42. Docket# EC04-121-000, American Electric Power Services Corporation and AEP Texas Central Company E-43. Docket# TX04-4-000, PacifiCorp E-44. Docket# EF04-3031-000, United States Department of Energy—Southeastern Power Administration E-45. Omitted E-46. Docket# EL05-49-000, *Exelon Corporation* v. *PPL Electric Utilities Corporation and PJM Interconnection, L.L.C.* E-47. Docket# EL05-65-000, *ExxonMobil Chemical Company and ExxonMobil Refining & Supply Company* v. *Entergy Services, Inc., and Entergy Operating Companies* E-48. Docket# EL05-55-000, *City of Holland, Michigan* v. *Midwest Independent Transmission System Operator, Inc.* E-49. Docket# EL05-63-000, *DTE Energy Trading, Inc.* v. *Midwest Independent Transmission System Operator, Inc.* E-50. Docket# EL00-105-007, City of Vernon, California Docket# ER00-2019-007, California Independent System Operator Corporation E-51. Docket# ER04-810-000, Transalta Centralia Generating, L.L.C. E-52. Docket# ER05-123-000, Duke Energy Vermillion, LLC E-53. Docket# ER04-377-006, ER04-743-004, Pacific Gas and Electric Company E-54. Omitted E-55. Omitted E-56. Docket# ER99-230-007 Docket# ER03-762-007 Docket# EL05-5-001, Alliant Energy Corporate Services, Inc. E-57. Omitted E-58. Docket# RM00-7-011, Revision of Annual Charges to Public Utilities (Westar Energy, Inc., and Kansas Gas and Electric Company) E-59. Docket# ER05-167-001, California Power Exchange Corporation Docket# ER02-2234-011, California Power Exchange Corporation Docket# ER03-139-007, California Power Exchange Corporation Docket# ER03-791-004, California Power Exchange Corporation Docket# ER04-111-004, California Power Exchange Corporation Docket# ER04-785-003, California Power Exchange Corporation E-60. Docket# ER05-134-002 Docket# ER05-134-001, ISO New England Inc. E-61. Docket# ER96-1551-010 Docket# ER96-1551-011 Docket# ER96-1551-009 Docket# ER96-1551-008 Docket# ER96-1551-007 Docket# ER96-1551-006 Docket# ER01-615-003 Docket# ER01-615-004 Docket# ER01-615-005 Docket# ER01-615-006 Docket# ER01-615-007 Docket# ER01-615-008 Docket# EL05-2-001 Docket# EL05-2-002, Public Service Company of New Mexico E-62. Omitted E-63. Omitted E-64. Omitted E-65. Omitted E-66. Docket# EL05-20-002, Buckeye Power, Inc. E-67. Docket# EL04-135-002, Midwest Independent Transmission System Operator, Inc., PJM Interconnection, L.L.C., and All Transmission Owners Providing Access to Their Transmission Facilities under Midwest Independent Transmission System Operator, Inc. or PJM Interconnection, L.L.C. Tariffs and All Other Public Utility Transmission Owners in These Regions E-68. Docket# EL02-45-001, California Independent System Operator Corporation E-69. Docket# EC04-81-001, Ameren Corporation, Dynegy Inc., Illinova Corporation and Illinova Generating Company Docket# ER04-673-001, Dynegy Midwest Generation, Inc. and Dynegy Power Marketing, Inc. Docket# ER04-711-001, Dynegy Power Marketing, Inc. E-70. Docket# EC03-131-001, Docket# EC03-131-002, Oklahoma Gas and Electric Company and NRG McClain LLC E-71. Docket# EL00-66-003, *Louisiana Public Service Commission and the Council of the City of New Orleans* v. *Entergy Corporation* Docket# ER00-2854-004, Entergy Services, Inc. Docket# EL95-33-005, *Louisiana Public Service Commission* v. *Entergy Services Inc.