Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2004-10-18 · DEPARTMENT OF ENERGY · Notices

Notices. Notice of meetings

18,687 words·~85 min read·/register/2004/10/18/04-23262·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP04-468-001] Algonquin Gas Transmission, LLC; Notice of Compliance Filing October 7, 2004. Take notice that on October 1, 2004, Algonquin Gas Transmission, LLC (Algonquin) submitted a compliance filing pursuant to the Commission's Order in *Algonquin Gas Transmission,* LLC, 108 FERC ¶61,275 (2004), issued on September 21, 2004, in Docket No. RP04-468-000. Algonquin states that copies of the filing were served upon all affected customers of Algonquin and interested state commissions, as well as upon all parties on the Commission's official service list in this proceeding.
Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding.
The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC.
There is an “eSubscription” link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2677 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PL04-15-000, RM02-12-000, RM02-1-001, RM02-1-005] Interconnection for Wind Energy and Other Alternative Technologies; Standardization of Small Generator Interconnection Agreements and Procedures; Standardizing Generator Interconnection Agreements and Procedures; Notice Regarding Post-Technical Conference Comments October 7, 2004. On September 24, 2004, the Commission held a technical conference in the above-referenced dockets regarding the issues raised by a petition for rulemaking submitted by the American Wind Energy Association
(AWEA)related to the adoption of certain requirements for the interconnection of large wind generators. Specifically, the conference focused on the interconnection of wind energy and other alternative technologies, and considered the technical requirements for the interconnection of large and small wind generators and other alternative technologies, and the need for creating specific requirements for their interconnection to the grid. A transcript of the technical conference will be available in the near future from the Commission's Web site, *http://www.ferc.gov.* At the technical conference, Staff stated that the Commission would allow interested parties to file post-technical conference comments. These comments must be filed with the Commission no later than 5 p.m. Eastern Standard Time
(EST)on November 1, 2004. Magalie R. Salas, Secretary. [FR Doc. E4-2669 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP00-305-018] CenterPoint Energy—Mississippi River Transmission Corporation; Notice of Negotiated Rate October 7, 2004. Take notice that on September 30, 2004, CenterPoint Energy—Mississippi River Transmission Corporation
(MRT)tendered for filing and approval a negotiated rate agreement between MRT and Trigen-St. Louis Energy Corporation. MRT states that it has entered into an agreement to provide service to this customer to be effective October 1, 2004. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, D.C. There is an “eSubscription” link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2672 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests October 7, 2004. Take notice that the following application has been filed with the Commission and is available for public inspection: a. *Application Type:* Non-Project Use Of Project Lands And Waters. b. *Project No:* 2232-477. c. *Date Filed:* September 14, 2004.. d. *Applicant:* Duke Power, a division of Duke Energy Corporation. e. *Name of Project:* Catawba-Wateree Project. f. *Location:* This project is located on the Catawba and Wateree Rivers, in nine counties in North Carolina (Burke, Alexander, McDowell, Iredell, Caldwell, Lincoln, Catawaba, Gaston, and Mecklenburg Counties) and five counties in South Carolina (York, Chester, Lancaster, Fairfield and Kershaw Counties). This project does not occupy any Tribal or federal lands. g. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791(a) 825(r) and §§ 799 and 801. h. *Applicant Contact:* Mr. Joe Hall, Lake Management Representative; Duke Energy Corporation; P.O. Box 1006; Charlotte, NC; 28201-1006; 704-382-8576. i. *FERC Contact:* Any questions on this notice should be addressed to Brian Romanek at
(202)502-6175 or by e-mail: Brian.Romanek@ferc.gov. j. *Deadline for filing comments and or motions:* November 8, 2004. All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. Please include the project number (P-2232-477) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. *See,* 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. The Commission strongly encourages e-filings. k. *Description of Request:* Duke Power, licensee for the Catawba-Wateree Hydroelectric Project, has requested Commission authorization to allow R & N Marina, Inc. (R & N) to modify and expand the existing R&N Commercial/Residential marina facility on Lake Hickory, North Carolina. R & N proposes to construct two cluster docks that accommodate forty-six boats. R & N also proposes to add 6 jet boats slips to the end of an existing docking facility. The lease area for the marina would increase from 1.67 acres to 2.96 acres. Duke Power also requests re-classification of 157 feet of project shoreline at the marina location. The area should have been classified in its approved Shoreline Management Plan for commercial/ residential use as opposed to residential. l. *Location of the Application:* This filing is available for review at the Commission or may be viewed on the Commission's Web site at *http://www.ferc.gov* , using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at
(866)208-3676, or for TTY, contact
(202)502-8659. m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “RECOMMENDATIONS FOR TERMS AND CONDITIONS”, “PROTEST”, OR “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described applications. A copy of the applications may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. Magalie R. Salas, Secretary. [FR Doc. E4-2666 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP04-471-001] East Tennessee Natural Gas, LLC; Notice of Compliance Filing October 7, 2004. Take notice that on October 1, 2004, East Tennessee Natural Gas, LLC (East Tennessee) submitted a compliance filing pursuant to the Commission's Order in *East Tennessee Natural Gas, LLC,* 108 FERC ¶61,271 (2004), issued on September 21, 2004, in Docket No. RP04-471-000. East Tennessee states that copies of the filing were served upon all affected customers of East Tennessee and interested state commissions, as well as upon all parties on the Commission's official service list in this proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2678 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP04-475-001] Egan Hub Storage, LLC; Notice of Compliance Filing October 7, 2004. Take notice that on October 1, 2004, Egan Hub Storage, LLC (Egan Hub) tendered for filing a compliance filing pursuant to Egan Hub Storage, LLC, 108 FERC ¶61,263 (2004), issued on September 21, 2004, in Docket No. RP04-475-000. Egan Hub states that copies of the filing were served upon all affected customers of Egan Hub and interested state commissions, as well as upon all parties on the Commission's official service list in this proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2679 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP04-423-000] El Paso Natural Gas Company; Notice of Application October 8, 2004. Take notice that El Paso Natural Gas Company (El Paso), Post Office Box 1087, Colorado Springs, Colorado 80944, filed in Docket No. CP04-423-000 on September 29, 2004, an application pursuant to section 7(b) of the Natural Gas Act
(NGA)and the Commission's Regulations, for authorization to abandon in place and by removal, certain pipeline facilities, with appurtenances, located in Eddy County, New Mexico, and Culberson and Hudspeth Counties, Texas, that are no longer required in the operation of El Paso's interstate transmission system. Specifically, El Paso proposes to abandon approximately 87.7 miles of its Jal-El Paso “A” Line and 79.1 miles of its Jal-El Paso “B” Line (referred to as Line Nos. 1000 and 1001), all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may be also viewed on the Web at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call
(202)502-8659 or TTY,
(202)208-3676. Any questions regarding this application should be directed to Robert T. Tomlinson, Director, Regulatory Affairs, El Paso Natural Gas Company, PO Box 1087, Colorado Springs, Colorado 80944, at
(719)520-3788 or fax
(719)520-4318. There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. Unless filing electronically, a party must submit 14 copies of any paper filing made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. *See* , 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. *Comment Date:* October 29, 2004. Magalie R. Salas, Secretary. [FR Doc. E4-2684 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP04-423-000] El Paso Natural Gas Company; Notice of Application October 8, 2004. Take notice that El Paso Natural Gas Company (El Paso), Post Office Box 1087, Colorado Springs, Colorado 80944, filed in Docket No. CP04-423-000 on September 29, 2004, an application pursuant to section 7(b) of the Natural Gas Act
(NGA)and the Commission's Regulations, for authorization to abandon in place and by removal, certain pipeline facilities, with appurtenances, located in Eddy County, New Mexico, and Culberson and Hudspeth Counties, Texas, that are no longer required in the operation of El Paso's interstate transmission system. Specifically, El Paso proposes to abandon approximately 87.7 miles of its Jal-El Paso “A” Line and 79.1 miles of its Jal-El Paso “B” Line (referred to as Line Nos. 1000 and 1001), all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may be also viewed on the Web at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call
(202)502-8659 or TTY,
(202)208-3676. Any questions regarding this application should be directed to Robert T. Tomlinson, Director, Regulatory Affairs, El Paso Natural Gas Company, P.O. Box 1087, Colorado Springs, Colorado 80944, at
(719)520-3788 or fax
(719)520-4318. There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. Unless filing electronically, a party must submit 14 copies of any paper filing made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. *See,* 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. *Comment Date:* October 29, 2004. Magalie R. Salas, Secretary. [FR Doc. E4-2688 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP00-157-014] Kern River Gas Transmission Company; Notice of Negotiated Rate October 7, 2004. Take notice that on October 1, 2004, Kern River Gas Transmission Company (Kern River) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, Eighth Revised Sheet No. 495, to be effective November 1, 2004. Kern River states that the purpose of this filing is to notify the Commission and other interested parties of a redetermination of certain charges under and in accordance with the negotiated rate transportation service agreement dated June 5, 2003, between Kern River and High Desert Power Trust
(HDPT)and to update Kern River's tariff to reflect the redetermined charges. Kern River states that it has served a copy of this filing upon its customers and interested state regulatory commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov* , using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov* , or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2671 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP04-274-003] Kern River Gas Transmission Company; Notice of Motion To Place Suspended Rates and Tariff Sheets Into Effect October 7, 2004. Take notice that on October 1, 2004, Kern River Gas Transmission Company (Kern River) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the tariff sheets listed in Appendix A to the filing. Kern River states that the purpose of this filing is:
