Rules and Regulations. Notice of temporary deviation from regulations
/register/2003/06/10/03-14590·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 03-14590 · CGD07-03-087 · 33 CFR 117
Summary
The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the NE. 8th Street (George Bush Boulevard) bridge at Delray Beach across the Atlantic Intracoastal Waterway, mile 1038.7 in Delray Beach, Palm Beach County, Florida. Under this deviation, the bridge need only open a single-leaf of the bridge and shall provide double-leaf openings with two-hours advance notice to the bridge tender. This temporary deviation is required to allow the bridge owner to safely complete repairs to the bridge.
Dates
This deviation is effective from 7 a.m. on June 16, 2003, until 6 p.m. on August 16, 2003.
Supplementary Information
The existing regulations of the NE. 8th Street bridge, mile 1038.7 at Delray Beach require the bridge to open on signal; except that, from November 1 to May 31, from 11 a.m. to 6 p.m., on Saturdays, Sundays and Federal holidays, the draw need open only on the hour, quarter-hour, half-hour, and three quarter-hour. On May 7, 2003, Palm Beach County, the bridge owner, requested a deviation from the current regulations to allow the bridge to only open a single-leaf of the bridge. Double-leaf openings are available with two-hours advance notice to the bridge tender. The other leaf of the bridge will remain in the upright, open to navigation position. This schedule will be in effect from 7 a.m. on June 16, 2003, to 6 p.m. on July 3, 2003, and from 7 a.m. on July 8, 2003, to 6 p.m. on August 16, 2003. During all other times, the bridge will open according to the published schedule in 33 CFR 117.261(z). This temporary deviation is required to allow the bridge owner to safely complete repairs to the bridge structure. The District Commander has granted a temporary deviation from the operating requirements listed in 33 CFR 117.261(z). Under this deviation, the NE. 8th Street (George Bush Boulevard) bridge need only open a single-leaf of the bridge from 7 a.m. on June 16, 2003, to 6 p.m. on July 3, 2003, and from 7 a.m. on July 8, 2003, to 6 p.m. on August 16, 2003. During this time the bridge shall provide double-leaf openings with two-hours advance notice to the bridge tender. Dated: May 29, 2003. Greg Shapley, Chief, Bridge Administration, Seventh Coast Guard District. [FR Doc. 03-14590 Filed 6-9-03; 8:45 am]
Connectionstraces to 1
- 33 CFR 117