Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2002-05-09 · DEPARTMENT OF ENERGY · Rules and Regulations

Rules and Regulations. DEPARTMENT OF ENERGY

674 words·~3 min read·/register/2002/05/09/02-11598·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Tendered for Filing With the Commission, Solicitation of Additional Study Requests, and Establishing Procedures for Relicensing and a Deadline for Submission of Final Amendments May 3, 2002. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* New Major License. b. *Project No.:* 2574-032. c. *Date Filed:* April 29, 2002. d. *Applicant:* Merimil Limited Partnership. e. *Name of Project:* Lockwood Project. f. *Location:* On the Kennebec River in Kennebec County, near City of Waterville and Town of Winslow, Maine.
The project does not affect federal lands. g. *Filed Pursuant to:* Federal Power Act 16 U.S.C. 791 (a)-825(r). h. *Applicant Contact:* Mr. F. Allen Wiley, Kennebec Hydro Resources Inc., c/o FPL Energy Maine Hydro, LLC, 150 Main Street, Lewiston, ME 04240,
(207)795-1342. i. *FERC Contact:* David Turner,
(202)219-2844 or *david.turner@ferc.gov* . j. *Cooperating agencies:* We are asking Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in item k below. k. *Deadline for filing additional study requests and requests for cooperating agency status:* June 28, 2002. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Additional study requests and requests for cooperating agency status may be filed electronically via the Internet in lieu of paper. *See* 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site ( *http://www.ferc.gov* ) under the “e-Filing” link. l. This application is not ready for environmental analysis at this time. m. *The existing Lockwood Project consists of:*
(1)A 1,300-foot-long concrete gravity dam, consisting of three spillway sections, a small island, and the forebay headworks;
(2)450-foot-long forebay;
(3)a 81.5-acre reservoir;
(3)two powerhouses, one containing six vertical Francis type turbines and the second containing one horizontal variable pitch kaplan turbine, for a total installed capacity of 7,250 kilowatts;
(4)about 4,225 feet of buried and overhead transmission lines; and
(5)appurtenant facilities. The project is estimated to generate an average of 30,911 megawatthours annually. n. A copy of the application is on file with the Commission and is available for public inspection. This filing may also be viewed on the Web at *http://www.ferc.gov* using the “RIMS” link—select “Docket #” and follow the instructions (call 202-208-2222 for assistance). A copy is also available for inspection and reproduction at the address in item h above. o. With this notice, we are initiating consultation with the *MAINE STATE HISTORIC PRESERVATION OFFICER (SHPO),* as required by § 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. p. *Procedural schedule and final amendments* : The application will be processed according to the following milestones, some of which may be combined to expedite processing: Notice of application has been accepted for filing Notice of NEPA Scoping (unless scoping has already occurred) Notice of application is ready for environmental analysis Notice of the availability of the draft NEPA document Notice of the availability of the final NEPA document Order issuing the Commission's decision on the application Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Magalie R. Salas, Secretary. [FR Doc. 02-11598 Filed 5-8-02; 8:45 am]
Connectionstraces to 3
Citation graph
cites case law
Rules and Regulations
DEPARTMENT OF ENERGY
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.