(1)to comply with the Commission's May 28, 2004 “Order Accepting and Suspending Tariff Sheets Subject to Refund, and Establishing Hearing Procedures” by revising the rates and the Park and Loan revenue sharing provisions proposed in Kern River's April 30, 2004 general rate filing; and
(2)to move to place the revised rates into effect. Kern River states that it has served a copy of this filing upon each person designated on the official service list compiled by the Secretary in this proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2675 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP04-274-004] Kern River Gas Transmission Company; Notice of Tariff Filing October 7, 2004. Take notice that on October 4, 2004, Kern River Gas Transmission Company (Kern River) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following tariff sheets, to be effective November 1, 2004: Substitute Seventh Revised Sheet No. 71 Substitute Fourth Revised Sheet No. 76 Substitute First Revised Sheet No. 110-A.1 Kern River states that the purpose of this filing isto supplement Kern River's October 1, 2004 filing in this proceeding by submitting three tariff sheets that were inadvertently omitted. These sheets were originally submitted on April 30, 2004 and accepted to be effective November 1, 2004, however, minor ministerial changes were made to these sheets after the April 30 filing was submitted, so Kern River is submitting substitute sheets to reflect the changes that have occurred between April and November. Kern River states that it has served a copy of this filing upon its customers and interested state regulatory commissions. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2676 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP04-476-001] Maritimes & Northeast Pipeline, L.L.C.; Notice of Compliance Filing October 7, 2004. Take notice that on October 1, 2004, Maritimes & Northeast Pipeline, L.L.C. (Maritimes) tendered for filing a compliance filing pursuant to Maritimes & Northeast Pipeline, L.L.C., 108 FERC ¶61,264 (2004), issued on September 21, 2004, in Docket No. RP04-476-000. Maritimes states that copies of the filing were served upon all affected customers of Maritimes and interested state commissions, as well as upon all parties on the Commission's official service list in this proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov* . Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov* , using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov* , or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2664 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP04-424-000] Petal Gas Storage, L.L.C.; Notice of Application October 7, 2004. Take notice that on September 30, 2004, Petal Gas Storage, L.L.C. (Petal), Four Greenway Plaza, Houston, Texas 77046, filed an application in Docket No. CP04-424-000 pursuant to section 7(c) of the Natural Gas Act, requesting that the Commission issue an Order authorizing Petal to increase the capacity of its mainline pipeline, Line 100, without increasing its maximum allowable operating pressure and to uprate its Heidelberg Compressor Station to 9442 hp in order to increase the withdrawal and delivery capacity of downstream interconnects, from 700 MMcf/day to 1.3 Bcf/day, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call
(202)502-3676, or TTY,
(202)502-8659. Any questions concerning this application may be directed to Richard W. Porter, Four Greenway Plaza, Houston, Texas 77046,
(832)676-3081 (phone),
(832)676-8811 (fax). There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. Unless filing electronically, a party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. Persons who wish to comment only on the environmental review of this project, or in support of or in opposition to this project, should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the applicant. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order. The Commission may issue a preliminary determination on non-environmental issues prior to the completion of its review of the environmental aspects of the project. This preliminary determination typically considers such issues as the need for the project and its economic effect on existing customers of the applicant, on other pipelines in the area, and on landowners and communities. For example, the Commission considers the extent to which the applicant may need to exercise eminent domain to obtain rights-of-way for the proposed project and balances that against the non-environmental benefits to be provided by the project. Therefore, if a person has comments on community and landowner impacts from this proposal, it is important either to file comments or to intervene as early in the process as possible. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site ( *http://www.ferc.gov)* under the “e-Filing” link. *Comment Date:* October 29, 2004. Magalie R. Salas, Secretary. [FR Doc. E4-2665 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP03-437-002] WestGas InterState, Inc.; Notice of Compliance Filing October 7, 2004. Take notice that on October 1, 2004, WestGas InterState, Inc.
(WGI)tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1, Second Substitute Sixth Revised Sheet No. 92, with a proposed effective date of July 1, 2003. WGI asserts that the purpose of this filing is to comply with the Letter Order issued in Docket No. RP03-437-001 on August 25, 2004. WGI states that the above tariff sheet has been revised to restore the headings ( *i.e.* , Version 1.6, Recommendation R02002 and Recommendation R02002-2) that had been previously deleted and lists the associated standards under their respective headings. WGI further states that copies of this filing have been mailed to WGI's jurisdictional customers and interested state commissions. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, D.C. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2674 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP03-323-004] Williston Basin Interstate Pipeline Company; Notice of Filing October 7, 2004. Take notice that on September 30, 2004, Williston Basin Interstate Pipeline Company (Williston Basin or Company), tendered for filing with the Commission a negotiated Rate Schedule FT-1 service agreement. Williston Basin states that the proposed effective date of the service agreement is October 1, 2004. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission's Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2673 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EC05-2-000, et al.] American Electric Power Service Corporation, et al.; Electric Rate and Corporate Filings October 8, 2004. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. American Electric Power Service Corporation [Docket No. EC05-2-000] Take notice that on October 7, 2004, American Electric Power Service Corporation,
(AEP)on behalf of its electric utility subsidiary, AEP Texas Central Company, formerly known as Central Power and Light Company (TCC), submitted an application pursuant to section 203 of the Federal Power Act for authorization of a disposition of jurisdictional facilities whereby TCC seeks authorization to transfer certain jurisdictional facilities associated with TCC's 25.2 percent undivided ownership interest in the 2,500 MW South Texas Project nuclear plant (TCC Interest). AEP states that TCC proposes to sell 13.2 percent of the TCC Interest to Texas Genco, L.P. and 12 percent of the TCC Interest to City of San Antonio acting by and through the City Public Service Board of San Antonio. *Comment Date:* 5 p.m. Eastern Time on October 28, 2004. 2. Sheboygan Power, LLC [Docket No. EG05-3-000] Take notice that on October 6, 2004, Sheboygan Power, LLC (Sheboygan Power) filed an application for a determination that it is an exempt wholesale generator. Sheboygan Power states that it will construct and own a natural gas-fired generating facility, located in the County of Sheboygan, Wisconsin, consisting of three gas fired turbine generators to provide approximately 450 MW net electrical output, with only two turbine generators to be placed in service initially, and to provide approximately 300 MW net electrical output. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 3. Cargill-Alliant, LLC [Docket No. ER97-4273-013] Take notice that on October 6, 2004, Cargill-Alliance, LLC (Cargill-Alliant) Incorporated, submitted a compliance filing pursuant to the Commission's Letter Order issued August 17, 2004 in Docket No. ER97-4273-012. *Comment Date:* 5 p.m. Eastern Time on October 27, 2004. 4. AES Huntington Beach, L.L.C. [Docket No. ER98-2184-007] Take notice that on October 5, 2004, AES Huntington Beach, L.L.C. (AES Huntington Beach) submitted for filing its triennial market power update in compliance with *Acadia Power Partners, LLC, et al.* , 107 FERC ¶ 61,168 (2004). As part of this triennial market power update, AES Huntington Beach also submitted for filing amendments to its market-based rate tariff implementing six
(6)new market behavior rules adopted by the Commission in *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorization* , 105 FERC 61,218 (2003). AES Huntington Beach also submitted for approval its second revision to FERC Electric Tariff, Original Volume No. 1, and its first revision to its Statement of Policy and Code of Conduct. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 5. AES Alamitos, L.L.C. [Docket No. ER98-2185-007] Take notice that on October 5, 2004, AES Alamitos (AES Alamitos) submitted for filing its triennial market power update in compliance with *Acadia Power Partners, LLC, et al.* , 107 FERC ¶ 61,168 (2004). As part of this triennial market power update, AES Alamitos also submitted for filing amendments to its market-based rate tariff implementing six
(6)new market behavior rules adopted by the Commission in *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorization* , 105 FERC 61,218 (2003). AES Alamitos also submitted for approval its second revision to FERC Electric Tariff, Original Volume No. 1, and its first revision to its Statement of Policy and Code of Conduct. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 6. AES Redondo Beach, L.L.C. [Docket No. ER98-2186-007] Take notice that on October 5, 2004, AES Redondo Beach, L.L.C. (AES Redondo Beach) submitted for filing its triennial market power update in compliance with *Acadia Power Partners, LLC, et al.* , 107 FERC ¶ 61,168 (2004). As part of this triennial market power update, AES Redondo Beach also submitted for filing amendments to its market-based rate tariff implementing six
(6)new market behavior rules adopted by the Commission in an order issued November 17, 2003, in Docket No. EL01-118-000, *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorization* , 105 FERC 61,218 (2003). AES Redondo Beach also submitted for approval its second revision to FERC Electric Tariff, Original Volume No. 1, and its first revision to its Statement of Policy and Code of Conduct. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 7. GWF Energy LLC [Docket No. ER01-2233-003] Take notice that, on October 4, 2004, GWF Energy LLC
(GWF)amended its compliance filing submitted on July 19, 2004, pursuant to the Commission's letter order issued July 18, 2004 in *GWF Energy LLC* , Docket No. ER01-2233-000 and pursuant to *Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorizations* , 105 FERC ¶ 61,218 (2003). GWF states that the amendment to the compliance filing consists of a market share and pivotal supplier analysis in support of its updated market power analysis and updated tariff sheets. GWF states that copies of the filing were served on parties on the official service list in the above-captioned proceeding. *Comment Date:* 5 p.m. Eastern Time on October 25, 2004. 8. PJM Interconnection, L.L.C. [Docket No. ER03-262-000] Take notice that on October 4, 2004, PJM Interconnection, L.L.C.
