BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Tendered for Filing With the Commission, Establishing Procedures for Relicensing and Deadlines for Commenting on Alternative Procedures, and Submission of Final Amendments September 5, 2001. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* New Major License. b. *Project No.:* 346-037. c. *Date Filed:* August 23, 2001. d. *Applicant:* Minnesota Power Inc. e. *Name of Project:* Blanchard Hydroelectric Project. f. *Location:* On the Mississippi River near the City of Little Falls, in Morrison County, MN.
The project occupies federal lands of the Bureau of Land Management. g. *Filed Pursuant to:* Federal Power Act 16 U.S.C. 791(a)-825(r). h. *Applicant Contact:* Bob Bohm, Minnesota Power, Inc., P.O. Box 60, Little Falls, MN 56345, *rbohm@mnpower.com* 320-632-2318, ext. 5042. i. *FERC Contact:* Tom Dean, *thomas.dean@ferc.fed.us,* 202-219-2778. j. *Deadline for filing comments:* 30 days from the issuance date of this notice. All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commissions, 888 First Street, NE, Washington, DC 20426. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site under the “e-Filing” link. k. The existing Blanchard Project consists of:
(1)A 750-foot-long, 62-foot-high concrete gravity dam comprising:
(a)a 190-foot-long non-overflow section;
(b)a 437-foot-long gated spillway section;
(c)eight 44-foot-wide by 14.7-foot-high Taintor gates; and
(d)a 124-foot-wide integral powerhouse;
(2)approximately 3,540-foot-long earth dikes extending from both sides of the concrete dam;
(3)a 1,152-acre reservoir at normal water surface elevation of 1,081.7 feet NGVD;
(4)a powerhouse containing three generating units with a total installed capacity of 18,000 kW; and
(5)other appurtenances. l. A copy of the application is available for inspection and reproduction at the Commission's Public Reference and Files Maintenance Branch, located at 888 First Street, NE., Room 2-A, Washington, DC 20426, or by calling
(202)219-1371. Copies of this filing are on file with the Commission and are available for public inspection. This filing may also be viewed on the web at *http://www.ferc.gov* using the “RIMS” link, select “Docket#” and follow the instructions (call 202-208-2222 for assistance). A copy is also available for inspection and reproduction by contacting the applicant identified in item h above. m. Alternative procedures schedule and final amendments: The Commission staff proposes to issue one Environmental Assessment
(EA)rather than issuing a draft and final EA. Staff intends to allow at least 30 days for entities to comment on the EA before final action is taken on the license application. If any person or organization objects to the staff proposed alternative procedure, they should file comments as stipulated in item j above, briefly explaining the basis for their objection. The application will be processed according to the following milestones, some of which may be combined to expedite processing: Notice of application has been accepted for filing Notice soliciting final terms and conditions Notice of the availability of the NEPA document Order issuing the Commission's decision on the application Final amendments to the application must be filed with the Commission no later than 45 days from the issuance date of the notice soliciting final terms and conditions. David P. Boergers, Secretary. [FR Doc. 01-22719 Filed 9-10-01; 8:45 am]
Connectionstraces to 2
Citation graph
cites case law
Rules and Regulations
DEPARTMENT OF ENERGY
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.