Rules and Regulations. DEPARTMENT OF ENERGY

775 words·~4 min read·/register/2000/02/02/00-2188·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions January 27, 2000. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. *Type of Application:* New Major License. b. *Project No.:* 2566-010. c. *Date filed:* March 30, 1999. d. *Applicant:* Consumers Energy Company. e. * Name of Project:* Webber Hydroelectric Project. f. *Location:* On the Grand River, in Lyons and Portland Townships, near the City of Portland, Ionia County, Michigan.
The project would not utilize federal lands. g. * Filed Pursuant to:* Federal Power Act, 16 U.S.C. §§ 791(a)-825(r). h. *Applicant Contact:* David Battige, Consumers Energy Company, Hydro Operations, 330 Chestnut Street, Cadillac, MI 49601,
(616)779-5506. i. *FERC Contact:* Tom Dean, *thomas.dean@ferc.fed.us.*
(202)219-2778. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. *Status of environmental analysis:* This application has been accepted for filing is now ready for environmental analysis. l. *Description of the Project:* The project consists of the following existing facilities:
(1)a 32-foot-high, 1,200-foot-long dam comprising:
(a)a 157-foot-long concrete powerhouse section,
(b)a 313-foot-long concrete spillway with 10 Taintor gates and one hydraulic flap gate, and
(c)two earth embankment sections having a combined total length of 730 feet;
(2)a 7-mile-long reservoir having a 660-acre surface area at a normal pool elevation of 684.4 feet USGS;
(3)a powerhouse containing two generating units with a total installed capacity of 3,250 kW; and
(4)other appurtenances. m. *Locations of the application:* A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, D.C. 20246, or by calling
(202)208-1371. The application may be viewed on the web at http://www.ferc.fed.us/online/rims.htm (call
(202)208-2222 for assistance). A copy is also available for inspection and reproduction at the address in item h above. Filing and Service of Responsive Documents—The application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and conditions and prescriptions concerning the application be filed with the Commission within 60 days from the issuance date of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. Anyone may obtain an extension of time for these deadlines from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with 18 CFR 385.2008. All filings must
(1)bear in all capital letters the title “COMMENTS”, “REPLY COMMENTS”, “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;”
(2)set forth in the heading the name of the applicant and the project number of the application to which the filing responds;
(3)furnish the name, address, and telephone number of the person submitting the filing; and
(4)otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. An additional copy must be sent to Director, Division of Project Review, Office of Hydropower Licensing, Federal Energy Regulatory Commission, at the above address. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. David P. Boergers, Secretary. [FR Doc. 00-2188 Filed 2-1-00; 8:45 am]
Connectionstraces to 4
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.