(PJM)submitted its compliance with the Commission's August 4, 2004 order in Docket No. ER02-262-002, *et al.* , 108 FERC ¶ 61,140, concerning the collection of Commission annual charges billed to PJM associated with loads in the Commonwealth Edison Company and American Electric Power East Operating Companies transmission zones. PJM states that copies of the filing were served on all persons on the Commission's official service list for this proceeding. *Comment Date:* 5 p.m. Eastern Time on October 25, 2004. 9. New York Independent System Operator, Inc. [Docket No. ER04-449-004] Take notice that on October 5, 2004, the New York Independent System Operator, Inc. (NYISO) and the New York Transmission Owners filed a joint Compliance Filing in connection with the Commission's August 6, 2004 Order in Docket No. ER04-449-000, *et al.* NYISO states that it has served a copy of this filing on all parties in Docket No. ER04-449-000. The NYISO requests a waiver of the requirements of 18 CFR 385.2010 so as to permit it to electronically serve a copy of this filing on the official representatives of each of its customers, on each participant in its stakeholder committees, on the New York State Public Service Commission and on the electric utility regulatory agencies in New Jersey and Pennsylvania. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 10. Midwest Independent Transmission System Operator, Inc. [Docket No. ER04-691-007 and EL04-104-000] Take notice that on October 5, 2004, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) submitted a compliance filing pursuant to the Commission's Order issued August 6, 2004, *Midwest Independent Transmission System Operator, Inc.* , 108 FERC ¶ 61,163 (2004). Midwest ISO has also requested a waiver of the service requirements set forth in 18 CFR 385.2010. The Midwest ISO has electronically served a copy of this filing, with its attachments, upon all Midwest ISO Members, Member representatives of Transmission Owners and Non-Transmission Owners, the Midwest ISO Advisory Committee participants, Policy Subcommittee participants, as well as all state commissions within the region. In addition, the filing has been electronically posted on the Midwest ISO's Web site at *http://www.midwestiso.org* under the heading “Filings to FERC” for other interested parties in this matter. The Midwest ISO will provide hard copies to any interested party upon request. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 11. Vermont Electric Cooperative, Inc. [Docket No. ER04-694-003] Take notice that on October 6, 2004, Vermont Electric Cooperative, Inc.
(VEC)submitted its refund compliance report pursuant to the Commission's September 7, 2004 Order Accepting Market-Based Tariff in the Docket No. ER04-694-000, *et al.* , *Vermont Electric Cooperative, Inc.* , 108 FERC ¶ 61,223 (2004). *Comment Date:* 5 p.m. Eastern Time on October 27, 2004. 12. The Detroit Edison Company, DTE East China, LLC, DTE River Rouge No. 1 LLC [Docket No. ER04-948-002] Take notice that on October 4, 2004, DTE East China, LLC, DTE River Rouge No. 1, LLC and the Detroit Edison Company (Applicants) submitted a compliance filing pursuant to a Commission order issued on July 16, 2004 in Docket No. ER04-948-000. Applicants state that copy of the filing was served on parties on the official service list in the above-captioned proceeding. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 13. PJM Interconnection, L.L.C. [Docket No. ER04-1123-001] Take notice that on October 5, 2004, PJM Interconnection, L.L.C. (PJM), amended its August 12, 2004 filing in Docket No. ER04-123-000 by submitting an amended executed interim interconnection service agreement among PJM, Wind Park Bear Creek, L.L.C., and PPL Electric Utilities Corporation (Wind Park ISA) and to identify differences between the Wind Park ISA and the form of interim interconnection service agreement in Attachment O-1 and form of interconnection service agreement in Attachment O of the PJM Open Access Transmission Tariff as modified by tariff revisions accepted by the Commission in *PJM Interconnection, L.L.C.* , 108 FERC ¶ 61,025 (2004). PJM states that copies of this filing were served upon the parties to the agreement and the state regulatory commissions within the PJM region, and all parties on the official service list compiled by the Secretary in this proceeding. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 14. Consolidated Edison Energy, Inc. [Docket No. ER04-1196-001] Take notice that on October 1, 2004, Consolidated Edison Energy, Inc. (CEE), filed an amendment to its filing submitted on August 18, 2004 in Docket No. ER04-1196-000. First Revised Sheet No. 1 of CEE's Market-Based Rate Tariff, First Revised Volume No. 1, superceding Original Volume No. 1, as well as the red-lined version of that Tariff Sheet. *Comment Date:* 5 p.m. Eastern Time on October 22, 2004. 15. Boston Edison Company [Docket No. ER05-15-000] Take notice that on October 4, 2004, Boston Edison Company (Boston Edison) tendered for filing First Revised Rate Schedule FERC No. 179 (First Revised Rate Schedule) between Boston Edison and the Town of Braintree Electric Light Department (Braintree). Boston Edison requests an effective date of March 1, 2003. Boston Edison states that copies of the filing were served upon Braintree and the Department of Telecommunications and Energy for the Commonwealth of Massachusetts. *Comment Date:* 5 p.m. Eastern Time on October 25, 2004. 16. American Transmission Systems, Incorporated [Docket No. ER05-16-000] Take notice that on October 4, 2004, American Transmission Systems, Incorporated
(ATSI)tendered for filing a proposed Schedule 2.1—Revenue Requirement for Reactive Power. ATSI stated that Schedule 2.1, which allows collection of revenues associated with the supply of Reactive Supply Service within the FirstEnergy Control Area by multiple generation suppliers and the distribution of all revenues collected in a fair and equitable manner, is being modified to accommodate a new revenue requirement for the supply of Reactive Supply Service by FirstEnergy Solutions Corp. ATSI requests an effective date of October 15, 2004. *Comment Date:* 5 p.m. Eastern Time on October 25, 2004. 17. Trans-Elect NTD Path 15, LLC [Docket No. ER05-17-000] Take notice that on October 4, 2004, Trans-Elect NTD Path 15 LLC (NTD Path 15) submits for filing the materials necessary under FPA section 205 to establish its transmission revenue requirement. In addition, NTD Path 15 submits its FERC TO Tariff as a participating transmission owner in California Independent System Operator Corporation. NTD Path 15 requests an effective date of December 4, 2004. NTD Path 15 states that copies of this filing were served on all interested parties. *Comment Date:* 5 p.m. Eastern Time on October 25, 2004. 18. Appalachian Power Company [Docket No. ER05-19-000] Take notice that on October 5, 2004, Appalachian Power Company
(APCo)tendered for filing with the Commission thirteen Notices of Cancellation, designated as indicated below, that cancel the Electric Service Agreements/Rate Schedules under which APCo currently provides service to the following wholesale customers: Notice of Cancellation Customer Rate schedule designation Black Diamond Power Company (Elkhurst) First Revised Rate Schedule—FERC No. 103 Black Diamond Power Company (East Hartland) First Revised Rate Schedule—FERC No. 104 Black Diamond Power Company (Sophia) First Revised Rate Schedule—FERC No. 105 Elk Power Company
(Clay)First Revised Rate Schedule—FERC No. 106 Elkhorn Public Service Company (Elkhorn) First Revised Rate Schedule—FERC No. 107 Elkhorn Public Service Company (Crozier #4) First Revised Rate Schedule—FERC No. 108 Kimball Light & Water Company First Revised Rate Schedule—FERC No. 109 United Light & Power Company First Revised Rate Schedule—FERC No. 110 Union Power Company (Rhodell) First Revised Rate Schedule—FERC No. 111 Union Power Company (Mullens and Pierpont) First Revised Rate Schedule—FERC No. 112 War Light & Power Company First Revised Rate Schedule—FERC No. 113 Elk Power Company (Reed's Fork) First Revised Rate Schedule—FERC No. 114 APCo requests that the Notices of Cancellation be made effective December 1, 2004. APCo states that a copy of its filing was served upon the Public Service Commission of West Virginia and the customers set out above. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 19. Florida Power & Light Company [Docket No. ER05-21-000] Take notice that on October 5, 2004, Florida Power & Light Company
(FPL)submitted Amendment No. 3 to the St. Lucie Nuclear Reliability Exchange Agreement between Florida Power & Light Company and Florida Municipal Power Agency. FPL states that the revisions set forth in Amendment No. 3 to the St. Lucie Nuclear Reliability Exchange Agreement between Florida Power & Light Company and Florida Municipal Power Agency reflect the clarification of the treatment of costs associated with pension benefits and post-retirement benefits other than pensions for the period 2003 and beyond. FPL states that copies of the filing were served upon Florida Municipal Power Agency. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 20. Florida Power & Light Company [Docket No. ER05-22-000] Take notice that on October 5, 2004, Florida Power & Light Company
(FPL)submitted Amendment No. 2 to the St. Lucie Nuclear Reliability Exchange Agreement between Florida Power & Light Company and Orlando Utilities Commission. FPL states that the revisions set forth in Amendment No. 2 to the St. Lucie Nuclear Reliability Exchange Agreement between Florida Power & Light Company and Orlando Utilities Commission reflect the clarification of the treatment of costs associated with pension benefits and post-retirement benefits other than pensions for the period 2003 and beyond. FPL states that the copies of the filing were served upon Orlando Utilities Commission. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 21. AES Placerita, Inc. [Docket No. ER05-23-000 and ER00-33-005] Take notice that on October 5, 2004, AES Placerita, Inc. (Placerita) submitted its triennial market power update pursuant to the Commission's Order in Docket No. ER0033-000 and *Acadia Power Partners, LLC, et al.* , 107 FERC ¶ 61,168 (2004). In addition, pursuant to section 205 of the Federal Power Act, Placerita submitted its third revision to FERC Electric Rate Schedule, Original Volume No. 1, and its second revision to its code of conduct reflecting new corporate affiliations. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 22. Virginia Electric and Power Company [Docket No. ER05-24-000] Take notice that on October 6, 2004, Virginia Electric and Power Company (Dominion) tendered for filing a new Appendix E-1 for the Service Agreement under its open access transmission tariff, FERC Electric Tariff Second Revised Volume No. 5. Dominion states that the service agreement is Dominion's Service Agreement for Network Integration Transmission Service and Network Operating Agreement with the North Carolina Electric Membership Corporation (NCEMC). Dominion also states that the revised service agreement adds charges to reimburse Dominion for costs associated with providing a new Aulander Delivery Point for Roanoke Electric Cooperative. Dominion requests an effective date of October 7, 2004. Dominion states that copies of the filing were served upon the NCEMC, the North Carolina Utilities Commission and the Virginia State Corporation Commission. *Comment Date:* 5 p.m. Eastern Time on October 26, 2004. 23. Roger Agnelli [Docket No. ID-4167-000] Take notice that on October 1, 2004, Roger Agnelli filed, tendered for filing an Application for Authority to Hold Interlocking Positions under section 305
