Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2002-10-28 · Coast Guard, DOT · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

378 words·~2 min read·/register/2002/10/28/02-27373

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 5001-05-P DEPARTMENT OF TRANSPORTATION Coast Guard 33 CFR Part 117 [CGD01-02-123] Drawbridge Operation Regulations: Taunton River, MA AGENCY: Coast Guard, DOT. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the Brightman Street Bridge, mile 1.8, across the Taunton River between Fall River and Somerset, Massachusetts. This deviation from the regulations allows the bridge to open only one lift span for the passage of vessel traffic from 9 p.m. on November 8, 2002 through 4 p.m. on November 22, 2002.
During this deviation the Fall River lift span will remain in the closed position for vessel traffic and the Somerset lift span will be fully operational at all times. This deviation is necessary to facilitate scheduled maintenance at the bridge. DATES: This deviation is effective from November 8, 2002 through November 22, 2002. FOR FURTHER INFORMATION CONTACT: John W. McDonald, Project Officer, First Coast Guard District, at
(617)223-8364. SUPPLEMENTARY INFORMATION: The bridge owner, Massachusetts Highway Department, requested a temporary deviation from the drawbridge operating regulations to facilitate necessary structural repairs at the bridge, replacement of the main floor beam, at the bridge. Under this deviation the Brightman Street Bridge, mile 1.8, across the Taunton River in Massachusetts, will be allowed to open only a single lift span for the passage of vessel traffic from 9 p.m. on November 8, 2002 through 4 p.m. on November 22, 2002. During this deviation the Fall River lift span will remain in the closed position for vessel traffic and the Somerset lift span will be fully operational at all times. There have been few requests to open this bridge during the requested time period scheduled for these structural repairs in past years. The Coast Guard and the bridge owner coordinated this closure with the facilities upstream from the bridge and no objections to this scheduled closure were received. This deviation from the operating regulations is authorized under 33 CFR 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible. Dated: October 18, 2002. V.S. Crea, Rear Admiral, Coast Guard, Commander, First Coast Guard District. [FR Doc. 02-27373 Filed 10-25-02; 8:45 am]
Connectionstraces to 1
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.