Notices. Notice of finding of no significant impact

437 words·~2 min read·/register/2002/05/30/02-13525

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 3410-16-P DEPARTMENT OF AGRICULTURE Rural Utilities Service Georgia Transmission Corporation; Notice of Finding of No Significant Impact AGENCY: Rural Utilities Service, USDA. ACTION: Notice of finding of no significant impact. SUMMARY: Notice is hereby given that the Rural Utilities Service
(RUS)has made a finding of no significant impact (FONSI) with respect to a request from Georgia Transmission Corporation for assistance from RUS to finance the construction of a 230 kV electric transmission line in Colquitt, Brooks, and Lowndes Counties, Georgia. FOR FURTHER INFORMATION CONTACT: Bob Quigel, Environmental Protection Specialist, Engineering and Environmental Staff, RUS, Stop 1571, 1400 Independence Avenue, SW., Washington, DC 20250-1571, telephone
(202)720-0468, fax
(202)720-0820, e-mail at *bquigel@rus.usda.gov* . SUPPLEMENTARY INFORMATION: Georgia Transmission Corporation proposes to construct approximately 37.5 miles of 230 kV transmission line from Georgia Power Company's East Moultrie Substation to Georgia Power Company's West Valdosta Substation. The East Moultrie Substation is located northeast of Moultrie approximately 3/4 miles west of the intersection of State Road 35 and J.O. Stewart Road. The West Valdosta Substation is located on Snake Nation Road west of Valdosta approximately 0.4 miles west of the intersection of Snake Nation Road and Shiloh Road (County Road 775). The transmission line will traverse through southwestern Colquitt County, Georgia, the northeast corner of Brooks County, Georgia, and western Lowndes County, Georgia. Single pole and H-frame structures will be used to support the transmission line conductors and shield wires. Where single pole structures are used, the width of the right-of-way will be 100 feet. Normally, where the proposed right-of-way parallels a road, the centerline will be located approximately 9 feet outside the road right-of-way and the transmission line easement will extend another 50 feet. Where H-frame structures are used, primarily to cross large center-pivot irrigation systems, the width of the right-of-way will be 125 feet. Approximately 286 single pole concrete structures will be used for the majority of this project. Four concrete H-frame structures, typically with steel crossarms, will be used to span large center-pivot irrigation systems. Typical pole structures for this project will be approximately 95 feet in height. The conductors will be approximately 1 1/3 inches in diameter. Three-eighths inch diameter shield wire will be used for lightning protection. Copies of the FONSI are available for review at, or can be obtained from, RUS at the address provided herein or from Mr. Vince Howard, Georgia Transmission Corporation, 2100 East Exchange Place, Tucker, Georgia 30085-2088, telephone
(770)270-7635. Mr. Howard's e-mail address is *vince.howand@gatrans.com* . Dated: May 23, 2002. Blaine D. Stockton, Assistant Administrator, Electric Program, Rural Utilities Service. [FR Doc. 02-13525 Filed 5-29-02; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.