(b)of the Federal Power Act, 16 U.S.C. 825d
(b)(2000), and Part 45 of the Commission's Regulations. *Comment Date:* 5 p.m. Eastern Time on November 1, 2004. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov* . Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, DC 20426. This filing is accessible on-line at *http://www.ferc.gov* , using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail *FERCOnlineSupport@ferc.gov* , or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Magalie R. Salas, Secretary. [FR Doc. E4-2663 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2743-045] The Four Dam Pool Power Agency; Notice of Availability of Environmental Assessment October 8, 2004. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects' staff has prepared an Environmental Assessment
(EA)for an application for a non-capacity related amendment of the Terror Lake Project. The Terror Lake Project, FERC No. 2743, is located on the Terror and Kizhuyak Rivers in Kodiak, Alaska. The EA contains the staff's analysis of the potential environmental impacts of the proposal and concludes that approval of the proposal would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is attached to an October 7, 2004 Order titled “Order Amending License and Approving Revised Exhibits,” which is available for review and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426. The EA may also be viewed on the Commission's Web site at *http://www.ferc.gov* using the “elibrary” link. Enter the docket number (prefaced by P-) and excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at
(866)208-3676, or for TTY, contact
(202)502-8659. For further information, contact Rebecca Martin at
(202)502-6012. Magalie R. Salas, Secretary. [FR Doc. E4-2683 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2743-045] The Four Dam Pool Power Agency; Notice of Availability of Environmental Assessment October 8, 2004. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects' staff has prepared an Environmental Assessment
(EA)for an application for a non-capacity related amendment of the Terror Lake Project. The Terror Lake Project, FERC No. 2743, is located on the Terror and Kizhuyak Rivers in Kodiak, Alaska. The EA contains the staff's analysis of the potential environmental impacts of the proposal and concludes that approval of the proposal would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is attached to an October 7, 2004 Order titled “Order Amending License and Approving Revised Exhibits,” which is available for review and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426. The EA may also be viewed on the Commission's Web site at *http://www.ferc.gov* using the “elibrary” link. Enter the docket number (prefaced by P-) and excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at
(866)208-3676, or for TTY, contact
(202)502-8659. For further information, contact Rebecca Martin at
(202)502-6012. Magalie R. Salas, Secretary. [FR Doc. E4-2687 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF04-14-000] Columbia Gas Transmission Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Hardy Storage Project and Virginia Looping Project and Request for Comments on Environmental Issues October 8, 2004. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment
(EA)that will discuss the environmental impacts of Columbia Gas Transmission Corporation's (Columbia) Hardy Storage Project located in Hardy and Hampshire Counties, West Virginia. The EA will also address Virginia Looping 1 Project which consists of constructing new sections of pipeline parallel to Columbia's existing pipeline in Shenandoah, Page, Rockingham, Greene, and Louisa Counties, Virginia. This notice announces the opening of the scoping process we will use to gather input from the public and interested agencies on the projects. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on November 22, 2004. 1 A loop is a segment of pipeline installed adjacent to an existing pipeline and which connects to the existing pipeline at both ends of the loop. The loop allows more gas to be moved through the system. Comments may be submitted in written form or verbally. Further details on how to submit written comments are provided in the public participation section of this notice. Public scoping meetings will be held in early November, and an additional public notice will be issued once the dates and locations are determined. This notice is being sent to affected landowners; Federal, state, and local government representatives and agencies; environmental and public interest groups; other interested parties; and local libraries and newspapers in this proceeding. We encourage government representatives to notify their constituents of these planned projects and encourage them to comment on their areas of concern. Summary of the Proposed Projects Columbia proposes to construct and operate a natural gas storage field and related facilities in Hardy and Hampshire Counties, West Virginia, and loop its existing pipeline in Shenandoah, Page, Rockingham, Greene, and Louisa Counties, Virginia. In addition to the facilities described below, both projects will also involve the construction of aboveground facilities such as valves, meters, meter stations, and pig launchers and receivers. The majority of the facilities proposed on these projects are located within or adjacent to existing cleared rights-of-way. Hardy Storage Project Columbia proposes to store natural gas in the Oriskany sandstone formation in Hardy and Hampshire Counties, West Virginia. The Oriskany is a depleted, self-contained, natural gas producing geologic formation that is located more than a mile underground. Natural gas existed in the Oriskany for millions of years until it was discovered and produced in the 1960s and early 1970s. Natural gas supplies from Appalachia, the Southwest, or other sources will be stored in the field when demand is low, then withdrawn as needed during periods of high demand. Maps depicting Columbia's proposed storage project and related facilities in West Virginia are provided in Appendix 1. 2 Some of the facilities involved in this portion of the project include: 2 The appendices referenced in this notice are not being printed in the **Federal Register** . Copies are available on the Commission's website at the “eLibrary” link or from the Commission's Public Reference and Files Maintenance Branch, Room 2A or call
(202)502-8371. For instructions on connecting to “eLibrary” refer to the end of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. *Existing and new gas wells.* Columbia's 15 existing production wells in Hardy and Hampshire Counties will be reconditioned and upgraded for storage purposes. Columbia may also drill 13 new wells in the storage field, some of which will be directionally drilled from existing well sites. *Replacing pipelines.* Columbia will upgrade and replace the existing pipelines that connect with gas wells in the field to allow them to support the storage operation. Approximately 28 new storage lines of varying diameters and lengths and approximately 28 miles of transmission pipeline will be constructed. *New compressor station.* Located in Hardy County, this 5,000-horsepower facility will use natural gas-fueled engines to inject (compress) gas into and withdraw it out of the storage field, as needed. Virginia Looping Project To transport natural gas from the Hardy Storage Project to markets, Columbia will construct new 24-inch-diameter sections of loop parallel to its existing pipelines in Virginia. This project involves looping approximately 31 miles of Columbia's Line WB-2-VA corridor in Shenandoah, Rockingham, Page, and Greene Counties, and approximately 2.5 miles of Columbia's existing VM-108 corridor in Louisa County. Maps depicting Columbia's proposed loops in Virginia are provided in Appendix 2. Columbia plans to file a formal application for this project with the FERC in early 2005. They are requesting approval to begin construction in late 2005 or early 2006, with most of the construction to be completed by the end of the 2006. Storage field injections are proposed to begin in the spring of 2007. The EA Process Although no formal application for authorizing natural gas facilities has been filed, the FERC staff is initiating its NEPA review now. The purpose of the FERC's Pre-filing Process is to encourage the early involvement of interested stakeholders and to identify and resolve issues before an application is filed with the FERC. The FERC will use the EA to consider the environmental impact that could result if it issues Columbia a Certificate of Public Convenience and Necessity. This notice formally announces our preparation of the EA and the beginning of the process referred to as “scoping.” We 3 are soliciting input from the public and interested agencies to help us focus the analysis in the EA on the potentially significant environmental issues related to the proposed actions. 