Code · REGISTER · 2004-10-18 · Nuclear Regulatory Commission (NRC) · Rules and Regulations

Rules and Regulations. Notice of availability of “EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities, Draft Report for Comment,” and request for public comment

605 words·~3 min read·/register/2004/10/18/04-23240·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Nuclear Regulatory Commission (NRC)
Action: Notice of availability of “EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities, Draft Report for Comment,” and request for public comment
Citation: FR Doc. 04-23240 · NUREG/CR-6850

Summary

The Nuclear Regulatory Commission (NRC) is announcing the availability of NUREG/CR-6850, “EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities Volume 1 and 2, Draft for Public Comment.”

Dates

Comments on this document should be submitted by December 17, 2004. Comments received after that date will be considered to the extent practicable. To ensure efficient and complete comment resolution, comments should include references to the section, page, and line numbers of the document to which the comment applies, if possible.

Supplementary Information

Draft NUREG/CR-6850, “EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities” The purpose of EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities Draft Report for Comment (NUREG/CR-6850) is to provide state-of-the-art methods, tools, and data for the conduct of fire Probabilistic Risk Assessment (PRA). This methodology was developed under the program, the Fire Risk Requantification Study, which was conducted as a joint activity between EPRI and RES under the terms of an EPRI/RES Memorandum of Understanding on Cooperative Nuclear Safety Research and accompanying Fire Risk Addendum. Licensee applications and U.S. NRC review guidance with respect to many regulatory activities such as the risk-informed, performance-based fire protection rule (endorsing NFPA 805) will benefit for more robust methods. This research addresses the full breadth of FRA technical issues for power operations, and includes consideration of large early release frequency. The current scope excludes low power/shutdown operations, spent fuel pool accidents, sabotage, and PRA level 3 estimates of consequence. While the primary objective of the project was to consolidate existing research from EPRI and NRC in state-of-the-art methods, the newly documented methods represent a significant advancement in many areas over previously documented methods. The NRC is seeking public comment in order to receive feedback from the widest range of interested parties and to ensure that all information relevant to developing this document is available to the NRC staff. This document is issued for comment only and is not intended for interim use. The NRC will review public comments received on the document, incorporate suggested changes as necessary, and issue the final NUREG/CR-6850 for use. Dated at Rockville, MD, this 8th day of October 2004. For the Nuclear Regulatory Commission. Mark A. Cunningham, Acting Deputy Director, Division of Risk Analysis and Applications, Office of Nuclear Regulatory Research. [FR Doc. 04-23240 Filed 10-15-04; 8:45 am]

★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.