BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File an Application for a New License August 14, 2002. a. *Type of Filing:* Notice of Intent to File an Application for a New License. b. *Project No.:* P-2216. c. *Date Filed:* August 2, 2002. d. *Submitted By:* New York Power Authority. e. *Name of Project:* Robert Moses-Niagara Hydroelectric Project f. *Location:* On the Niagara River, in the Town of Lewiston and the Town of Niagara, Niagara County, New York.
The project does not occupy any Federal lands. g. *Filed Pursuant To:* Section 15 of the Federal Power Act, 18 CFR 16.6 of the Commission's regulations. h. *FERC's Contact:* Patti Leppert at
(202)502-6034; e-mail at *patricia.leppert@ferc.gov.* i. *Licensee's Contact:* Mr. Keith Silliman, Director, Niagara Relicensing, New York Power Authority, 30 South Pearl Street, Albany, New York 12207-3425,
(518)433-6735. j. *Effective Date of Current License:* September 1, 1957. k. *Expiration Date of Current License:* August 31, 2007. l. The existing project has a conventional development and a pumped storage development for a total current installed capacity of 2,538 megawatts (based on currently completed upgrades). Existing project facilities include:
(a)Two 700-foot-long intake structures located on the upper Niagara River about 2.6 miles upstream from the American Falls;
(b)two 4.3-mile-long concrete underground water supply conduits, each measuring 46 feet wide by 66.5 feet high;
(c)a forebay;
(d)the Lewiston Pump-Generating Plant, measuring 975 feet long by 240 feet wide by 160 feet high;
(e)the 1,900-acre Lewiston Reservoir at a maximum water surface elevation of 658 feet United States Lake Survey Datum;
(f)the Robert Moses Niagara power plant, including an intake structure, measuring 1,100 feet long by 190 feet wide by 100 feet high;
(g)a switch yard; and
(h)appurtenant facilities. m. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by August 31, 2005. Linwood A. Watson, Jr., Deputy Secretary. [FR Doc. 02-21152 Filed 8-19-02; 8:45 am]
Connectionstraces to 2
Citation graph
cites case law
Rules and Regulations
DEPARTMENT OF ENERGY
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.