Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2002-03-18 · Coast Guard, DOT · Notices

Notices. Notice of temporary deviation from regulations

431 words·~2 min read·/register/2002/03/18/02-6358

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4810-31-P DEPARTMENT OF TRANSPORTATION Coast Guard 33 CFR Part 117 [CGD05-02-006] Drawbridge Operation Regulations; Great Egg Harbor Bay, New Jersey AGENCY: Coast Guard, DOT. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Route 9/Beesleys Point Bridge across Great Egg Harbor Bay, mile 3.5, between Somers Point and Beesleys Point, in New Jersey.
From March 11, 2002, through April 5, 2002, the bridge may remain in the closed position Monday through Friday from 7 a.m. to 5 p.m. However, on Saturday and Sunday the bridge will open on signal for marine traffic. This closure is necessary to conduct the emergency structural repairs to the bascule span. DATES: This deviation is effective from 7 a.m. on March 11, 2002, until 5 p.m. on April 5, 2002. FOR FURTHER INFORMATION CONTACT: Ann B. Deaton, Bridge Administrator, Fifth Coast Guard District, at
(757)398-6222. SUPPLEMENTARY INFORMATION: The Coast Guard received a letter from the bridge manager, requesting a temporary deviation from the current operating schedule of the Route 9/Beesleys Point Bridge to undertake repairs. The draw currently is required to open on signal at all times. This requirement is included in the general operating regulations at 33 CFR 117.5. The work involves ironwork repairs to the bascule span of the bridge. To facilitate the repairs, the bascule span will be locked in the closed position so that concrete can undergo the curing process. This work requires completely immobilizing the operation of the bascule span. In the event of an emergency, openings of the span will be provided as quickly as possible, but may take up to 48 hours to accomplish. Requests for emergency openings can be made by calling the bridge manager at
(609)390-3190 or
(609)624-0949. In accordance with 33 CFR 117.35, the District Commander approved the contractor's request for a temporary deviation from the governing regulations in a letter dated February 22, 2002. The Coast Guard has informed the known commercial users of the waterway of the bridge closure so that these vessels can arrange their transits to minimize any impact caused by the temporary deviation. The temporary deviation allows the Route 9/Beesleys Point Bridge across Great Egg Harbor, mile 3.5, between Somers Point and Beesleys Point, New Jersey to remain closed Monday through Friday from 7 a.m. on March 11, 2002, until 5 p.m. on April 5, 2002. Dated: March 6, 2002. Ann B. Deaton, Chief, Bridge Administration Section, Fifth Coast Guard District. [FR Doc. 02-6358 Filed 3-15-02; 8:45 am]
Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Notices
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.