Notices. Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment
303 words·~1 min read·
/register/2003/01/31/03-2194·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
BILLING CODE 4710-06-P DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Ex Parte No. 290 (Sub No. 4)] Railroad Cost Recovery Procedures—Productivity Adjustment AGENCY: Surface Transportation Board. ACTION: Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment. SUMMARY: The Surface Transportation Board proposes to adopt 1.019 (1.9%) as the measure of average change in railroad productivity for the 1997-2001 (5-year) period. The current value of 4.2% was developed for the 1996 to 2000 period.
DATES: Comments are due by February 17, 2003. EFFECTIVE DATE: The proposed productivity adjustment is effective 30 days after the date of service. ADDRESSES: Send comments (an original and 10 copies) referring to STB Ex Parte No. 290 (Sub-No. 4) to: Office of the Secretary, Case Control Branch, 1925 K Street, NW., Washington, DC 20423-0001. Parties should submit all pleading and attachments on a 3.5-inch diskette in WordPerfect 6.0 or 6.1 compatible format. FOR FURTHER INFORMATION CONTACT:
H. Jeff Warren,
(202)565-1533. Federal Information Relay Service
(FIRS)for the hearing impaired: 1-800-877-8339. SUPPLEMENTARY INFORMATION: Additional information is contained in the Board's decision, which is available on our Web site *http://www.stb.dot.gov.* To purchase a copy of the full decision, write to, call, or pick up in person from the Board's contractor, Da -To-Da Legal, Suite 405, 1925 K Street, NW., Washington, DC 20006, phone
(202)293-7776. [Assistance for the hearing impaired is available through FIRS: 1-800-877-8339.] This action will not significantly affect either the quality of the human environment or energy conservation. Pursuant to 5 U.S.C. 605(b), we conclude that our action will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act. Decided: January 24, 2003. By the Board, Chairman Nober, Vice Chairman Burkes, and Commissioner Morgan. Vernon A. Williams, Secretary. [FR Doc. 03-2194 Filed 1-30-03; 8:45 am]
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
Notices
Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment
Cites 1Cited by 0 across 0 sources