Code · REGISTER · 2001-05-21 · DEPARTMENT OF ENERGY · Rules and Regulations

Rules and Regulations. DEPARTMENT OF ENERGY

566 words·~3 min read·/register/2001/05/21/01-12649·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File an Application for a New License May 15, 2001. a. *Type of Filing:* Notice of Intent to File An Application for a New License. b. *Project No.:* 2738. c. *Date Filed:* April 2, 2001. d. *Submitted By:* New York State Electric & Gas Corporation—current licensee. e. *Name of Project:* Saranac River Hydroelectric Project. f. *Location:* On the Saranac River near the City of Plattsburgh, in Clinton County, New York.
The project does not occupy federal lands. g. *Filed Pursuant to:* Section 15 of the Federal Power Act. h. *Licensee Contact:* Carol Howland, New York State Electric & Gas Corporation, Corporate Drive, Kirkwood Industrial Park, P.O. Box 5224, Binghamton, NY 13902, cahowland@nyseg.com,
(607)762-8881. i. *FERC Contact:* John Hannula, john.hannula@ferc.fed.us,
(202)219-0116. j. *Effective date of current license:* April 13, 1956. k. *Expiration date of current license:* April 12, 2006. l. *Description of the Project:* The project consists of the following four developments: The High Falls Development consists of the following existing facilities:
(1)A 63-foot-high, 274-foot-wide gravity dam topped with 5-foot-high flashboards comprised of:
(i)A spillway,
(ii)a 110-foot-long eastern wingwall, and
(iii)a 320-foot-long western wingwall;
(2)a 2,670-acre-foot storage reservoir with a maximum pool elevation of 1,036.5 feet msl;
(3)an 800-foot-long, 250-foot-wide forebay canal;
(4)a 10-foot-diameter, 1,280-foot-long penstock;
(5)an 11-foot by 12-foot, 3,581-foot-long tunnel;
(6)a 6-foot-diameter, 150-foot-long trifurcated penstock;
(7)a 30-foot-diameter, 76-foot-high surge tank;
(8)a powerhouse containing three generating unit with a total installed capacity of 15.0 MW,
(9)a 50-foot-long, 6.9-kV underground transmission line; and
(10)other appurtenances. The Cadyville Development consists of the following existing facilities:
(1)A 50-foot-high, 237-foot-wide gravity dam with a spillway topped with 2.7-foot-high flashboards;
(2)a 3,625-acre-foot storage reservoir with a maximum pool elevation of 729.3 feet msl;
(3)a 58-foot-long, 20-foot-wide intake structure;
(4)a 10-foot-diameter, 1,554-foot-long penstock;
(5)a powerhouse containing three generating unit with a total installed capacity of 5.5 MW,
(6)a 110-foot-long, 6.6-kV underground transmission line; and
(7)other appurtenances. The Mill C development consists of the following existing facilities:
(1)A 43-foot-high, 202-foot-wide gravity dam with a spillway topped with 2.0-foot-high flashboards;
(2)a 40.3-acre-foot storage reservoir with a maximum pool elevation of 651.9 feet msl;
(3)a 37-foot-long, 16-foot-wide intake structure;
(4)a 10-foot-diameter to 11.5-foot-diameter, 494-foot-long penstock;
(5)a 10-foot-diameter to 11.17-foot-diameter, 84-foot-long penstock;
(6)two powerhouses containing three generating unit with a total installed capacity of 6.05 MW,
(7)a 700-foot-long, 6.6-kV partially underground transmission line; and
(8)other appurtenances. The Kent Falls Development consists of the following existing facilities:
(1)A 59-foot-high, 172-foot-wide gravity dam with a spillway topped with 3.5-foot-high flashboards;
(2)a 265-acre-foot storage reservoir with a maximum pool elevation of 584.8 feet msl;
(3)a 29-foot-long, 22-foot-wide intake structure;
(4)an 11-foot-diameter, 2,668-foot-long penstock;
(5)a 28-foot-diameter, 32.5-foot-high surge tank;
(6)a powerhouse containing three generating unit with a total installed capacity of 12.4 MW,
(7)a 390-foot-long, 6.6-kV partially underground transmission line; and
(8)other appurtenances. m. Each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by April 12, 2004. David P. Boergers, Secretary. [FR Doc. 01-12649 Filed 5-18-01; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.