* E-72. Docket# EL02-115-009, Avista Corporation, Avista Energy, Inc., Enron Power Marketing, Inc., and Portland General Electric Company E-73. Omitted E-74. Omitted E-75. Omitted Docket# E-76 ER04-691-001 Docket# # ER04-691-006 Docket# ER04-691-009 Docket# ER04-691-010 Docket# ER04-691-019 Docket# ER04-106-003 Docket# ER04-106-004 Docket# ER04-106-005, Midwest Independent Transmission System Operator, Inc. Docket# EL04-104-001 Docket# EL04-104-005 Docket# EL04-104-008 Docket# EL04-104-009 Docket# EL04-104-018, Public Utilities With Grandfathered Agreements in the Midwest ISO Region E-77. Docket# ER04-691-012 Docket# ER04-691-016 Docket# ER04-691-017, Midwest Independent Transmission System Operator, Inc. Docket# EL04-104-011 Docket# EL04-104-015 Docket# EL04-104-016, Public Utilities With Grandfathered Agreements in the Midwest ISO Region E-78. Docket# ER04-691-018 Docket# ER04-691-019, Midwest Independent Transmission System Operator, Inc. Docket# EL04-104-017 Docket# EL04-104-018, Public Utilities With Grandfathered Agreements in the Midwest ISO Region E-79. Omitted E-80. Omitted E-81. Docket# ER02-2595-005, Midwest Independent Transmission System Inc. E-82. Docket# ER04-1165-003, Midwest Independent Transmission System Operator, Inc. Docket# EL04-43-004, *Tenaska Power Services Company* v. *Midwest Independent Transmission System Operator, Inc.* Docket# EL04-46-004, *Cargill Power Markets, LLC* v. *Midwest Independent Transmission System Operator, Inc.* E-83. Docket# ER03-683-006, ER03-683-007, California Independent System Operator Corporation E-84. Omitted E-85. Docket# ER04-458-004, ER04-458-006, Midwest Independent Transmission System Operator, Inc. E-86. Docket# ER98-4400-008, ER98-4400-003, ER05-685-000, Pittsfield Generating Company E-87. Docket# ER97-2846-003, ER97-2846-004, Progress Energy, Inc. Docket# ER99-2311-005, Progress Energy Carolina Docket# ER03-1383-002, DeSoto County Generating Co. LLC Docket# ER01-2928-005, Progress Ventures Inc. Docket# ER01-1418-002, Effingham County Power, LLC Docket# ER02-1238-002, MPC Generating, LLC Docket# ER01-1419-002, Rowan County Power, LLC Docket# ER01-1310-003, Walton County Power, LLC Docket# ER03-398-003, Washington County Power, LLC E-88. Docket# PA04-10-000 Florida Power Corporation Docket# PA04-12-000, Carolina Power & Light Company Miscellaneous Agenda M-1. Docket# RM04-9-001, Electronic Notification of Commission Issuances Markets, Tariffs, and Rates—Gas G-1. Omitted G-2. Docket# PR05-3-000, Enogex, Inc. G-3. Docket# RP03-604-003, RP03-604-002, RP05-70-001, RP05-70-002, *LSP-Cottage Grove, L.P. and LSP-Whitewater Limited Partnership* v. *Northern Natural Gas Company* G-4. Docket# RP05-25-001, RP05-25-002, North Baja Pipeline, LLC G-5. Docket# RP04-51-001, RP04-51-002, Paiute Pipeline Company G-6. Omitted G-7. Docket# RP00-107-005, RP00-107-006, Williston Basin Interstate Pipeline Company G-8. Docket# RP03-64-003, RP03-64-004, Gulf South Pipeline Company, LP G-9. Docket# RP05-105-001, RP04-97-006, RP04-203-003, Equitrans, L.P. G-10. Docket# RP02-114-007, Tennessee Gas Pipeline Company G-11. Docket# TS05-1-000, Florida Power & Light Company Docket# TS04-207-001, Guardian Pipeline, Company Docket# TS04-257-001, Honeoye Storage Corporation Docket# TS04-209-001, MidWestern Gas Transmission Company Docket# TS04-62-000, NewCorp Resources Electric Cooperative, Inc. Docket# TS04-208-001, Northern Border Pipeline Company Docket# TS04-212-001, Viking Gas Transmission Company