Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2001-02-26 · DEPARTMENT OF ENERGY · Rules and Regulations

Rules and Regulations. DEPARTMENT OF ENERGY

292 words·~1 min read·/register/2001/02/26/01-4585

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11856-000] City of Lockport, New York; Notice Rejecting Application for Preliminary Permit February 20, 2001. On August 8, 2000, the City of Lockport, New York (Lockport), filed an application for a preliminary permit, pursuant to Section 5 of the Federal Power Act (FPA), 16 U.S.C. 798, for the Independence Transmission Line Project, located in Lockport, Niagara County, New York. Following notice of the application, timely motions to intervene were filed by Niagara Mohawk Power Corporation (Niagara Mohawk) and Erie Boulevard Hydropower, L.P.
(Erie). 1 Lockport seeks a preliminary permit for a project comprising solely the existing Hydraulic Race-Lockport #751 transmission line, a 12-kilovolt line approximately 8,590 feet in length, owned by Niagara Mohawk. The line connects the exempted Project No. 2424, owned by Erie, to Niagara Mohawk's Lockport Substation. 1 As the motions to intervene were timely and not opposed, they are automatically granted, pursuant to 18 CFR 385.214(c) (2000). The Commission does not have jurisdiction over transmission lines connected to exempted projects. 2 It has jurisdiction only over primary transmission lines that transmit power from a licensed water power project or other hydroelectric project authorized by Congress. 3 Since the Commission cannot license the line, it does not entertain applications for a preliminary permit therefor.
Accordingly, the application for a preliminary permit is rejected. 2 *See* Order No. 76, FERC Stats. & Regs., Reg. Preambles ¶ 30,146 (1980). 3 *See* 18 CFR 4.70 (2000). This notice constitutes final agency action. Requests for rehearing by the Commission of this rejection may be filed within 30 days of the date of issuance of this notice, pursuant to 18 CFR 385.713. David P. Boergers, Secretary. [FR Doc. 01-4585 Filed 2-23-01; 8:45 am]
Connectionstraces to 4
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.