3 “We,” “us,” and “our” refer to the environmental staff of the Office of Energy Projects. Our independent analysis of the issues will be included in a EA that will be mailed to Federal, state, and local government agencies; elected officials; environmental and public interest groups; affected landowners; other interested parties; local libraries and newspapers; and the FERC's official service list for this proceeding. A 30-day comment period will be allotted for review of the EA. We will consider all comments on the EA in any Commission Order that is issued for the project. With this notice, we are asking these and other Federal, state, and local agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. Agencies that would like to request cooperating status should follow the instructions for filing comments provided below. Public Participation You can make a difference by providing use with your specific comments or concerns about the proposals. Your comments should focus on the potential environmental effects, reasonable alternatives (including alternative storage sites and pipeline routes), and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please mail your comments so that they will be received in Washington, DC on or before November 22, 2004, and carefully follow these instructions: • Send an original and two copies of your letter to: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426; • Label one copy of the comments for the attention of Gas Branch 1, DG2E; • Reference Docket No. PF04-14-000 on the original and both copies. Please note that the Commission encourages electronic filing of comments. See 18 Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on the Commission's Internet Web site at *http://www.ferc.gov* under the “eFiling” link and the link to the User's Guide. Prepare your submission in the same manner as you would if filing on paper and save it to a file on your hard drive. Before you can file comments you will need to create an account by clicking on “Login to File” and then “New User Account.” You will be asked to select the type of filing you are making. This filing is considered a Comment on Filing. When Columbia submits its application for authorization to construct and operate the storage facility, the Commission will publish a Notice of Application in the **Federal Register** and will establish a deadline for interested persons to intervene in the proceeding. Because the Commission's NEPA Pre-filing Process occurs before an application to begin a proceeding is officially filed, petitions to intervene during this process are premature and will not be accepted by the Commission. Environmental Mailing List If you wish to remain on our environmental mailing list, please return the Information Request Form included in Appendix 3. If you do not return this form, you will be removed from our mailing list. Availability of Additional Information Additional information about the project is available from the Commission's Office of External Affairs at 1-866-208-FERC
(3372)or on the FERC Internet Web site ( *http://www.ferc.gov* ). Using the “eLibrary” link, select General Search from the “eLibrary” menu, enter the selected date range and Docket Number ( *i.e.,* PF04-14), and follow the instructions. Searches may also be done using the phrase Hardy Storage Project in the Text Search field. For assistance with access to “eLibrary”, the helpline can be reached at 1-866-208-3676, TTY
(202)502-8659, or at *FERCOnlineSupport@ferc.gov* . The “eLibrary” link on the FERC Internet Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. In addition, the FERC now offers a free service called “eSubscription” that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. To register for this service, go to *http://www.ferc.gov/esubscribenow.htm* . Finally, Columbia has established an Internet Web site for its project at *http://www.columbiagastrans.com/newprojects* . The Web site includes a description of the project, overview map of the proposed sites, contact information for Columbia, and links to related documents. Magalie R. Salas, Secretary. [FR Doc. E4-2681 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF04-14-000] Columbia Gas Transmission Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Hardy Storage Project and Virginia Looping Project and Request for Comments on Environmental Issues October 8, 2004. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment
(EA)that will discuss the environmental impacts of Columbia Gas Transmission Corporation's (Columbia) Hardy Storage Project located in Hardy and Hampshire Counties, West Virginia. The EA will also address Virginia Looping 1 Project which consists of constructing new sections of pipeline parallel to Columbia's existing pipeline in Shenandoah, Page, Rockingham, Greene, and Louisa Counties, Virginia. This notice announces the opening of the scoping process we will use to gather input from the public and interested agencies on the projects. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on November 22, 2004. 1 A loop is a segment of pipeline installed adjacent to an existing pipeline and which connects to the existing pipeline at both ends of the loop. The loop allows more gas to be moved through the system. Comments may be submitted in written form or verbally. Further details on how to submit written comments are provided in the public participation section of this notice. Public scoping meetings will be held in early November, and an additional public notice will be issued once the dates and locations are determined. This notice is being sent to affected landowners; Federal, State, and local government representatives and agencies; environmental and public interest groups; other interested parties; and local libraries and newspapers in this proceeding. We encourage government representatives to notify their constituents of these planned projects and encourage them to comment on their areas of concern. Summary of the Proposed Projects Columbia proposes to construct and operate a natural gas storage field and related facilities in Hardy and Hampshire Counties, West Virginia, and loop its existing pipeline in Shenandoah, Page, Rockingham, Greene, and Louisa Counties, Virginia. In addition to the facilities described below, both projects will also involve the construction of aboveground facilities such as valves, meters, meter stations, and pig launchers and receivers. The majority of the facilities proposed on these projects are located within or adjacent to existing cleared rights-of-way. Hardy Storage Project Columbia proposes to store natural gas in the Oriskany sandstone formation in Hardy and Hampshire Counties, West Virginia. The Oriskany is a depleted, self-contained, natural gas producing geologic formation that is located more than a mile underground. Natural gas existed in the Oriskany for millions of years until it was discovered and produced in the 1960s and early 1970s. Natural gas supplies from Appalachia, the Southwest, or other sources will be stored in the field when demand is low, then withdrawn as needed during periods of high demand. Maps depicting Columbia's proposed storage project and related facilities in West Virginia are provided in Appendix 1. 2 Some of the facilities involved in this portion of the project include: 2 The appendices referenced in this notice are not being printed in the **Federal Register** . Copies are available on the Commission's Web site at the “eLibrary” link or from the Commission's Public Reference and Files Maintenance Branch, Room 2A or call
(202)502-8371. For instructions on connecting to “eLibrary” refer to the end of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. *Existing and new gas wells.* Columbia's 15 existing production wells in Hardy and Hampshire Counties will be reconditioned and upgraded for storage purposes. Columbia may also drill 13 new wells in the storage field, some of which will be directionally drilled from existing well sites. *Replacing pipelines.* Columbia will upgrade and replace the existing pipelines that connect with gas wells in the field to allow them to support the storage operation. Approximately 28 new storage lines of varying diameters and lengths and approximately 28 miles of transmission pipeline will be constructed. *New compressor station* . Located in Hardy County, this 5,000-horsepower facility will use natural gas-fueled engines to inject (compress) gas into and withdraw it out of the storage field, as needed. Virginia Looping Project To transport natural gas from the Hardy Storage Project to markets, Columbia will construct new 24-inch-diameter sections of loop parallel to its existing pipelines in Virginia. This project involves looping approximately 31 miles of Columbia's Line WB-2-VA corridor in Shenandoah, Rockingham, Page, and Greene Counties, and approximately 2.5 miles of Columbia's existing VM-108 corridor in Louisa County. Maps depicting Columbia's proposed loops in Virginia are provided in Appendix 2. Columbia plans to file a formal application for this project with the FERC in early 2005. They are requesting approval to begin construction in late 2005 or early 2006, with most of the construction to be completed by the end of 2006. Storage field injections are proposed to begin in the spring of 2007. The EA Process Although no formal application for authorizing natural gas facilities has been filed, the FERC staff is initiating its NEPA review now. The purpose of the FERC's Pre-filing Process is to encourage the early involvement of interested stakeholders and to identify and resolve issues before an application is filed with the FERC. The FERC will use the EA to consider the environmental impact that could result if it issues Columbia a Certificate of Public Convenience and Necessity. This notice formally announces our preparation of the EA and the beginning of the process referred to as “scoping.” We 3 are soliciting input from the public and interested agencies to help us focus the analysis in the EA on the potentially significant environmental issues related to the proposed actions. 