Docket# TS04-253-001, Texas Gas Transmission, L.L.C. Docket# TS04-249-001, Kinder Morgan Pipelines Docket# TS04-271-001, Kinder Morgan Pipelines Docket# TS04-272-001, Kinder Morgan Pipelines Docket# TS04-107-001, Algonquin Gas Transmission, L.L.C. Docket# TS04-242-002, Dauphin Island Gathering Partners Docket# TS04-106-001, East Tennessee Natural Gas, L.L.C. Docket# TS04-05-001, Egan Hub Storage, L.L.C. Docket# TS04-161-001, Gulfstream Natural Gas System, L.L.C. Docket# TS04-159-001, Maritimes & Northeast Pipeline, L.L.C. Docket# TS04-259-001, Missouri Interstate Gas, LLC Docket# TS04-154-001, Texas Eastern Transmission, L.P. Docket# TS04-279-000, Union Gas Limited G-12. Docket# IS05-117-000, Enterprise Lou-Tex Propylene Pipeline L.P. G-13. Docket# RP04-276-000, Southern Star Central Gas Pipeline, Inc. G-14. Omitted G-15. Docket# RP02-335-003, RP02-335-004, ANR Pipeline Company Energy Projects—Hydro H-1. Docket# P-10371-008, CPS Products, Inc. H-2. Omitted H-3. Docket# P-2232-479, Duke Energy Corporation H-4. Docket# P-2004-075, Holyoke Gas and Electric Department Docket# P-11607-002, Holyoke Gas and Electric Department, Ashburnham Municipal Light Plant, and Massachusetts Municipal Wholesale Electric Company H-5. Docket# P-12454-002, Energie Group LLC H-6. Docket# P-12178-001, Verdant Power, LLC H-7. Docket# P-2177-056, Georgia Power Company H-8. Docket# P-2612-019, FPL Energy Maine Hydro, LLC H-9. Docket# P-10482-065, Mirant NY-GEN LLC. Energy Projects—Certificates C-1. Docket# CP05-8-000, CP05-9-000, CP05-10-000, Starks Gas Storage LLC. C-2. Docket# CP01-368-004, Transcontinental Gas Pipe Line Corporation Docket# CP01-369-002, Williams Gas Processing—Gulf Coast Company, LP. C-3. Docket# CP05-37-000, Transcontinental Gas Pipe Line Corporation C-4. Docket# CP05-29-000, CP05-30-000, CP05-31-000, Freebird Gas Storage, LLC C-5. Docket# CP05-15-000, CP05-16-000, CP05-17-000, Caledonia Energy Partners, L.L.C. C-6. Docket# CP02-378-002, Cameron LNG, LLC C-7. Docket# CP04-37-000, Corpus Christi LNG, L.P. Docket# CP04-44-000, CP04-45-000, CP04-46-000, Cheniere Corpus Christi Pipeline Company C-8. Docket# CP04-76-001, Equitrans, L.P. C-9. Docket# CP04-396-001, Transcontinental Gas Pipe Line Corporation C-10. Docket# CP04-121-001, El Paso Natural Gas Company C-11. Docket# CP04-60-001, Tennessee Gas Pipeline Company The Capitol Connection offers the opportunity for remote listening and viewing of the meeting. It is available for a fee, live over the Internet, via C-Band Satellite. Persons interested in receiving the broadcast, or who need information on making arrangements should contact David Reininger or Julia Morelli at the Capitol Connection (703-993-3100) as soon as possible or visit the Capitol Connection Web site at *http://www.capitolconnection.gmu.edu and click on “FERC”* Immediately following the conclusion of the Commission Meeting, a press briefing will be held in Hearing Room 2. Members of the public may view this briefing in the Commission Meeting overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. Magalie R. Salas, Secretary. [FR Doc. 05-7554 Filed 4-12-05; 11:15 am]
Connectionstraces to 4
3 references not yet in our index
  • 15 USC 79z-5a
  • 18 CFR 365
  • Pub. L. 94-409
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cite15 USC 79z-5a
Cite18 CFR 365
Pub. L.Pub. L. 94-409
Cites 7Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.