Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2003-10-30 · NUCLEAR REGULATORY COMMISSION · Notices

Notices. NUCLEAR REGULATORY COMMISSION

601 words·~3 min read·/register/2003/10/30/03-27329·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 7555-01-M NUCLEAR REGULATORY COMMISSION [Docket No. 52-007] Exelon Generation Company, LLC; Notice of Acceptance of Application for Early Site Permit for the Clinton ESP Site On September 25, 2003, the Nuclear Regulatory Commission (NRC, the Commission) received an application from Exelon Generation Company, LLC (Exelon) filed pursuant to Section 103 of the Atomic Energy Act and 10 CFR Part 52, for an early site permit
(ESP)for property co-located with the existing Clinton Power Station facility near Clinton, Illinois, hereafter identified as the Clinton ESP site. A notice of receipt and availability of this application was previously published in the **Federal Register** (68 FR 61020; October 24, 2003). An applicant may seek an ESP in accordance with Subpart A of 10 CFR Part 52 separate from the filing of an application for a construction permit
(CP)or combined license
(COL)for a nuclear power facility. The ESP process allows resolution of issues relating to siting. At any time during the period of an ESP (up to 20 years), the permit holder may reference the permit in a CP or COL application. The NRC staff has determined that Exelon has submitted information in accordance with 10 CFR Part 52 that is sufficiently complete and acceptable for docketing. The Docket Number established for this application is 52-007. The NRC staff will perform a detailed technical review of the application, and docketing of the ESP application does not preclude the NRC from requesting additional information from the applicant as the review proceeds, nor does it predict whether the Commission will grant or deny the application. The Commission will conduct a hearing in accordance with 10 CFR 52.21 and will receive a report on the application from the Advisory Committee on Reactor Safeguards in accordance with 10 CFR 52.23. If the Commission then finds that the application meets the applicable standards of the Atomic Energy Act and the Commission's regulations, and that required notifications to other agencies and bodies have been made, the Commission will issue an ESP, in the form and containing conditions and limitations that the Commission finds appropriate and necessary. In accordance with 10 CFR Part 51, the Commission will also prepare an environmental impact statement for the proposed action. Pursuant to 10 CFR 51.26, and as part of the environmental scoping process, the staff intends to hold a public scoping meeting. Detailed information regarding this meeting will be included in a future **Federal Register** notice. Finally, the Commission will announce, in a future **Federal Register** notice, the opportunity to petition for leave to intervene in the hearing required for this application by 10 CFR 52.21. A copy of the Exelon ESP application is available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. It is also accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, *http://www.nrc.gov/reading-rm/adams.html.* The accession number for the application is ML032721596. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC Public Document Room staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to *pdr@nrc.gov.* The application is also available to local residents at the Vespasian Warner Public Library in Clinton, Illinois. Dated at Rockville, Maryland this 27th day of October 2003. For the Nuclear Regulatory Commission. James E. Lyons, Program Director, New, Research and Test Reactors Program, Division of Regulatory Improvement Programs, Office of Nuclear Reactor Regulation. [FR Doc. 03-27329 Filed 10-29-03; 8:45 am]
Connectionstraces to 3
2 references not yet in our index
  • 10 CFR 52
  • 10 CFR 51
Citation graph
cites case law
Notices
NUCLEAR REGULATORY COMMISSION
Cite10 CFR 52
Cite10 CFR 51
Cites 5Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.