3 “We,” “us,” and “our” refer to the environmental staff of the Office of Energy Projects. Our independent analysis of the issues will be included in a EA that will be mailed to Federal, State, and local government agencies; elected officials; environmental and public interest groups; affected landowners; other interested parties; local libraries and newspapers; and the FERC's official service list for this proceeding. A 30-day comment period will be allotted for review of the EA. We will consider all comments on the EA in any Commission Order that is issued for the project. With this notice, we are asking these and other Federal, State, and local agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. Agencies that would like to request cooperating status should follow the instructions for filing comments provided below. Public Participation You can make a difference by providing us with your specific comments or concerns about the proposals. Your comments should focus on the potential environmental effects, reasonable alternatives (including alternative storage sites and pipeline routes), and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please mail your comments so that they will be received in Washington, DC on or before November 22, 2004, and carefully follow these instructions: • Send an original and two copies of your letter to: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426; • Label one copy of the comments for the attention of Gas Branch 1, DG2E; • Reference Docket No. PF04-14-000 on the original and both copies. Please note that the Commission encourages electronic filing of comments. *See* 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Internet Web site at *http://www.ferc.gov* under the “eFiling” link and the link to the User's Guide. Prepare your submission in the same manner as you would if filing on paper and save it to a file on your hard drive. Before you can file comments you will need to create an account by clicking on “Login to File” and then “New User Account.” You will be asked to select the type of filing you are making. This filing is considered a Comment on Filing. When Columbia submits its application for authorization to construct and operate the storage facility, the Commission will publish a Notice of Application in the **Federal Register** and will establish a deadline for interested persons to intervene in the proceeding. Because the Commission's NEPA Pre-filing Process occurs before an application to begin a proceeding is officially filed, petitions to intervene during this process are premature and will not be accepted by the Commission. Environmental Mailing List If you wish to remain on our environmental mailing list, please return the Information Request Form included in Appendix 3. If you do not return this form, you will be removed from our mailing list. Availability of Additional Information Additional information about the project is available from the Commission's Office of External Affairs at 1-866-208 FERC
(3372)or on the FERC Internet Web site ( *http://www.ferc.gov* ). Using the “eLibrary” link, select General Search from the “eLibrary” menu, enter the selected date range and Docket Number ( *i.e.* , PF04-14), and follow the instructions. Searches may also be done using the phrase Hardy Storage Project in the Text Search field. For assistance with access to “eLibrary”, the helpline can be reached at 1-866-208-3676, TTY
(202)502-8659, or at *FERCOnlineSupport@ferc.gov* . The “eLibrary” link on the FERC Internet Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. In addition, the FERC now offers a free service called “eSubscription” that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. To register for this service, go to *http://www.ferc.gov/esubscribenow.htm* . Finally, Columbia has established an Internet Web site for its project at *http://www.columbiagastrans.com/newprojects* . The Web site includes a description of the project, overview map of the proposed sites, contact information for Columbia, and links to related documents. Magalie R. Salas, Secretary. [FR Doc. E4-2685 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 487] PPL Holtwood, LLC; Notice of Authorization for Continued Project Operation October 7, 2004. On September 25, 2002, PPL Holtwood, LLC, licensee for the Lake Wallenpaupack Project No. 487, filed an application for a new or subsequent license pursuant to the Federal Power Act
(FPA)and the Commission's regulations thereunder. Project No. 487 is located on Wallenpaupack Creek and the Lackawaxen River in Wayne and Pike Counties, Pennsylvania. The license for Project No. 487 was issued for a period ending September 30, 2004. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year to year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project's prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 487 is issued to PPL Holtwood, LLC for a period effective October 1, 2004 through September 30, 2005, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before October 1, 2005, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that PPL Holtwood, LLC is authorized to continue operation of the Lake Wallenpaupack Project No. 487 until such time as the Commission acts on its application for subsequent license. Magalie R. Salas, Secretary. [FR Doc. E4-2667 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests October 8, 2004. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. *Application Type:* Amendment of License. b. *Project No:* 2365-027. c. *Date Filed:* August 31, 2004. d. *Applicant:* Madison Paper Industries, Inc. e. *Name and Location of Project:* The Anson Hydroelectric Project is located on the Kennebec River in Somerset County, Maine. f. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791a—825r. g. *Applicant Contact:* Mr. Christopher C. Bean, Madison Paper Industries, Main Street, P.O. Box 129, Madison, ME 04950-0129,
(207)696-1195. h. *FERC Contact:* James Hunter at
(202)502-6086. i. *Deadline for filing comments, protests, or motions to intervene:* November 8, 2004. j. Description of Request: Madison Paper Industries, as licensee, has filed a license amendment application to include the 520-foot-long, 13.8-kilovolt transmission line connecting the Anson powerhouse to the licensee's paper mill. The licensee states that it became evident following issuance of the new license for the project that the point of interconnection with the local utility's distribution system is at the bus in the paper mill, where project power is transformed to 115 kilovolts for distribution to the utility when the power is not consumed within the mill. The application includes a revised exhibit G drawing showing the location of the transmission line. k. *Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's* Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling
(202)502-8371. This filing may also be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number (P-2365) in the docket number field to access the document. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail *FERCOnlineSupport@ferc.gov, for TTY, call
(202)502-8659. A copy is also available for inspection and reproduction* at the address in item
(g)above. l. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, OR “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. o. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. p. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. *See* , 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at *http://www.ferc.gov* under the “e-Filing” link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E4-2682 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests October 8, 2004. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. *Application Type:* Amendment of License. b. *Project No.:* 2365-027. c. *Date Filed:* August 31, 2004. d. *Applicant:* Madison Paper Industries, Inc. e. *Name and Location of Project:* The Anson Hydroelectric Project is located on the Kennebec River in Somerset County, Maine. f. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791a-825r. g. *Applicant Contact:* Mr. Christopher C. Bean, Madison Paper Industries, Main Street, P.O. Box 129, Madison, ME 04950-0129,
(207)696-1195. h. *FERC Contact:* James Hunter at
(202)502-6086. i. *Deadline for filing comments, protests, or motions to intervene:* November 8, 2004. j. *Description of Request:* Madison Paper Industries, as licensee, has filed a license amendment application to include the 520-foot-long, 13.8-kilovolt transmission line connecting the Anson powerhouse to the licensee's paper mill. The licensee states that it became evident following issuance of the new license for the project that the point of interconnection with the local utility's distribution system is at the bus in the paper mill, where project power is transformed to 115 kilovolts for distribution to the utility when the power is not consumed within the mill. The application includes a revised exhibit G drawing showing the location of the transmission line. k. *Locations of the Application:* A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling
(202)502-8371. This filing may also be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number (P-2365) in the docket number field to access the document. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail *FERCOnlineSupport@ferc.gov* , for TTY, call
(202)502-8659. A copy is also available for inspection and reproduction at the address in item
(g)above. l. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. o. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. p. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. *See* , 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at *http://www.ferc.gov* under the “e-Filing” link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E4-2686 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PL04-14-000, et al.] Connecticut Transmission Infrastructure, et al.; Supplemental Notice October 7, 2004. New England Power Pool and ISO New England, Inc. [Docket No. ER03-1141-003] Devon Power LLC, et al. [Docket Nos. EL04-102-001, EL04-102-002, ER03-563-018, ER03-563-021, ER03-563-025, ER03-563-026, ER03-563-027, ER03-563-028, ER03-563-033, ER03-563-036, ER03-563-038, ER03-563-039, ER03-563-043, ER04-464-002, ER04-464-005, ER04-464-006] Exelon New Boston LLC [Docket No. ER04-344-001] ISO New England Inc. [Docket Nos. EL00-62-055, ER02-2463-003] Mirant Kandall, LLC [Docket Nos. ER03-998-001, ER03-998-002] PPL Wallingford Energy LLC, et al. [Docket Nos. ER03-421-007, ER03-421-008] New England Power Pool Participants [Docket No. ER03-345-003] New England Power Pool [Docket Nos ER02-2330-009, ER02-2330-026, ER02-2330-027, ER02-2330-028, ER02-2330-029] In a Notice of Technical Conference issued September 17, 2004, the Federal Energy Regulatory Commission announced that it would host a technical conference on Wednesday, October 13, 2004 to discuss infrastructure issues for the State of Connecticut and the surrounding region. The technical conference will be held in Room 2C of the Legislative Office Building, 300 Capitol Avenue, Hartford, Connecticut. The time for the technical conference has been changed. The technical conference was previously announced to begin at 10 a.m. and end at 3 p.m. The technical conference is now scheduled to begin at 9 a.m.
