Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2002-09-09 · Coast Guard, DOT · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

395 words·~2 min read·/register/2002/09/09/02-22828·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DOT
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 02-22828 · CGD08-02-021 · 33 CFR 117

Summary

The Commander, Eighth Coast Guard District has issued a temporary deviation from the regulation governing the operation of the Union Pacific Railroad vertical lift drawbridge across the Ouachita River, mile 114.3, near Riverton, Caldwell Parish, Louisiana. This deviation allows the draw to remain closed to navigation from 8 a.m. on Monday, September 23, 2002 until 5 p.m. on Thursday, September 26, 2002. The deviation is necessary to allow for the installation of new diesel-powered generators and some modifications of the gears in the driveline.

Dates

This deviation is effective from 8 a.m. on September 23, 2002 until 5 p.m. on September 26, 2002.

Supplementary Information

The Union Pacific Railroad vertical lift drawbridge across the Ouachita River, mile 114.3, near Riverton, Caldwell Parish, Louisiana, has a vertical clearance of 7 feet above mean high water, elevation 71.0 feet NGVD, in the closed-to-navigation position and 57 feet above mean high water in the open-to-navigation position. Navigation on the waterway consists of tugs with tows and occasional recreational craft. Presently, the draw opens on signal for the passage of vessels. The Union Pacific Railroad requested a temporary deviation for the operation of the drawbridge to accommodate the replacement of diesel-powered generators and to modify the gears in the driveline. This work is essential for continued operation of the draw span of the bridge. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: August 29, 2002. Roy J. Casto, Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District. [FR Doc. 02-22828 Filed 9-6-02; 8:45 am]

Connectionstraces to 1
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.