BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP01-141-000] PG&E Gas Transmission, Northwest Corporation; Notice of Technical Conference January 11, 2002. On August 6, 2001, the Commission issued an order granting PG&E Gas Transmission, Northwest Corporation (PG&E Transmission) a certificate of public convenience and necessity authorizing a proposed pipeline expansion project. 96 FERC ¶ 61,194 (2001). The PG&E Transmission certificate was conditioned upon PG&E Transmission developing a fuel surcharge mechanism to ensure that expansion shippers, rather than existing shippers, be responsible for all fuel costs above those attributable to fuel absent the proposed expansion's additional 97,500 horsepower of compression.
On October 26, 2001, on rehearing, the Commission reiterated its rationale for and affirmed the imposition of this fuel surcharge. 97 FERC ¶ 61,101 (2001). On November 26, 2001, PG&E Transmission filed a motion requesting the Commission reconsider the fuel surcharge for expansion shippers. Alternatively, PG&E Transmission requests the Commission initiate a technical conference to discuss aspects of the fuel charge. PG&E Transmission states that without further guidance it is unable to develop an incremental surcharge that both insulates existing shippers from fuel costs attributable to expansion compression, and at the same time, protects expansion shippers from fuel costs which do not reflect their actual share of such costs.
Take notice that a technical conference to discuss issues associated with the PG&E Transmission expansion project's fuel surcharge will be held on Tuesday, February 5, 2002, at 10:00 a.m. in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Conference will continue through Wednesday, February 6, 2002, if necessary. Parties objecting to aspects of PG&E Transmission's filings should be prepared to discuss alternatives.
All interested parties and staff are permitted to attend. C.B. Spencer, Acting Secretary. [FR Doc. 02-1228 Filed 1-16-02; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.