(EST)and end at 4 p.m. The goal of the technical conference is to provide a forum for discussion of issues affecting energy infrastructure in and around Connecticut. This discussion will take place between federal, state and regional leaders and industry representatives. The conference will explore proposals for new electric transmission, their impact on electric reliability for the region, implications for connectivity with the entire New England grid and its relation to neighboring regions, the costs of the proposals and possible allocation of those costs. The agenda for this meeting is included as Attachment A to this notice. The conference is a technical discussion between policy leaders, which members of the public are welcome to attend. Registration is not required; however, in-person attendees are asked to register for the conference on-line by close of business on Monday, October 11, 2004 at *http://www.ferc.gov/whats-new/registration/infra-1013-form.asp.* Transcripts of the conference will be immediately available from Ace Reporting Company (202-347-3700 or 1-800-336-6646) for a fee. They will be available for the public on the Commission's eLibrary system seven calendar days after FERC receives the transcript. Additionally, Capitol Connection offers the opportunity for remote listening of the conference via Real Audio or a Phone Bridge Connection for a fee. Persons interested in making arrangements should contact David Reininger or Julia Morelli at the Capitol Connection (703-993-3100) as soon as possible or visit the Capitol Connection Web site at *http://www.capitolconnection.org* and click on “FERC.” For more information about the conference, please contact Sarah McKinley at 202-502-8004, *sarah.mckinley@ferc.gov.* Magalie R. Salas, Secretary. Attachment A Agenda, Connecticut Infrastructure Meeting, Hartford, Connecticut 9 a.m. Introductions Representative Terry Backer, Chair, Energy and Technology Committee, Connecticut Legislature Donald W. Downes, Chairperson, Connecticut Department of Public Utility Control Pat Wood, III, Chairman, Federal Energy Regulatory Commission 9:20 a.m. Infrastructure in Connecticut John Schnagl, Office of Energy Projects, FERC Kevin Kirby, Vice President of Market Operations, ISO New England, Inc. S. Derek Phelps, Executive Director, Connecticut Siting Council David H. Boguslawski, Vice President, Transmission Business, Northeast Utilities Service Company 10:45 a.m. Pricing and Cost Allocation Issues Stephen G. Whitley, Senior Vice President and Chief Operating Officer, ISO New England, Inc. Mary J. Healey, Office of Consumer Counsel, State of Connecticut Joseph F. Brennan, Senior Vice President, Connecticut Business & Industry Association Joseph McGee, Vice President, Public Policy & Programs, SACIA, The Business Council of Fairfield County Thomas L. Welch, Chairman, Maine Public Utilities Commission 12 p.m. Lunch Break 1 p.m. Safety Issues—EMF Dr. Robert Goldberg, Director for EMF Activities and Editor of EMF Health Report, Philadelphia, Pennsylvania 1:30 p.m. Technology Options Dennis Duffy, Senior Vice President, Energy Management, Inc., on behalf of The Competitive Power Coalition Jeffrey A. Donohue, President and CEO, Transénergie U.S. Ltd. Doug Johnson, Composite Conductor Program, 3M Specialty Materials Division John B. Howe, Vice President, Electric Industry Affairs, American Superconductor Steve Doyon, Vice President of Virtual Peaking Capacity
(VPC)Development, Comverge, Inc. 2:45 p.m. Reliability Issues Stephen G. Whitley, Senior Vice President and Chief Operating Officer, ISO New England, Inc. Roger C. Zaklukiewicz, Vice President of Transmission Projects, Northeast Utilities System Anthony Vallillo, President and Chief Operating Officer, United Illuminating Company Lee Olivier, President and Chief Operating Officer, Connecticut Light & Power 4 p.m. Adjourn [FR Doc. E4-2668 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR04-6-000] Cranberry Pipeline Corporation; Notice of Technical Conference October 7, 2004. Take notice that a technical conference will be held on Wednesday, October 13, 2004 at 10:30 a.m.
(EST)at the Commission's Headquarters, 888 First Street, NE., Washington, DC 20426. Arrangements will be made for parties to participate in the technical conference by telephone, with a telephone number to be provided later. The purpose of the conference is to address Cranberry Pipeline Corporation's (Cranberry) section 311 petition for rate approval filed on December 16, 2003. Cranberry should be prepared to discuss cost of service and rate design issues. Questions about the conference and the telephone conference call arrangements should be directed to: Jerilyn Stanley, Office of the General Counsel—Markets, Tariffs and Rates, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426,
(202)502-8159, *jerilyn.stanley@ferc.gov.* Magalie R. Salas, Secretary. [FR Doc. E4-2670 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Hydro Licensing Status Workshop 2004 October 7 , 2004. Hydro Licensing Status Workshop 2004— [Docket No. AD04-014-000] Avondale Mills, Inc.—[Project Nos. 5044-008, Central Vermont Public Service Corporation—Project Nos. 2205-006, 11475-000 and 11478-000, City of Escondido, California—Project No. 176-018, Confederated Tribes of Warm Springs Reservation and Portland General Electric Company—Project No. 2030-036, El Dorado Irrigation District—Project No. 184-065, Enterprise Mill, LLC—Project No. 2935-015, Erie Boulevard Hydropower, LP—Project Nos. 2474-004 and 2539-003, Flambeau Hydro, LLC—Project No. 2064-007, Ford Motor Company—Project No. 362-004, FPL Energy Maine Hydro, LLC—Project Nos. 2283-005, Great Lakes Hydro American, LLC—Project No. 2634-007, Green Mountain Power Corporation—Project No. 2090-003, Gustavus Electric Company—Project No. 11659-002, PacifiCorp—Project Nos. 2071-013, 2342-005, and 2659-011, Pacific Gas & Electric Co.—Project 233-081, PCA Hydro, Inc.—Project No. 2180-007, PPL Great Works, LLC—Project No. 2312-014, PPL Maine, LLC—Project No. 2721-013, PUD No. 1 of Pend Oreille County—Project No. 2042-013, Southern California Edison Company—Project Nos. 2086-03] A one-day, Commissioner-led workshop will be held on Thursday, December 9, 2004, beginning at 10 a.m. (EST), in the Commission Meeting Room at the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC. The workshop will focus on the above-listed pending license applications filed at the Commission. The workshop is open to the public and all interested persons are invited to attend and participate. The goals of the workshop are to:
(1)Review and discuss the pending license applications;
(2)identify unresolved issues;
(3)determine next steps;
(4)agree on who will take the next steps; and
(5)focus on solutions. The workshop will concentrate on identifying the unresolved issues associated with each project, and determining the best course of action to resolve or remove obstacles to final action on each pending license application. A transcript of the discussions will be placed in the public record for Docket No. AD04-014-000 and in the record for each of the pending license applications. Filing Requirements for Paper and Electronic Filings Comments, papers, or other documents related to this proceeding may be filed in paper format or electronically. Those filing electronically do not need to make a paper filing. For paper filings, the original and 8 copies of the comments should be submitted to the Office of the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Paper filings should, at the top of the first page, refer to Docket No. AD04-014-000 and reference the specific project name(s) and project number(s) that the comments concern. The deadline to file comments is January 10, 2005. Comments may be filed electronically via the internet in lieu of paper. The Commission strongly encourages electronic filings. Documents filed electronically via the internet may be prepared in MS Word or Portable Document Format. To file the document, access the Commission's Web site at *www.ferc.gov* , click on “e-Filing” and then follow the instructions on the screen. First-time users will have to establish a user name and password. The Commission will send an automatic acknowledgment to the sender's e-mail address upon receipt of comments. User assistance for electronic filing is available at 202-502-8258 or by e-mail to *efiling@ferc.gov* . Comments should not be submitted to the e-mail address. All comments will be placed in the Commission's public files and will be available for inspection in the Commission's Public Reference Room at 888 First Street, NE., Washington DC 20426, during regular business hours. Additionally, all comments may be viewed on the Commission's Web site at *www.ferc.gov* using the “eLibrary” link. For assistance, call toll free 1-866-208-3676, or for TTY 202-502-8659, or by e-mail to *FERCOnlineSupport@ferc.gov* . Opportunities for Listening, Participating, and Viewing the Workshop Offsite and Obtaining a Transcript The workshop will be transcribed. Those interested in transcripts immediately for a fee should contact Ace-Federal Reporters, Inc., at 202-347-3700, or 1-800-336-6646. Transcripts will be available free to the public on the Commission's e-library system about two weeks after the workshop. For those involved in the specific projects being discussed, we believe the best way to achieve the goals of the workshop is for you and your staff to attend the workshop in person. However, we understand that budgetary and other constraints may limit travel to Washington, DC. Therefore, we have made alternative arrangements for you to listen, view, or participate in the workshop through the internet, video conferencing, or teleconferencing. The Capitol Connection offers the opportunity for remote listening and viewing of the conference. It is available for a fee, live over the Internet, by phone or via satellite. Persons interested in receiving the broadcast, or who need information on making arrangements should contact David Reininger or Julia Morelli at the Capitol Connection (703-993-3100) as soon as possible or visit the Capitol Connection Web site at *http://www.capitolconnection.org* and click on “FERC.” Anyone wishing to participate via teleconference should call or e-mail Ken Hogan at 202-502-8434 or *kenneth.hogan@ferc.gov* by December 1, 2004, to receive the toll free telephone number to join the teleconference. Anyone interested in participating in the workshop via video teleconference from one of the Commission's regional offices should call or e-mail the following staff, by December 1, 2004, to make arrangements. Seating capacity is limited. Regional office Staff contact Telephone number E-mail address Atlanta Charles Wagner 770-452-3765 charles.wagner@ferc.gov. Chicago David Simon 312-596-4448 david.simon@ferc.gov. New York Chuck Goggins 212-273-5910 charles.goggins@ferc.gov. Portland Pat Regan 503-552-2741 patrick.regan@ferc.gov. San Francisco John Wiegel 415-369-3336 john.wiegel@ferc.gov. By December 2, 2004, an agenda for the workshop and information about the pending license applications will be posted on the Commission's Web site under Hydro Licensing Status Workshop 2004. Anyone without access to the Commission's Web site, or who has questions should contact Alan Mitchnick at 202-502-6074, or e-mail *alan.mitchnick@ferc.gov* . This meeting is posted on the Commission's calendar located at *http://www.ferc.gov/EventCalendar/EventsList.aspx* along with other related information. Magalie R. Salas, Secretary. [FR Doc. E4-2680 Filed 10-15-04; 8:45 am] BILLING CODE 6717-01-P ENVIRONMENTAL PROTECTION AGENCY [FRL-7828-2] Board of Scientific Counselors, Endocrine Disrupting Chemicals Subcommittee Meetings AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of meetings. SUMMARY: Pursuant to the Federal Advisory Committee Act, Public Law 92-463, the Environmental Protection Agency, Office of Research and Development (ORD), gives notice of four meetings of the Board of Scientific Counselors
