Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2001-02-09 · Coast Guard, DOT · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

407 words·~2 min read·/register/2001/02/09/01-3375·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DOT
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 01-3375 · CGD01-01-013 · 33 CFR 117

Summary

The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations governing the operation of the Chelsea Street Bridge, at mile 1.2, across the Chelsea River between East Boston and Chelsea, Massachusetts. This deviation allows the bridge owner to keep the bridge in the closed position from 6 a.m. on February 7, 2001 through 6 a.m. on February 8, 2001 and from 6 a.m. on February 21, 2001 through 6 a.m. on February 22, 2001. This action is necessary to facilitate emergency maintenance at the bridge.

Dates

This deviation is effective from February 7, 2001 through February 8, 2001 and from February 21, 2001 through February 22, 2001.

Supplementary Information

The Chelsea Street Bridge, at mile 1.2, across the Chelsea River, has a vertical clearance of 9 feet at mean high water, and 19 feet at mean low water in the closed position. The existing drawbridge operating regulations require the bridge to open on signal at all times. The bridge owner, the City of Boston, requested a temporary deviation from the drawbridge operating regulations to facilitate emergency structural maintenance and repairs to the alternate operating system at the bridge. This deviation from the operating regulations allows the bridge owner to keep the bridge in the closed position from 6 a.m. on February 7, 2001 through 6 a.m. on February 8, 2001 and from 6 a.m. on February 21, 2001 through 6 a.m. on February 22, 2001. Thirty days notice to the Cost Guard for approval of this maintenance repair was not given by the bridge owner and was not required because this work involves vital, unscheduled maintenance that must be performed without undue delay. Vessels that can pass under the bridge without an opening may do so at all times during the closed period. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: January 30, 2001. G.N. Naccara, U.S. Coast Guard, Commander, First Coast Guard District. [FR Doc. 01-3375 Filed 2-8-01; 8:45 am]

Connectionstraces to 1
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.