(BOSC)Endocrine Disrupting Chemicals
(EDC)Subcommittee. DATES: Three conference call meetings will be held on:
(1)Tuesday, November 2, 2004 from 12 p.m. to 2 p.m.,
(2)Wednesday, December 1, 2004 from 12 p.m. to 2 p.m., and
(3)Thursday, January 6, 2005 from 12 p.m. to 2 p.m. One face-to-face meeting will begin on Monday, December 13, 2004 (8:30 a.m. to 5:30 p.m.); continue on Tuesday, December 14, 2004 (8:30 a.m. to 5:30 p.m.); and conclude on Wednesday, December 15, 2004 (8:30 a.m. to 1 p.m.). All times noted are eastern standard time. The meetings may adjourn early if all business is finished. ADDRESSES: *Conference Calls:* Participation in the conference calls will be by teleconference only—meeting rooms will not be used. Members of the public who wish to obtain the call-in number and access code to participate in a teleconference meeting may contact Dr. Neil Stiber, Designated Federal Officer, via telephone/voice mail at
(202)564-1573, via e-mail at *stiber.neil@epa.gov,* or by mail at Environmental Protection Agency, Office of Research and Development, Mail Code 8104-R, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, by four work days prior to each conference call. *Face-to-Face Meeting:* The face-to-face meeting will be held at the U.S. EPA Research Triangle Park
(RTP)Campus, in Room C-111C on December 13 and 14 and in Room C-111A on December 15, located at 109 T.W. Alexander Drive, Research Triangle Park, NC 27711. Document Availability Any member of the public interested in receiving a draft agenda for, or making a presentation at, one of the conference calls or the face-to-face meeting, may contact Dr. Neil Stiber, Designated Federal Officer, via telephone/voice mail at
(202)564-1573, via e-mail at *stiber.neil@epa.gov,* or by mail at Environmental Protection Agency, Office of Research and Development, Mail Code 8104-R, 1200 Pennsylvania Avenue, NW., Washington, DC 20460. In general, each individual making an oral presentation will be limited to a total of three minutes. Requests for the draft agendas or for making oral presentations at the conference calls or the face-to-face meeting will be accepted up to 1 business day before each conference call/meeting date. The draft agendas can also be viewed through EDOCKET, as provided in Unit I.A. of the SUPPLEMENTARY INFORMATION section. Submitting Comments Comments may be submitted electronically, by mail, or through hand delivery/courier. Follow the detailed instructions as provided in Unit I.B. of the SUPPLEMENTARY INFORMATION section. Written comments will be accepted up to 1 business day before the conference calls/meeting dates. FOR FURTHER INFORMATION CONTACT: Dr. Neil Stiber, Designated Federal Officer, via telephone/voice mail at
(202)564-1573, via e-mail at *stiber.neil@epa.gov,* or by mail at Environmental Protection Agency, Office of Research and Development, Mail Code 8104-R, 1200 Pennsylvania Avenue, NW., Washington, DC 20460. SUPPLEMENTARY INFORMATION: I. General Information Proposed agenda items for the conference calls include, but are not limited to: charge questions, objective of program reviews, background on the U.S. EPA's EDC research program, writing assignments, and planning for the face-to-face meeting. Proposed agenda items for the face-to-face meeting include, but are not limited to: presentations by key EPA principal investigators in the EDC research program, poster sessions on EPA's EDC research, writing the draft report, and presentation of the subcommittee's draft responses to the charge questions. The conference calls and face-to-face meeting are open to the public. Information on Services for the Handicapped: Individuals requiring special accommodations at this meeting should contact Neil Stiber, Designated Federal Officer, at
(202)564-1573 at least five business days prior to the meeting so that appropriate arrangements can be made to facilitate their participation. A. How Can I Get Copies of Related Information? 1. *Docket.* EPA has established an official public docket for this action under Docket ID No. ORD-2004-0020. The official public docket consists of the documents specifically referenced in this action, any public comments received, and other information related to this action. Documents in the official public docket are listed in the index in EPA's electronic public docket and comment system, EDOCKET. Documents may be available either electronically or in hard copy. Electronic documents may be viewed through EDOCKET. Hard copies of the draft agendas may be viewed at the Board of Scientific Counselors, Endocrine Disrupting Chemicals Meetings Docket in the EPA Docket Center (EPA/DC), EPA West, Room B102, 1301 Constitution Ave., NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is
(202)566-1744, and the telephone number for the ORD Docket is
(202)566-1752. 2. *Electronic Access.* You may access this **Federal Register** document electronically through the EPA Internet under the “Federal Register” listings at *http://www.epa.gov/fedrgstr/.* An electronic version of the public docket is available through EDOCKET. You may use EDOCKET at *http://www.epa.gov/edocket/* to submit or view public comments, access the index listing of the contents of the official public docket, and to access those documents in the public docket that are available electronically. Once in the system, select “search,” then key in the appropriate docket identification number. For public commenters, it is important to note that EPA's policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing in EPA's electronic public docket as EPA receives them and without change, unless the comment contains copyrighted material, confidential business information (CBI), or other information whose disclosure is restricted by statute. When EPA identifies a comment containing copyrighted material, EPA will provide a reference to that material in the version of the comment that is placed in EPA's electronic public docket. The entire printed comment, including the copyrighted material, will be available in the public docket. Public comments submitted on computer disks that are mailed or delivered to the docket will be transferred to EPA's electronic public docket. Public comments that are mailed or delivered to the Docket will be scanned and placed in EPA's electronic public docket. B. How and to Whom Do I Submit Comments? You may submit comments electronically, by mail, or through hand delivery/courier. To ensure proper receipt by EPA, identify the appropriate docket identification number in the subject line on the first page of your comment. Please ensure that your comments are submitted within the specified comment period. 1. *Electronically.* If you submit an electronic comment as prescribed below, EPA recommends that you include your name, mailing address, and an e-mail address or other contact information in the body of your comment. Also include this contact information on the outside of any disk or CD ROM you submit, and in any cover letter accompanying the disk or CD ROM. This ensures that you can be identified as the submitter of the comment and allows EPA to contact you in case EPA cannot read your comment due to technical difficulties or needs further information on the substance of your comment. EPA's policy is that EPA will not edit your comment, and any identifying or contact information provided in the body of a comment will be included as part of the comment that is placed in the official public docket, and made available in EPA's electronic public docket. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. i. *EDOCKET.* Your use of EPA's electronic public docket to submit comments to EPA electronically is EPA's preferred method for receiving comments. Go directly to EDOCKET at *http://www.epa.gov/edocket,* and follow the online instructions for submitting comments. To access EPA's electronic public docket from the EPA Internet Home Page, *www.epa.gov,* select “Information Sources,” “Dockets,” and “EDOCKET.” Once in the system, select “search,” and then key in Docket ID No. ORD-2004-0020. The system is an anonymous access system, which means EPA will not know your identity, e-mail address, or other contact information unless you provide it in the body of your comment. ii. *E-mail.* Comments may be sent by electronic mail (e-mail) to ORD.Docket@epa.gov, Attention Docket ID No. ORD-2004-0020. In contrast to EPA's electronic public docket, EPA's e-mail system is not an anonymous access system. If you send an e-mail comment directly to the docket without going through EPA's electronic public docket, EPA's e-mail system automatically captures your e-mail address. E-mail addresses that are automatically captured by EPA's e-mail system are included as part of the comment that is placed in the official public docket, and made available in EPA's electronic public docket. iii. *Disk or CD ROM.* You may submit comments on a disk or CD ROM that you mail to the mailing address identified in Unit I.B.2. These electronic submissions will be accepted in WordPerfect or ASCII file format. Avoid the use of special characters and any form of encryption. 2. *By Mail.* Send your comments to: U.S. Environmental Protection Agency, ORD Docket, EPA Docket Center (EPA/DC), Mailcode: 28221T, 1200 Pennsylvania Ave., NW., Washington, DC, 20460, Attention Docket ID No. ORD-2004-0020. 3. *By Hand Delivery or Courier.* Deliver your comments to: EPA Docket Center (EPA/DC), Room B102, EPA West Building, 1301 Constitution Avenue, NW., Washington, DC, Attention Docket ID No. ORD-2004-0020. ( **note:** this is not a mailing address). Such deliveries are only accepted during the docket's normal hours of operation as identified in Unit I.A.1. Dated: October 12, 2004. Kevin Y. Teichman, Director, Office of Science Policy. [FR Doc. 04-23262 Filed 10-15-04; 8:45 am]
Connectionstraces to 14
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.